EP3444799 - PIXEL CIRCUIT, DISPLAY DEVICE, AND METHOD OF DRIVING PIXEL CIRCUIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.07.2021 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 31.07.2020 | ||
Former | Grant of patent is intended Status updated on 30.03.2020 | ||
Former | Examination is in progress Status updated on 22.11.2019 | ||
Former | Request for examination was made Status updated on 18.01.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Sony Group Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2021/30] |
Former [2019/08] | For all designated states Sony Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | Inventor(s) | 01 /
Uchino, Katsuhide c/o Sony Corporation 1-7-1 Konan, Minato-ku Tokyo, 108-0075 / JP | 02 /
Yamashita, Junichi c/o Sony Corporation 1-7-1 Konan, Minato-ku Tokyo, 108-0075 / JP | 03 /
Yamamoto, Tetsuro c/o Sony Corporation 1-7-1 Konan, Minato-ku Tokyo, 108-0075 / JP | [2019/08] | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2019/08] | Application number, filing date | 18183422.7 | 21.05.2004 | [2019/08] | Priority number, date | JP20030146758 | 23.05.2003 Original published format: JP 2003146758 | [2019/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3444799 | Date: | 20.02.2019 | Language: | EN | [2019/08] | Type: | B1 Patent specification | No.: | EP3444799 | Date: | 02.09.2020 | Language: | EN | [2020/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.01.2019 | Classification | IPC: | G09G3/30, G09G3/20, G09G3/3233, H05B33/08 | [2019/08] | CPC: |
G09G3/3233 (EP,US);
G09G3/30 (KR,US);
G09G3/20 (KR);
G09G3/3258 (US);
G09G3/3426 (US);
G09G3/36 (US);
G09G3/3648 (US);
H05B45/60 (US);
G09G2300/043 (EP,US);
G09G2300/0809 (EP,US);
G09G2300/0819 (EP,US);
G09G2300/0842 (EP,US);
G09G2300/0861 (EP,US);
G09G2310/0256 (EP,US);
G09G2320/0233 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2019/08] | Title | German: | PIXELSCHALTUNG, ANZEIGEVORRICHTUNG UND VERFAHREN ZUR ANSTEUERUNG EINER PIXELSCHALTUNG | [2019/08] | English: | PIXEL CIRCUIT, DISPLAY DEVICE, AND METHOD OF DRIVING PIXEL CIRCUIT | [2019/08] | French: | CIRCUIT DE PIXELS, DISPOSITIF D'AFFICHAGE ET PROCÉDÉ D'ALIMENTATION D'UN CIRCUIT DE PIXELS | [2019/08] | Examination procedure | deleted | Date on which the examining division has become responsible | 13.07.2018 | Examination requested [2019/08] | 20.08.2019 | Amendment by applicant (claims and/or description) | 27.11.2019 | Despatch of a communication from the examining division (Time limit: M03) | 05.03.2020 | Reply to a communication from the examining division | 31.03.2020 | Communication of intention to grant the patent | 27.07.2020 | Fee for grant paid | 27.07.2020 | Fee for publishing/printing paid | 27.07.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP04734390.0 / EP1628283 | EP15192807.4 / EP2996108 | Divisional application(s) | EP20190414.1 / EP3754642 | Opposition(s) | 03.06.2021 | No opposition filed within time limit [2021/32] | Fees paid | Renewal fee | 13.07.2018 | Renewal fee patent year 03 | 13.07.2018 | Renewal fee patent year 04 | 13.07.2018 | Renewal fee patent year 05 | 13.07.2018 | Renewal fee patent year 06 | 13.07.2018 | Renewal fee patent year 07 | 13.07.2018 | Renewal fee patent year 08 | 13.07.2018 | Renewal fee patent year 09 | 13.07.2018 | Renewal fee patent year 10 | 13.07.2018 | Renewal fee patent year 11 | 13.07.2018 | Renewal fee patent year 12 | 13.07.2018 | Renewal fee patent year 13 | 13.07.2018 | Renewal fee patent year 14 | 13.07.2018 | Renewal fee patent year 15 | 23.05.2019 | Renewal fee patent year 16 | 30.03.2020 | Renewal fee patent year 17 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.05.2004 | AT | 02.09.2020 | CY | 02.09.2020 | CZ | 02.09.2020 | DK | 02.09.2020 | EE | 02.09.2020 | ES | 02.09.2020 | FI | 02.09.2020 | IT | 02.09.2020 | MC | 02.09.2020 | PL | 02.09.2020 | RO | 02.09.2020 | SE | 02.09.2020 | SI | 02.09.2020 | SK | 02.09.2020 | TR | 02.09.2020 | NL | 23.09.2020 | BG | 02.12.2020 | GR | 03.12.2020 | PT | 04.01.2021 | IE | 21.05.2021 | LU | 21.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2024/29] |
Former [2023/33] | HU | 21.05.2004 | |
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
NL | 23.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
IE | 21.05.2021 | ||
LU | 21.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/32] | AT | 02.09.2020 | |
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
NL | 23.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
IE | 21.05.2021 | ||
LU | 21.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/29] | AT | 02.09.2020 | |
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
NL | 23.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
IE | 21.05.2021 | ||
LU | 21.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/24] | AT | 02.09.2020 | |
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
IE | 21.05.2021 | ||
LU | 21.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/22] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
IE | 21.05.2021 | ||
LU | 21.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
IE | 21.05.2021 | ||
LU | 21.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
IE | 21.05.2021 | ||
LU | 21.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/11] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
LU | 21.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
LU | 21.05.2021 | ||
Former [2021/48] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
IT | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/37] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/36] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/28] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/25] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/22] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/21] | FI | 02.09.2020 | |
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/10] | FI | 02.09.2020 | |
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/09] | FI | 02.09.2020 | |
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/08] | FI | 02.09.2020 | |
SE | 02.09.2020 | ||
BG | 02.12.2020 | Documents cited: | Search | [X]US2003016190 (KONDO SHIGEKI [JP]); | [X]CN1417767 (SANYO ELECTRIC CO [JP]); | [XI]US2003090481 (KIMURA HAJIME [JP]); | [P]US2003103022 (NOGUCHI YUKIHIRO [JP], et al) | by applicant | JPH08234683 | US5684365 |