EP3579251 - SHATTER PROTECTION [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 25.11.2022 Database last updated on 13.11.2024 | |
Former | Request for examination was made Status updated on 19.06.2020 | ||
Former | The application has been published Status updated on 08.11.2019 | Most recent event Tooltip | 03.10.2024 | New entry: Despatch of examination report + time limit | Applicant(s) | For all designated states Hitachi Energy Ltd Brown-Boveri-Strasse 5 8050 Zürich / CH | [2023/50] |
Former [2022/03] | For all designated states Hitachi Energy Switzerland AG Bruggerstrasse 72 5400 Baden / CH | ||
Former [2020/32] | For all designated states ABB Power Grids Switzerland AG Bruggerstrasse 72 5400 Baden / CH | ||
Former [2019/50] | For all designated states ABB Schweiz AG Brown Boveri Strasse 6 5400 Baden / CH | Inventor(s) | 01 /
HORTLUND, Stefan Kyrkbyn 46 941 91 Piteå / SE | 02 /
HENRIKSSON, Magnus Pimpelv 24 974 41 Luleå / SE | 03 /
HOLMBERG, Anders Båtskatavägen 38 943 33 Öjebyn / SE | 04 /
JOHANSSON, Andre Trummagatan 13 943 33 Öjebyn / SE | [2019/50] | Representative(s) | Valea AB Box 7086 103 87 Stockholm / SE | [N/P] |
Former [2019/50] | Kransell & Wennborg KB P.O. Box 27834 115 93 Stockholm / SE | Application number, filing date | 18175911.9 | 05.06.2018 | [2019/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3579251 | Date: | 11.12.2019 | Language: | EN | [2019/50] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.12.2018 | Classification | IPC: | H01B17/00, H02G7/00 | [2019/50] | CPC: |
H01B17/00 (EP);
H01B17/56 (US);
H01B17/42 (US);
H01T4/04 (US);
H02G3/0412 (EP);
H02G7/00 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/30] |
Former [2019/50] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SPLITTERSCHUTZ | [2019/50] | English: | SHATTER PROTECTION | [2019/50] | French: | PROTECTION CONTRE LES BRIS | [2019/50] | Examination procedure | 11.06.2020 | Amendment by applicant (claims and/or description) | 11.06.2020 | Examination requested [2020/30] | 11.06.2020 | Date on which the examining division has become responsible | 29.11.2022 | Despatch of a communication from the examining division (Time limit: M04) | 29.03.2023 | Reply to a communication from the examining division | 24.10.2023 | Despatch of a communication from the examining division (Time limit: M04) | 02.02.2024 | Reply to a communication from the examining division | 02.10.2024 | Despatch of a communication from the examining division (Time limit: M04) | Fees paid | Renewal fee | 24.06.2020 | Renewal fee patent year 03 | 22.06.2021 | Renewal fee patent year 04 | 27.06.2022 | Renewal fee patent year 05 | 27.06.2023 | Renewal fee patent year 06 | 25.06.2024 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XAI]FR1370302 (LODGE COTTRELL LTD); | [A]EP0229464 (RAYCHEM GMBH [DE]); | [AD]JP3408893B ; | [A]WO2009089429 (ABB TECHNOLOGY AG [CH], et al); | [A]CN205354777U (ZHEJIANG GULAIFA ELECTRIC POWER FITTINGS CO LTD) | Examination | US2016351305 | by applicant | JP3408893B |