blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3412471

EP3412471 - INKJET PRINTER ASSEMBLY WITH UV IRRADIATION CONTROL AND METHOD FOR OPERATING SAID INKJET PRINTER ASSEMBLY [Right-click to bookmark this link]
Former [2018/50]INKJET PRINTER ASSEMBLY AND METHOD FOR OPERATING AN INKEJET PRINTER ASSEMBLY
[2021/29]
StatusNo opposition filed within time limit
Status updated on  17.03.2023
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  08.04.2022
FormerGrant of patent is intended
Status updated on  15.12.2021
FormerRequest for examination was made
Status updated on  12.11.2021
FormerGrant of patent is intended
Status updated on  22.07.2021
FormerRequest for examination was made
Status updated on  21.06.2019
FormerThe application has been published
Status updated on  09.11.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Canon Production Printing Holding B.V.
Van der Grintenstraat 10
5914 HH Venlo / NL
[2020/48]
Former [2020/13]For all designated states
Canon Production Printing Holding B.V.
St. Urbanusweg 43
5914 CA Venlo / NL
Former [2018/50]For all designated states
OCE Holding B.V.
101 St. Urbanusweg 43
5914 CA Venlo / NL
Inventor(s)01 / CURRAN, Dana
St. Urbanusweg 43
5914 CA VENLO / NL
02 / ELLERT, Bradley S.
ST. Urbanusweg 43
5914 CA VENLO / NL
03 / MAKARSKY, Alona L.
St. Ubanusweg 43
5914 CA VENLO / NL
 [2018/50]
Representative(s)Canon Production Printing IP Department
Canon Production Printing Netherlands B.V.
Van der Grintenstraat 10
5914 HH Venlo / NL
[2022/19]
Former [2018/50]OCE IP Department
St. Urbanusweg 43
5914 CA Venlo / NL
Application number, filing date18175699.004.06.2018
[2018/50]
Priority number, dateEP2017017475307.06.2017         Original published format: EP 17174753
[2018/50]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3412471
Date:12.12.2018
Language:EN
[2018/50]
Type: B1 Patent specification 
No.:EP3412471
Date:11.05.2022
Language:EN
[2022/19]
Search report(s)(Supplementary) European search report - dispatched on:EP24.09.2018
ClassificationIPC:B41J11/00, B41M7/00
[2021/29]
CPC:
B41J11/00212 (EP,US); B41J11/00214 (EP,US); B41M7/0081 (EP)
Former IPC [2018/50]B41J11/00, B29C64/112
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/30]
Former [2018/50]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:TINTENSTRAHLDRUCKERANORDNUNG MIT UV-BESTRAHLUNGSSTEUERUNG UND VERFAHREN ZUM BETRIEB DIESER TINTENSTRAHLDRUCKERANORDNUNG[2021/29]
English:INKJET PRINTER ASSEMBLY WITH UV IRRADIATION CONTROL AND METHOD FOR OPERATING SAID INKJET PRINTER ASSEMBLY[2021/29]
French:ENSEMBLE D'IMPRIMANTE À JET D'ENCRE AVEC CONTROLE DE L'IRRADIATION UV ET SON PROCÉDÉ DE FONCTIONNEMENT[2021/29]
Former [2018/50]TINTENSTRAHLDRUCKERANORDNUNG UND VERFAHREN ZUM BETRIEB EINER TINTENSTRAHLDRUCKERANORDNUNG
Former [2018/50]INKJET PRINTER ASSEMBLY AND METHOD FOR OPERATING AN INKEJET PRINTER ASSEMBLY
Former [2018/50]ENSEMBLE D'IMPRIMANTE À JET D'ENCRE ET SON PROCÉDÉ DE FONCTIONNEMENT
Examination procedure12.06.2019Examination requested  [2019/30]
12.06.2019Date on which the examining division has become responsible
23.07.2021Communication of intention to grant the patent
09.11.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
16.12.2021Communication of intention to grant the patent
31.03.2022Fee for grant paid
31.03.2022Fee for publishing/printing paid
31.03.2022Receipt of the translation of the claim(s)
Opposition(s)14.02.2023No opposition filed within time limit [2023/16]
Fees paidRenewal fee
30.06.2020Renewal fee patent year 03
30.06.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.06.2018
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
MK11.05.2022
MT11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR11.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
[2024/42]
Former [2024/23]HU04.06.2018
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
MK11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR11.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2024/20]HU04.06.2018
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR11.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2024/18]HU04.06.2018
AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR11.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2024/11]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR11.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/47]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR11.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/25]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
FR11.07.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/22]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
CH30.06.2022
LI30.06.2022
FR11.07.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/21]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
LU04.06.2022
CH30.06.2022
LI30.06.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/20]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
IE04.06.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/17]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/11]AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/09]AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/07]AT11.05.2022
DK11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/51]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/50]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/49]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/47]AT11.05.2022
ES11.05.2022
FI11.05.2022
LT11.05.2022
SE11.05.2022
NO11.08.2022
PT12.09.2022
Documents cited:Search[I]WO2004002746  (INCA DIGITAL PRINTERS LTD [GB], et al) [I] 1-15* the whole document *;
 [XI]US2007206083  (HOSHINO YOSHIHIDE [JP]) [X] 1,5,13,15 * paragraph [0011] - paragraph [0114] * [I] 9-12;
 [XI]JP2012116119  (SEIKO EPSON CORP) [X] 1-8,13,15 * abstract * [I] 9-12;
 [XI]JP2014223814  (SEIKO EPSON CORP) [X] 1-8,13-15 * figures 1-3 * [I] 9-12;
 [XI]EP2955028  (SEIKO EPSON CORP [JP]) [X] 1,5,13-15 * paragraph [0049] - paragraph [0056] * [I] 9;
 [X]EP3117999  (MIMAKI ENG CO LTD [JP]) [X] 1,5 * the whole document *
by applicantWO2008068211
 US9022514
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.