EP3444132 - METHOD FOR DETERMINING A WHEEL CIRCUMFERENCE OF A DRIVE WHEEL, CONTROL METHOD FOR A DRIVE MOTOR, CONTROLLER APPARATUS AND AUTOMOBILE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.04.2021 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 22.05.2020 | ||
Former | Grant of patent is intended Status updated on 28.03.2020 | ||
Former | Examination is in progress Status updated on 04.12.2019 | ||
Former | Request for examination was made Status updated on 23.08.2019 | ||
Former | The application has been published Status updated on 18.01.2019 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2019/08] | For all designated states Robert Bosch GmbH P.O. Box 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
Stegmaier, Juergen Simon-Hayum-Str. 6 72074 Tuebingen / DE | 02 /
Greiner, Rinaldo Kurt-Schumacher-Str. 32 72762 Reutlingen / DE | [2019/08] | Application number, filing date | 18184193.3 | 18.07.2018 | [2019/08] | Priority number, date | DE201710214294 | 16.08.2017 Original published format: DE102017214294 | [2019/08] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3444132 | Date: | 20.02.2019 | Language: | DE | [2019/08] | Type: | B1 Patent specification | No.: | EP3444132 | Date: | 24.06.2020 | Language: | DE | [2020/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.12.2018 | Classification | IPC: | B60C23/04, B60W40/12 | [2019/08] | CPC: |
B62M6/50 (EP,US);
B60W10/08 (US);
B60W40/12 (US);
B62M6/40 (EP,US);
B62M6/55 (EP,US);
B60W2520/105 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/39] |
Former [2019/08] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR ERMITTLUNG EINES RADUMFANGS EINES ANTRIEBSRADS, STEUERUNGSVERFAHREN FÜR EINEN ANTRIEBSMOTOR, STEUERGERÄT UND FAHRZEUG | [2019/08] | English: | METHOD FOR DETERMINING A WHEEL CIRCUMFERENCE OF A DRIVE WHEEL, CONTROL METHOD FOR A DRIVE MOTOR, CONTROLLER APPARATUS AND AUTOMOBILE | [2019/08] | French: | PROCÉDÉ DE DÉTERMINATION D'UNE CIRCONFÉRENCE DE ROUE D'UNE ROUE D'ENTRAÎNEMENT, PROCÉDÉ DE COMMANDE D'UN MOTEUR D'ENTRAÎNEMENT, APPAREIL DE COMMANDE ET VÉHICULE | [2019/08] | Examination procedure | 10.01.2019 | Amendment by applicant (claims and/or description) | 20.08.2019 | Examination requested [2019/39] | 20.08.2019 | Date on which the examining division has become responsible | 09.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 20.02.2020 | Reply to a communication from the examining division | 06.04.2020 | Communication of intention to grant the patent | 11.05.2020 | Fee for grant paid | 11.05.2020 | Fee for publishing/printing paid | 11.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 25.03.2021 | No opposition filed within time limit [2021/22] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.07.2018 | AL | 24.06.2020 | CY | 24.06.2020 | CZ | 24.06.2020 | DK | 24.06.2020 | EE | 24.06.2020 | FI | 24.06.2020 | HR | 24.06.2020 | LT | 24.06.2020 | LV | 24.06.2020 | MC | 24.06.2020 | MK | 24.06.2020 | MT | 24.06.2020 | PL | 24.06.2020 | RO | 24.06.2020 | RS | 24.06.2020 | SE | 24.06.2020 | SI | 24.06.2020 | SK | 24.06.2020 | SM | 24.06.2020 | TR | 24.06.2020 | IE | 18.07.2020 | LU | 18.07.2020 | BE | 31.07.2020 | FR | 24.08.2020 | BG | 24.09.2020 | NO | 24.09.2020 | GR | 25.09.2020 | IS | 24.10.2020 | PT | 26.10.2020 | [2022/33] |
Former [2022/27] | HU | 18.07.2018 | |
AL | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
MT | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
TR | 24.06.2020 | ||
IE | 18.07.2020 | ||
LU | 18.07.2020 | ||
BE | 31.07.2020 | ||
FR | 24.08.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/37] | AL | 24.06.2020 | |
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
IE | 18.07.2020 | ||
LU | 18.07.2020 | ||
BE | 31.07.2020 | ||
FR | 24.08.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/36] | AL | 24.06.2020 | |
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
LU | 18.07.2020 | ||
BE | 31.07.2020 | ||
FR | 24.08.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/35] | AL | 24.06.2020 | |
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
LU | 18.07.2020 | ||
BE | 31.07.2020 | ||
FR | 24.08.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/24] | AL | 24.06.2020 | |
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
LU | 18.07.2020 | ||
BE | 31.07.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/20] | AL | 24.06.2020 | |
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
LU | 18.07.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/18] | AL | 24.06.2020 | |
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/10] | AL | 24.06.2020 | |
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/09] | AL | 24.06.2020 | |
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
PT | 26.10.2020 | ||
Former [2021/04] | AL | 24.06.2020 | |
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2021/01] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/51] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/50] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/48] | FI | 24.06.2020 | |
LT | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
Former [2020/47] | LT | 24.06.2020 | |
NO | 24.09.2020 | Documents cited: | Search | [A]WO2007074048 (CONTINENTAL TEVES AG & CO OHG [DE], et al) [A] 1,4-7 * page 13, paragraphs 2-4; claim 3 *; | [AD]DE102012201881 (BOSCH GMBH ROBERT [DE]) [AD] 1* paragraphs [0011] , [0018]; figure 1 *; | [XA]DE102016006869 (DAIMLER AG [DE]) [X] 3 * paragraphs [0008] - [0014]; figure 1 * [A] 1,2,4-7 | Examination | DE102010000867 | by applicant | EP1213561 | DE102012201881 |