blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3578320

EP3578320 - CONFIGURING A HAZARDOUS AREA MONITORED BY A 3D SENSOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.07.2022
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  13.08.2021
FormerGrant of patent is intended
Status updated on  24.06.2021
FormerExamination is in progress
Status updated on  24.04.2020
FormerRequest for examination was made
Status updated on  21.02.2020
FormerThe application has been published
Status updated on  08.11.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
SICK AG
Erwin-Sick-Strasse 1
79183 Waldkirch / DE
[2020/08]
Former [2019/50]For all designated states
Sick AG
Erwin-Sick-Strasse 1
79183 Waldkirch / DE
Inventor(s)01 / Hornung, Armin
An der Rothhalde 16/3
79312 Emmendingen / DE
02 / Neubauer, Matthias
Kartäuserstr. 14
79102 Freiburg / DE
03 / Braune, Ingolf
Bahnhofstrasse 12
79194 Gundelfingen / DE
04 / MacNamara, Shane
Hornbergstr. 13
79285 Ebringen / DE
05 / Neumann, Thomas
Brandhof 9
79227 Schallstadt / DE
 [2019/50]
Application number, filing date18176458.007.06.2018
[2019/50]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3578320
Date:11.12.2019
Language:DE
[2019/50]
Type: B1 Patent specification 
No.:EP3578320
Date:15.09.2021
Language:DE
[2021/37]
Search report(s)(Supplementary) European search report - dispatched on:EP26.11.2018
ClassificationIPC:B25J9/16, G05B19/4061
[2019/50]
CPC:
B25J9/1676 (EP); G05B19/406 (US); G05B19/4061 (EP);
G06T7/521 (US); G06T7/593 (US); G06T7/80 (US);
H04N13/239 (US); H04N7/181 (US); G05B2219/37631 (EP);
G05B2219/50193 (US); G06T2207/30232 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/13]
Former [2019/50]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KONFIGURIEREN EINER VON EINEM 3D-SENSOR ÜBERWACHTEN GEFAHRENSTELLE[2019/50]
English:CONFIGURING A HAZARDOUS AREA MONITORED BY A 3D SENSOR[2019/50]
French:CONFIGURER UN ENDROIT DANGEREUX SURVEILLÉ PAR UN CAPTEUR TRIDIMENSIONNEL[2019/50]
Examination procedure13.02.2020Amendment by applicant (claims and/or description)
13.02.2020Examination requested  [2020/13]
13.02.2020Date on which the examining division has become responsible
30.04.2020Despatch of a communication from the examining division (Time limit: M04)
29.05.2020Reply to a communication from the examining division
04.09.2020Despatch of a communication from the examining division (Time limit: M04)
21.09.2020Reply to a communication from the examining division
03.06.2021Cancellation of oral proceeding that was planned for 22.06.2021
22.06.2021Date of oral proceedings (cancelled)
25.06.2021Communication of intention to grant the patent
06.08.2021Fee for grant paid
06.08.2021Fee for publishing/printing paid
06.08.2021Receipt of the translation of the claim(s)
Opposition(s)16.06.2022No opposition filed within time limit [2022/34]
Fees paidRenewal fee
30.03.2020Renewal fee patent year 03
23.06.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.06.2018
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
TR15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE07.06.2022
LU07.06.2022
[2024/29]
Former [2024/24]HU07.06.2018
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE07.06.2022
LU07.06.2022
Former [2024/23]AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE07.06.2022
LU07.06.2022
Former [2024/20]AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE07.06.2022
LU07.06.2022
Former [2023/21]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE07.06.2022
LU07.06.2022
Former [2023/20]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE07.06.2022
Former [2023/10]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/08]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/36]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/29]AL15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/25]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/24]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/23]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
PL15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
PT17.01.2022
Former [2022/10]FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/09]FI15.09.2021
LT15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/08]FI15.09.2021
LT15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/07]LT15.09.2021
NO15.12.2021
Documents cited:Search[XI]EP3142088  (SICK AG [DE]) [X] 1-3,5,7,11-14 * abstract * * paragraph [0002] - paragraph [0018] * * paragraph [0026] - paragraph [0040] * * paragraph [0051] - paragraph [0059] * * claim - * * figure - * [I] 4,6,8-10;
 [XD]EP2048557  (SICK AG [DE]) [XD] 1-3,8-14 * paragraph [0002] - paragraph [0026] * * paragraph [0043] - paragraph [0062] * * claim - *;
 [X]EP3189947  (SICK AG [DE]) [X] 1-3,11-14 * abstract * * paragraph [0010] - paragraph [0021] * * paragraph [0026] - paragraph [0027] * * claim - * * paragraph [0033] - paragraph [0045] * * figure - *
by applicantDE102005063217
 DE102012007242
 EP2023160
 EP2048557
 US6829371
 US9043025
 US2015217455
 EP3112900
 US2016140397
 US2016207198
 EP2275990
 EP3200122
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.