blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3588109

EP3588109 - FAIL-SAFE RETROFITTING KIT FOR A PARTIAL DISCHARGE MONITORING SYSTEM AND A PREINSTALLED VOLTAGE INDICATION SYSTEM (VIS) [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.07.2023
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  29.07.2022
FormerGrant of patent is intended
Status updated on  22.03.2022
FormerRequest for examination was made
Status updated on  03.07.2020
FormerThe application has been published
Status updated on  05.12.2019
Most recent event   Tooltip26.01.2024Lapse of the patent in a contracting state
New state(s): MC
published on 28.02.2024  [2024/09]
Applicant(s)For all designated states
ABB Schweiz AG
Bruggerstrasse 66
5400 Baden / CH
[2022/34]
Former [2020/01]For all designated states
ABB Schweiz AG
Brown Boveri Strasse 6
5400 Baden / CH
Inventor(s)01 / Maret, Yannick
Pilgerstrasse 27
5405 Daettwil / CH
02 / Hencken, Kai
Holzgasse 41A
79539 Lörrach / DE
 [2020/01]
Representative(s)Zimmermann & Partner Patentanwälte mbB
Postfach 330 920
80069 München / DE
[2020/01]
Application number, filing date18180871.829.06.2018
[2020/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3588109
Date:01.01.2020
Language:EN
[2020/01]
Type: B1 Patent specification 
No.:EP3588109
Date:31.08.2022
Language:EN
[2022/35]
Search report(s)(Supplementary) European search report - dispatched on:EP21.12.2018
ClassificationIPC:G01R31/12
[2020/01]
CPC:
G01R31/1227 (EP,CN); G01R1/36 (US); G01R21/133 (US);
G01R22/063 (US); H02J13/00009 (US); Y02E60/00 (EP);
Y04S40/121 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/32]
Former [2020/01]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:AUSFALLSICHERER NACHRÜSTSATZ FÜR EIN TEILENTLADUNGSÜBERWACHUNGSSYSTEM UND EIN VORINSTALLIERTES SPANNUNGSANZEIGESYSTEM (VIS)[2020/01]
English:FAIL-SAFE RETROFITTING KIT FOR A PARTIAL DISCHARGE MONITORING SYSTEM AND A PREINSTALLED VOLTAGE INDICATION SYSTEM (VIS)[2020/01]
French:KIT DE RATTRAPAGE À SÉCURITÉ INTÉGRÉE POUR UN SYSTÈME DE SURVEILLANCE DE DÉCHARGE PARTIELLE ET UN SYSTÈME D'INDICATION DE TENSION PRÉINSTALLÉ (VIS)[2020/01]
Examination procedure30.06.2020Amendment by applicant (claims and/or description)
30.06.2020Examination requested  [2020/32]
30.06.2020Date on which the examining division has become responsible
23.03.2022Communication of intention to grant the patent
15.07.2022Fee for grant paid
15.07.2022Fee for publishing/printing paid
15.07.2022Receipt of the translation of the claim(s)
Opposition(s)01.06.2023No opposition filed within time limit [2023/32]
Fees paidRenewal fee
24.06.2020Renewal fee patent year 03
22.06.2021Renewal fee patent year 04
27.06.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL31.08.2022
AT31.08.2022
CZ31.08.2022
DK31.08.2022
EE31.08.2022
ES31.08.2022
FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
MC31.08.2022
NL31.08.2022
PL31.08.2022
RO31.08.2022
RS31.08.2022
SE31.08.2022
SI31.08.2022
SK31.08.2022
SM31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
PT02.01.2023
[2024/09]
Former [2023/37]AL31.08.2022
AT31.08.2022
CZ31.08.2022
DK31.08.2022
EE31.08.2022
ES31.08.2022
FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
NL31.08.2022
PL31.08.2022
RO31.08.2022
RS31.08.2022
SE31.08.2022
SI31.08.2022
SK31.08.2022
SM31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
PT02.01.2023
Former [2023/30]AL31.08.2022
AT31.08.2022
CZ31.08.2022
DK31.08.2022
EE31.08.2022
ES31.08.2022
FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
NL31.08.2022
PL31.08.2022
RO31.08.2022
RS31.08.2022
SE31.08.2022
SK31.08.2022
SM31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
PT02.01.2023
Former [2023/29]AL31.08.2022
AT31.08.2022
CZ31.08.2022
DK31.08.2022
EE31.08.2022
ES31.08.2022
FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
PL31.08.2022
RO31.08.2022
RS31.08.2022
SE31.08.2022
SK31.08.2022
SM31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
PT02.01.2023
Former [2023/23]AT31.08.2022
CZ31.08.2022
DK31.08.2022
EE31.08.2022
ES31.08.2022
FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
PL31.08.2022
RO31.08.2022
RS31.08.2022
SE31.08.2022
SK31.08.2022
SM31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
PT02.01.2023
Former [2023/22]AT31.08.2022
CZ31.08.2022
DK31.08.2022
ES31.08.2022
FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
PL31.08.2022
RO31.08.2022
RS31.08.2022
SE31.08.2022
SM31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
PT02.01.2023
Former [2023/21]DK31.08.2022
FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
PL31.08.2022
RS31.08.2022
SE31.08.2022
SM31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
Former [2023/20]FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
PL31.08.2022
RS31.08.2022
SE31.08.2022
SM31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
Former [2023/12]FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
PL31.08.2022
RS31.08.2022
SE31.08.2022
NO30.11.2022
GR01.12.2022
IS31.12.2022
Former [2023/11]FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
PL31.08.2022
RS31.08.2022
SE31.08.2022
NO30.11.2022
GR01.12.2022
Former [2023/10]FI31.08.2022
HR31.08.2022
LT31.08.2022
LV31.08.2022
RS31.08.2022
SE31.08.2022
NO30.11.2022
GR01.12.2022
Former [2023/09]FI31.08.2022
LT31.08.2022
LV31.08.2022
RS31.08.2022
SE31.08.2022
NO30.11.2022
Former [2023/08]FI31.08.2022
LT31.08.2022
RS31.08.2022
SE31.08.2022
NO30.11.2022
Documents cited:Search[XI]US4779051  (GRUENEWALD PETER [DE], et al) [X] 1 * abstract * * column 1, line 40 - column 3, line 11 * * column 3, line 56 - column 6, line 65 * [I] 2-15;
 [A]DE10304396  (KRIES ENERGIETECHNIK GMBH & CO [DE]) [A] 1-15 * abstract * * paragraph [0008] - paragraph [0015] ** paragraph [0022] - paragraph [0045] *;
 [A]DE202010016782U  (KRIES ENERGIETECHNIK GMBH & CO KG [DE]) [A] 1-15 * abstract * * paragraph [0007] - paragraph [0015] * * paragraph [0020] - paragraph [0044] *;
 [A]CN107179483  (HAINAN POWER TECH RESEARCH INSTITUTE, et al) [A] 1-15 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.