EP3413032 - AN ARRANGEMENT AND METHOD FOR MEASURING THE GAS CONTENT IN THE HEAD SPACE OF A CLOSED CONTAINER AND AN AUTOMATIC FILLING AND/OR PACKAGING PLANT USING SUCH AN ARRANGEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.09.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 09.10.2020 | ||
Former | Grant of patent is intended Status updated on 15.06.2020 | ||
Former | Examination is in progress Status updated on 02.10.2019 | ||
Former | Request for examination was made Status updated on 21.06.2019 | ||
Former | The application has been published Status updated on 09.11.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states FT System S.r.l. Via L. Da Vinci, 117 29010 Alseno (PC) / IT | [2018/52] |
Former [2018/50] | For all designated states L PRO S.r.l. Via Monte Grappa, 31 35141 Padova / IT | Inventor(s) | 01 /
TONDELLO, Giuseppe c/o L PRO S.r.l. Via Monte Grappa, N.31 35141 Padova / IT | [2018/50] | Representative(s) | Robba, Pierpaolo Interpatent S.R.L. Via Caboto, 35 10129 Torino / IT | [2018/50] | Application number, filing date | 18185342.5 | 13.01.2017 | [2018/50] | Priority number, date | IT2016UB09954 | 13.01.2016 Original published format: IT UB20169954 | [2018/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3413032 | Date: | 12.12.2018 | Language: | EN | [2018/50] | Type: | B1 Patent specification | No.: | EP3413032 | Date: | 11.11.2020 | Language: | EN | [2020/46] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.10.2018 | Classification | IPC: | G01N21/3504, G01N21/39, G01N33/14 | [2018/50] | CPC: |
G01N21/3504 (EP);
G01N21/39 (EP);
G01N33/14 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/30] |
Former [2018/50] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ANORDNUNG UND VERFAHREN ZUM MESSEN DES GASGEHALTES IM KOPFRAUM EINES GESCHLOSSENEN BEHÄLTERS UND EINE AUTOMATISCHE BEFÜLL- UND / ODER VERPACKUNGSANLAGE UNTER VERWENDUNG EINER SOLCHEN ANORDNUNG | [2018/50] | English: | AN ARRANGEMENT AND METHOD FOR MEASURING THE GAS CONTENT IN THE HEAD SPACE OF A CLOSED CONTAINER AND AN AUTOMATIC FILLING AND/OR PACKAGING PLANT USING SUCH AN ARRANGEMENT | [2018/50] | French: | AGENCEMENT ET PROCÉDÉ DE MESURE DE LA TENEUR EN GAZ DANS L'ESPACE LIBRE D'UN RÉCIPIENT FERMÉ ET INSTALLATION DE REMPLISSAGE ET / OU DE CONDITIONNEMENT AUTOMATIQUE UTILISANT UN TEL AGENCEMENT | [2018/50] | Examination procedure | 12.06.2019 | Amendment by applicant (claims and/or description) | 12.06.2019 | Examination requested [2019/30] | 12.06.2019 | Date on which the examining division has become responsible | 08.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 18.02.2020 | Reply to a communication from the examining division | 16.06.2020 | Communication of intention to grant the patent | 01.10.2020 | Fee for grant paid | 01.10.2020 | Fee for publishing/printing paid | 01.10.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP17151329.4 / EP3193159 | Opposition(s) | 12.08.2021 | No opposition filed within time limit [2021/42] | Fees paid | Renewal fee | 18.01.2019 | Renewal fee patent year 03 | 22.01.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.01.2017 | AL | 11.11.2020 | AT | 11.11.2020 | CY | 11.11.2020 | CZ | 11.11.2020 | DK | 11.11.2020 | EE | 11.11.2020 | FI | 11.11.2020 | HR | 11.11.2020 | LT | 11.11.2020 | LV | 11.11.2020 | MC | 11.11.2020 | MK | 11.11.2020 | MT | 11.11.2020 | NL | 11.11.2020 | PL | 11.11.2020 | RO | 11.11.2020 | RS | 11.11.2020 | SI | 11.11.2020 | SK | 11.11.2020 | SM | 11.11.2020 | IE | 13.01.2021 | LU | 13.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | BG | 11.02.2021 | GB | 11.02.2021 | GR | 12.02.2021 | IS | 11.03.2021 | PT | 11.03.2021 | [2024/42] |
Former [2024/23] | HU | 13.01.2017 | |
AL | 11.11.2020 | ||
AT | 11.11.2020 | ||
CY | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
MK | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 13.01.2021 | ||
LU | 13.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GB | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2023/33] | HU | 13.01.2017 | |
AL | 11.11.2020 | ||
AT | 11.11.2020 | ||
CY | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 13.01.2021 | ||
LU | 13.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GB | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2023/30] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CY | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 13.01.2021 | ||
LU | 13.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GB | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2022/34] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 13.01.2021 | ||
LU | 13.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GB | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2022/23] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 13.01.2021 | ||
LU | 13.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GB | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2022/10] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 13.01.2021 | ||
LU | 13.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GB | 11.02.2021 | ||
GR | 12.02.2021 | ||
PT | 11.03.2021 | ||
Former [2022/09] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 13.01.2021 | ||
LU | 13.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GB | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2022/07] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
IE | 13.01.2021 | ||
LU | 13.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/52] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
LU | 13.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/50] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SI | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
LU | 13.01.2021 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/46] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
NL | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
LU | 13.01.2021 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/45] | AL | 11.11.2020 | |
AT | 11.11.2020 | ||
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
LU | 13.01.2021 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/43] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
LU | 13.01.2021 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/40] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
MC | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/37] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
DK | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/36] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
EE | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/35] | AT | 11.11.2020 | |
CZ | 11.11.2020 | ||
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RO | 11.11.2020 | ||
RS | 11.11.2020 | ||
SK | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/33] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LT | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/32] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
SM | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/28] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
HR | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/25] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
LV | 11.11.2020 | ||
PL | 11.11.2020 | ||
RS | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
IS | 11.03.2021 | ||
PT | 11.03.2021 | ||
Former [2021/23] | AT | 11.11.2020 | |
FI | 11.11.2020 | ||
LV | 11.11.2020 | ||
RS | 11.11.2020 | ||
BG | 11.02.2021 | ||
GR | 12.02.2021 | ||
PT | 11.03.2021 | ||
Former [2021/22] | FI | 11.11.2020 | |
RS | 11.11.2020 | ||
PT | 11.03.2021 | ||
Former [2021/21] | FI | 11.11.2020 | |
PT | 11.03.2021 | ||
Former [2021/20] | FI | 11.11.2020 | Documents cited: | Search | [A]US3509996 (MALIK DONALD J) [A] 1-13 * figures 1-2 *; | [X]JP2002202247 (ANRITSU CORP) [X] 1-9 * figures 1-2 *; | [A]US6694157 (STONE ROBERT T [US], et al) [A] 1-13 * figures 2,8 *; | [A]US2005084974 (VEALE JAMES R [US], et al) [A] 1-13 * [0003], [0005], [0052]-[0056];; figures 1-2, 3A *; | [A]WO2008103837 (ZOLO TECHNOLOGIES INC [US], et al) [A] 1-13 * figure 4 *; | [A]EP2372344 (BONFIGLIOLI ENGINEERING S R L [IT]) [A] 1-13 * [0001]-[0002], [0006]-[0007], [0017]-[0027], [0038]-[0044];; figures 1-6 *; | [X]CN103389283B (HARBIN INST OF TECHNOLOGY) [X] 1-9 * figure 1 *; | [A]US2015329267 (HOLKA SIMON [SE], et al) [A] 1-13 * figures 2-3 *; | [T] - COCOLA L ET AL, "Validation and calibration of a TDLAS oxygen sensor for in-line measurement on flow-packed products", OPTICAL SENSING II, SPIE, 1000 20TH ST. BELLINGHAM WA 98225-6705 USA, (20160512), vol. 9855, doi:10.1117/12.2228911, ISSN 0277-786X, ISBN 978-1-62841-971-9, pages 98550F - 98550F, XP060065766 [T] * figures 2, 4 * DOI: http://dx.doi.org/10.1117/12.2228911 |