EP3582326 - ANTENNA COUPLING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.08.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 03.09.2021 | ||
Former | Grant of patent is intended Status updated on 28.04.2021 | ||
Former | Request for examination was made Status updated on 26.06.2020 | ||
Former | The application has been published Status updated on 15.11.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Nokia Solutions and Networks Oy Karakaari 7 02610 Espoo / FI | [2019/51] | Inventor(s) | 01 /
KUONANOJA, Reetta Laitisentie 1 C 2 90540 Oulu / FI | [2019/51] | Representative(s) | Nokia EPO representatives Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [2019/51] | Application number, filing date | 18177988.5 | 15.06.2018 | [2019/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3582326 | Date: | 18.12.2019 | Language: | EN | [2019/51] | Type: | B1 Patent specification | No.: | EP3582326 | Date: | 06.10.2021 | Language: | EN | [2021/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.12.2018 | Classification | IPC: | H01Q13/18, H01Q3/26, H01Q9/04, // H01Q21/28, H01Q1/24 | [2019/51] | CPC: |
H01Q13/18 (EP);
H01Q3/267 (EP);
H01Q9/0457 (EP);
H01Q1/246 (EP);
H01Q21/28 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/31] |
Former [2019/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ANTENNENKOPPLUNG | [2019/51] | English: | ANTENNA COUPLING | [2019/51] | French: | COUPLAGE D'ANTENNE | [2019/51] | Examination procedure | 18.06.2020 | Amendment by applicant (claims and/or description) | 18.06.2020 | Examination requested [2020/31] | 18.06.2020 | Date on which the examining division has become responsible | 29.04.2021 | Communication of intention to grant the patent | 30.08.2021 | Fee for grant paid | 30.08.2021 | Fee for publishing/printing paid | 30.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 07.07.2022 | No opposition filed within time limit [2022/37] | Fees paid | Renewal fee | 15.06.2020 | Renewal fee patent year 03 | 14.06.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.06.2018 | AL | 06.10.2021 | AT | 06.10.2021 | CY | 06.10.2021 | CZ | 06.10.2021 | DK | 06.10.2021 | EE | 06.10.2021 | ES | 06.10.2021 | FI | 06.10.2021 | HR | 06.10.2021 | IT | 06.10.2021 | LT | 06.10.2021 | LV | 06.10.2021 | MC | 06.10.2021 | MK | 06.10.2021 | MT | 06.10.2021 | NL | 06.10.2021 | PL | 06.10.2021 | RO | 06.10.2021 | RS | 06.10.2021 | SE | 06.10.2021 | SI | 06.10.2021 | SK | 06.10.2021 | SM | 06.10.2021 | BG | 06.01.2022 | NO | 06.01.2022 | GR | 07.01.2022 | IS | 06.02.2022 | PT | 07.02.2022 | IE | 15.06.2022 | LU | 15.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | FR | 30.06.2022 | LI | 30.06.2022 | [2024/44] |
Former [2024/24] | HU | 15.06.2018 | |
AL | 06.10.2021 | ||
AT | 06.10.2021 | ||
CY | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
IT | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
MK | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/23] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CY | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
IT | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
MK | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/20] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CY | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
IT | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/25] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
IT | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/22] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/21] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 15.06.2022 | ||
LU | 15.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/20] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 15.06.2022 | ||
Former [2023/08] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2023/01] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/49] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/35] | AT | 06.10.2021 | |
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/34] | AT | 06.10.2021 | |
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/33] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/25] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/24] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/23] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
PT | 07.02.2022 | ||
Former [2022/22] | AT | 06.10.2021 | |
FI | 06.10.2021 | ||
LT | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
Former [2022/21] | AT | 06.10.2021 | |
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
Former [2022/19] | BG | 06.01.2022 | Documents cited: | Search | [XAI]EP0605338 (FRANCE TELECOM [FR]) [X] 1-3,6 * figure 2 * * column 5 - column 6 * [A] 4,5,8-10,12-15 [I] 7; | [A]US5489913 (RAGUENET GERARD [FR], et al) [A] 11* column 3, line 29 - line 41; figure 5 *; | [A]US2003227420 (ROPER JOEL C [US], et al) [A] 1-15 * paragraph [0023] - paragraph [0030]; figure 3 *; | [XAI]US2005219123 (HANSEN THOMAS [DE], et al) [X] 1-3,9,12 * figure 6A * * paragraph [0003] - paragraph [0004] * * figure 1 * [A] 6-8,10,13-15 [I] 4,5; | [XAI] - MAJID- FAKHERI ET AL, "A broad band circularly polarized cross slot cavity back array antenna with sequentially rotated feed network for improving gain in X-band application", INTERNATIONAL JOURNAL OF MICROWAVE AND WIRELESS TECHNOLOGIES20141014CAMBRIDGE UNIVERSITY PRESSGBR, (20170523), vol. 9, no. 03, doi:10.1017/S1759078716000532, ISSN 1759-0787, pages 705 - 710, XP055531451 [X] 1-3,8,10,13 * figure 1 * * figure 4 * * page 707 - page 708 * [A] 4-7,9,12 [I] 14,15 DOI: http://dx.doi.org/10.1017/S1759078716000532 |