EP3434868 - EDDY CURRENT DAMPER FOR A LIFT OFF SEAL IN A GAS TURBINE ENGINE [Right-click to bookmark this link] | |||
Former [2019/05] | EDDY CURRENT DAMPER FOR LIFT OFF SEAL IN A GAS TURBINE ENGINE | ||
[2020/51] | Status | No opposition filed within time limit Status updated on 04.03.2022 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 26.03.2021 | ||
Former | Grant of patent is intended Status updated on 25.11.2020 | ||
Former | Examination is in progress Status updated on 01.04.2020 | ||
Former | Request for examination was made Status updated on 02.08.2019 | ||
Former | The application has been published Status updated on 30.12.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Raytheon Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | [2021/12] |
Former [2019/05] | For all designated states United Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | Inventor(s) | 01 /
LOMENZO, Richard A. 1220 Enfield Street Enfield, CT Connecticut 06082 / US | 02 /
GYSLING, Daniel L. 143 South Pond Road South Glastonbury, CT Connecticut 06073 / US | 03 /
PATURZO, Joseph V. 200 Arch Road Avon, CT Connecticut 06001 / US | [2019/05] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2021/17] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2019/05] | Dehns St. Brides House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 18181977.2 | 05.07.2018 | [2019/05] | Priority number, date | US201715657882 | 24.07.2017 Original published format: US201715657882 | [2019/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3434868 | Date: | 30.01.2019 | Language: | EN | [2019/05] | Type: | B1 Patent specification | No.: | EP3434868 | Date: | 28.04.2021 | Language: | EN | [2021/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.11.2018 | Classification | IPC: | F01D11/00, F01D25/16, F16J15/34, F04D29/058 | [2019/05] | CPC: |
F01D11/003 (EP,US);
F01D11/005 (EP,US);
F01D25/16 (EP,US);
F16J15/3444 (EP,US);
F05D2220/32 (US);
F05D2240/60 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/36] |
Former [2019/05] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | WIRBELSTROMDÄMPFER FÜR EINE LIFT-OFF-DICHTUNG IN EINEM GASTURBINENTRIEBWERK | [2020/51] | English: | EDDY CURRENT DAMPER FOR A LIFT OFF SEAL IN A GAS TURBINE ENGINE | [2020/51] | French: | AMORTISSEUR DE COURANT DE FOUCAULT POUR UN JOINT DE DÉCOLLEMENT DANS UN MOTEUR À TURBINE Á GAZ | [2020/51] |
Former [2019/05] | WIRBELSTROMDÄMPFER FÜR LIFT-OFF-DICHTUNG IN EINER GASTURBINE | ||
Former [2019/05] | EDDY CURRENT DAMPER FOR LIFT OFF SEAL IN A GAS TURBINE ENGINE | ||
Former [2019/05] | AMORTISSEUR DE COURANT DE FOUCAULT POUR JOINT DE DÉCOLLEMENT DANS UNE TURBINE Á GAZ | Examination procedure | 26.07.2019 | Amendment by applicant (claims and/or description) | 26.07.2019 | Examination requested [2019/36] | 26.07.2019 | Date on which the examining division has become responsible | 06.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 06.08.2020 | Reply to a communication from the examining division | 26.11.2020 | Communication of intention to grant the patent | 23.03.2021 | Fee for grant paid | 23.03.2021 | Fee for publishing/printing paid | 23.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.01.2022 | No opposition filed within time limit [2022/14] | Fees paid | Renewal fee | 22.07.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.07.2018 | AL | 28.04.2021 | AT | 28.04.2021 | CY | 28.04.2021 | CZ | 28.04.2021 | DK | 28.04.2021 | EE | 28.04.2021 | ES | 28.04.2021 | FI | 28.04.2021 | HR | 28.04.2021 | IT | 28.04.2021 | LT | 28.04.2021 | LV | 28.04.2021 | MC | 28.04.2021 | MK | 28.04.2021 | MT | 28.04.2021 | NL | 28.04.2021 | PL | 28.04.2021 | RO | 28.04.2021 | RS | 28.04.2021 | SE | 28.04.2021 | SI | 28.04.2021 | SK | 28.04.2021 | SM | 28.04.2021 | IE | 05.07.2021 | LU | 05.07.2021 | BG | 28.07.2021 | NO | 28.07.2021 | GR | 29.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | IS | 28.08.2021 | PT | 30.08.2021 | [2024/42] |
Former [2024/23] | HU | 05.07.2018 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
MK | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2023/33] | HU | 05.07.2018 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2023/30] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/36] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/35] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/34] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/29] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/26] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/23] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
LU | 05.07.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/21] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/08] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/07] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/52] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/51] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/50] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
Former [2021/49] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
Former [2021/46] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
NL | 28.04.2021 | ||
BG | 28.07.2021 | Documents cited: | Search | [A]EP0453179 (GEN ELECTRIC [US]) [A] 1-15 * abstract * * column 1, line 19 - line 27 * * column 12, line 34 - line 42 *; | [A]WO0116510 (ESKOM [ZA], et al) [A] 1-15 * page 1, line 16 - line 21 * * page 2, line 39 - line 45 * * page 3, line 80 - page 4, line 79 * * page 8, line 165 - page 9, line 195 * * page 11, line 240 - line 245 * * page 12, line 262 - page 13, line 274 * * figures 1-3 *; | [YA]US6220602 (WEBSTER JOHN R [GB], et al) [Y] 1-10,12-15 * column 4, line 1 - line 23 * * column 4, line 56 - column 5, line 36 * * column 5, line 9 - line 36 * * column 6, line 31 - line 37 * * figures 2,3 * [A] 11; | [YA]US2012321439 (MAIER MARTIN D [US]) [Y] 1-10,12-15 * abstract * * paragraphs [0021] , [0025] , [0031]; figure 1 * [A] 11; | [A]EP2716943 (SIEMENS AG [DE]) [A] 1-15 * abstract ** paragraph [0023]; figure 2 * |