| EP3434850 - ELECTRONIC LOCK FOR A TWO WHEELER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.04.2021 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 22.05.2020 | ||
| Former | Grant of patent is intended Status updated on 14.12.2019 | ||
| Former | Request for examination was made Status updated on 21.06.2019 | ||
| Former | The application has been published Status updated on 30.12.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): GR, MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states ABUS August Bremicker Söhne KG Altenhofer Weg 25 58300 Wetter-Volmarstein / DE | [2019/05] | Inventor(s) | 01 /
* * * | [2019/05] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Straße 1 80336 München / DE | [N/P] |
| Former [2020/26] | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Strasse 1 80336 München / DE | ||
| Former [2019/05] | Manitz Finsterwald Patentanwälte PartmbB Martin-Greif-Strasse 1 80336 München / DE | Application number, filing date | 18185146.0 | 24.07.2018 | [2019/05] | Priority number, date | DE201710116941 | 26.07.2017 Original published format: DE102017116941 | [2019/05] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3434850 | Date: | 30.01.2019 | Language: | DE | [2019/05] | Type: | B1 Patent specification | No.: | EP3434850 | Date: | 24.06.2020 | Language: | DE | [2020/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.11.2018 | Classification | IPC: | E05B47/00, E05B63/00, E05B71/00, B62H5/14 | [2019/05] | CPC: |
B62H5/14 (EP,CN,US);
E05B47/0002 (CN);
B62H5/08 (US);
E05B47/00 (EP,US);
E05B47/0038 (CN);
E05B47/06 (CN);
E05B63/0056 (EP,US);
E05B71/00 (EP,US);
E05B81/14 (US);
E05B81/56 (US);
E05B81/68 (US);
E05B81/72 (US);
E05B2047/0094 (EP,CN,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/30] |
| Former [2019/05] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ELEKTRONISCHES ZWEIRADSCHLOSS | [2019/05] | English: | ELECTRONIC LOCK FOR A TWO WHEELER | [2019/05] | French: | SERRURE ÉLECTRONIQUE POUR DEUX ROUES | [2019/05] | Examination procedure | 13.06.2019 | Examination requested [2019/30] | 13.06.2019 | Date on which the examining division has become responsible | 23.07.2019 | Amendment by applicant (claims and/or description) | 02.01.2020 | Communication of intention to grant the patent | 11.05.2020 | Fee for grant paid | 11.05.2020 | Fee for publishing/printing paid | 11.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 25.03.2021 | No opposition filed within time limit [2021/22] |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.07.2018 | AL | 24.06.2020 | CY | 24.06.2020 | CZ | 24.06.2020 | EE | 24.06.2020 | ES | 24.06.2020 | FI | 24.06.2020 | GR | 24.06.2020 | HR | 24.06.2020 | IT | 24.06.2020 | LT | 24.06.2020 | LV | 24.06.2020 | MC | 24.06.2020 | MK | 24.06.2020 | MT | 24.06.2020 | PL | 24.06.2020 | RO | 24.06.2020 | RS | 24.06.2020 | SI | 24.06.2020 | SK | 24.06.2020 | SM | 24.06.2020 | TR | 24.06.2020 | IE | 24.07.2020 | LU | 24.07.2020 | BG | 24.09.2020 | NO | 24.09.2020 | IS | 24.10.2020 | PT | 26.10.2020 | [2022/33] |
| Former [2022/27] | HU | 24.07.2018 | |
| AL | 24.06.2020 | ||
| CY | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| ES | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| MT | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| TR | 24.06.2020 | ||
| IE | 24.07.2020 | ||
| LU | 24.07.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/37] | AL | 24.06.2020 | |
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| ES | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| IE | 24.07.2020 | ||
| LU | 24.07.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/36] | AL | 24.06.2020 | |
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| ES | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| LU | 24.07.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/20] | AL | 24.06.2020 | |
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| ES | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| LU | 24.07.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/18] | AL | 24.06.2020 | |
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| ES | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/10] | AL | 24.06.2020 | |
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| ES | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/09] | AL | 24.06.2020 | |
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| ES | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/04] | AL | 24.06.2020 | |
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| Former [2021/01] | FI | 24.06.2020 | |
| HR | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| Former [2020/51] | FI | 24.06.2020 | |
| HR | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| NO | 24.09.2020 | ||
| Former [2020/48] | FI | 24.06.2020 | |
| LT | 24.06.2020 | ||
| NO | 24.09.2020 | ||
| Former [2020/47] | LT | 24.06.2020 | |
| NO | 24.09.2020 | Documents cited: | Search | [IA] US5291761 (LII JEIN-HEI et al.) [I] 1,2,8-11,13,14 * the whole document *[A] 3-7,12,15 | [IA] DE102015013228 (DEUTSCHE TELEKOM AG et al.) [I] 1,2,5-8 * Absätze [0010], [0019], [0020], [0033], [0039], [0049]-[0060];; figures 1-3 *[A] 3,4,9-15 | [IA] CN106892027 (XIAOSUN TECH (SHENZHEN) CO LTD et al.) [I] 1-3,5,7,8,10,11 * page 4, line 26 - page 8, line 34; figures 1-5 *[A] 4,6,9,12-15 | [A] US6761051 (TSAI HUNG-CHENG et al.) [A] 1-15 * column 2, line 25 - column 5, line 37; figures 1-9 * | [A] US2009282876 (ZURASKI ROBERT D et al.) [A] 1-15 * paragraph [0043] - paragraph [0065]; figures 1-25 * | [A] WO2017097099 (BEIJING MOBIKE TECH CO LTD et al.) [A] 1-15 * page 5, line 32 - page 18, line 35; figures 1-10 * | [A] EP1760232 (BREMICKER SOEHNE KG A et al.) [A] 1-15 * paragraph [0021] - paragraph [0035]; figures 1-5 * |