EP3396868 - METHOD AND APPARATUS FOR CONVEYING ANTENNA CONFIGURATION INFORMATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 20.04.2020 | ||
Former | Request for examination was made Status updated on 28.09.2018 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [2019/36] |
Former [2018/44] | For all designated states Nokia Technologies Oy Karaportti 3 02610 Espoo / FI | Inventor(s) | 01 /
RAAF, Bernhard Kollerweg 14 82061 Neuried / DE | 02 /
ROMAN, Timo Eric Lansanportti 1 C 13 02630 Espoo / FI | 03 /
CHMIEL, Mieszko Powastancow Slaskich 50/23 48-340 Glucholazy / PL | [2018/44] | Representative(s) | Cohausz & Florack Patent- & Rechtsanwälte Partnerschaftsgesellschaft mbB Bleichstraße 14 40211 Düsseldorf / DE | [2018/44] | Application number, filing date | 18178447.1 | 18.12.2008 | [2018/44] | Priority number, date | US20080969794 | 04.01.2008 Original published format: US 969794 | [2018/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3396868 | Date: | 31.10.2018 | Language: | EN | [2018/44] | Type: | B1 Patent specification | No.: | EP3396868 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.09.2018 | Classification | IPC: | H04B7/06 | [2018/44] | CPC: |
H04B7/0689 (EP,US);
H04B7/0619 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/44] | Title | German: | VERFAHREN UND VORRICHTUNG ZUR ÜBERTRAGUNG VON ANTENNENKONFIGURATIONSINFORMATIONEN | [2018/44] | English: | METHOD AND APPARATUS FOR CONVEYING ANTENNA CONFIGURATION INFORMATION | [2018/44] | French: | PROCÉDÉ ET APPAREIL POUR TRANSPORTER DES INFORMATIONS DE CONFIGURATION D'ANTENNE | [2018/44] | Examination procedure | 19.06.2018 | Examination requested [2018/44] | 19.06.2018 | Date on which the examining division has become responsible | 17.01.2019 | Amendment by applicant (claims and/or description) | 21.04.2020 | Communication of intention to grant the patent | 26.06.2020 | Fee for grant paid | 26.06.2020 | Fee for publishing/printing paid | 26.06.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP08870731.0 / EP2232727 | Divisional application(s) | EP20185196.1 / EP3800801 | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 19.06.2018 | Renewal fee patent year 03 | 19.06.2018 | Renewal fee patent year 04 | 19.06.2018 | Renewal fee patent year 05 | 19.06.2018 | Renewal fee patent year 06 | 19.06.2018 | Renewal fee patent year 07 | 19.06.2018 | Renewal fee patent year 08 | 19.06.2018 | Renewal fee patent year 09 | 19.06.2018 | Renewal fee patent year 10 | 21.12.2018 | Renewal fee patent year 11 | 13.12.2019 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | EE | 05.08.2020 | HR | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MT | 05.08.2020 | RO | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | TR | 05.08.2020 | BG | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | LU | 18.12.2020 | BE | 31.12.2020 | [2022/34] |
Former [2022/27] | AT | 05.08.2020 | |
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
EE | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
MT | 05.08.2020 | ||
RO | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
TR | 05.08.2020 | ||
BG | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
LU | 18.12.2020 | ||
Former [2021/47] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
EE | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
RO | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
BG | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
LU | 18.12.2020 | ||
Former [2021/40] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
EE | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
RO | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
BG | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
EE | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
BG | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
EE | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
SK | 05.08.2020 | ||
BG | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
EE | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
BG | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
BG | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
LT | 05.08.2020 | ||
BG | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | LT | 05.08.2020 | Documents cited: | Search | [A]US2007135161 (MOLNAR KARL [US], et al) [A] 1-12 * page 4, paragraph 36 - paragraph 37 * * figure 7 *; | [AP] - NOKIA SIEMENS NETWORKS ET AL, "CRC Mask Selection for PBCH", 3GPP DRAFT; R1-080944, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080205), vol. RAN WG1, no. Sorrento, Italy; 20080211, XP050109416 [AP] 1-12 * the whole document * | [AP] - NOKIA SIEMENS NETWORKS ET AL, "Issues with PBCH-based Blind Antenna Configuration Detection", 3GPP DRAFT; R1-080324, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080108), vol. RAN WG1, no. Sevilla, Spain; 20080114, XP050108845 [AP] 1-12 * the whole document * | [AP] - NOKIA SIEMENS NETWORKS ET AL, "Way Forward on PBCH for FDD and TDD", 3GPP DRAFT; R1-080586, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080117), vol. RAN WG1, no. Sevilla, Spain; 20080114, XP050109087 [AP] 1-12 * the whole document * |