Extract from the Register of European Patents

EP About this file: EP3608644

EP3608644 - METHOD OF DETERMINING A SIGN OF A LOAD CURRENT IN A BRIDGE CIRCUIT WITH AT LEAST ONE POWER SEMICONDUCTOR CIRCUIT [Right-click to bookmark this link]
Former [2020/07]POWER SEMICONDUCTOR CIRCUIT AND METHOD FOR DETERMINATION OF A TEMPERATURE OF A POWER SEMICONDUCTOR CIRCUIT
[2020/44]
StatusNo opposition filed within time limit
Status updated on  04.02.2022
Database last updated on 28.03.2026
FormerThe patent has been granted
Status updated on  19.02.2021
FormerGrant of patent is intended
Status updated on  04.11.2020
FormerRequest for examination was made
Status updated on  19.06.2020
FormerThe application has been published
Status updated on  10.01.2020
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Infineon Technologies AG
Am Campeon 1-12
85579 Neubiberg / DE
[2020/07]
Inventor(s)01 / Arens, Andre
Oesternstr. 2a
59602 Ruethen / DE
02 / Jakobi, Waldemar
Am Langen Graben 19
59494 Soest / DE
 [2020/07]
Representative(s)Dilg, Haeusler, Schindelmann Patentanwaltsgesellschaft mbH
Leonrodstraße 58
80636 München / DE
[2020/07]
Application number, filing date18188227.509.08.2018
[2020/07]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3608644
Date:12.02.2020
Language:DE
[2020/07]
Type: B1 Patent specification 
No.:EP3608644
Date:24.03.2021
Language:DE
[2021/12]
Search report(s)(Supplementary) European search report - dispatched on:EP13.02.2019
ClassificationIPC:G01K7/01, H03K17/082, H03K17/08, H03K17/00
[2020/44]
CPC:
G01K7/01 (EP,CN,US); G01R31/2608 (CN); G01K7/20 (US);
G01K7/24 (CN); G01R19/14 (US); G01R31/2607 (CN);
G01R31/2619 (US); G01R31/2628 (US); G01R31/275 (CN);
H03K17/08128 (US); H03K17/0828 (EP,US); H10D12/411 (US);
H10D48/387 (US); H10W40/00 (US); H10W72/50 (US);
H10W90/00 (US); H03K17/08122 (US); H03K2017/0806 (EP,US);
H03K2217/0027 (EP,US); H10W72/5473 (EP); H10W72/5475 (EP);
H10W72/926 (EP); H10W90/753 (EP) (-)
Former IPC [2020/07]G01K7/01, H03K17/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/30]
Former [2020/07]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUM BESTIMMEN EINES VORZEICHENS EINES LASTSTROMS IN EINER BRÜCKENSCHALTUNG MIT MINDESTENES EINER LEISTUNGSHALBLEITERSCHALTUNG[2020/44]
English:METHOD OF DETERMINING A SIGN OF A LOAD CURRENT IN A BRIDGE CIRCUIT WITH AT LEAST ONE POWER SEMICONDUCTOR CIRCUIT[2020/44]
French:PROCÉDÉ DE DÉTERMINATION D'UN SIGNE D'UN COURANT DE CHARGE DANS UN CIRCUIT EN PONT AVEC AU MOINS UN COMMUTATEUR DE SEMI-CONDUCTEURS DE PUISSANCE[2020/44]
Former [2020/07]LEISTUNGSHALBLEITERSCHALTUNG SOWIE VERFAHREN ZUR BESTIMMUNG EINER TEMPERATUR EINES LEISTUNGSHALBLEITERBAUELEMENTS
Former [2020/07]POWER SEMICONDUCTOR CIRCUIT AND METHOD FOR DETERMINATION OF A TEMPERATURE OF A POWER SEMICONDUCTOR CIRCUIT
Former [2020/07]COMMUTATEUR DE SEMI-CONDUCTEURS DE PUISSANCE AINSI QUE PROCÉDÉ DE DÉTERMINATION DE LA TEMPÉRATURE D'UN ÉLÉMENT SEMI-CONDUCTEUR DE PUISSANCE
Examination procedure21.08.2019Amendment by applicant (claims and/or description)
17.06.2020Examination requested  [2020/30]
17.06.2020Date on which the examining division has become responsible
05.11.2020Communication of intention to grant the patent
15.02.2021Fee for grant paid
15.02.2021Fee for publishing/printing paid
15.02.2021Receipt of the translation of the claim(s)
Opposition(s)04.01.2022No opposition filed within time limit [2022/10]
Fees paidRenewal fee
14.08.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.08.2018
AL24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
MK24.03.2021
MT24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
TR24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
IE09.08.2021
LU09.08.2021
BE31.08.2021
CH31.08.2021
FR31.08.2021
LI31.08.2021
[2024/42]
Former [2024/29]HU09.08.2018
AL24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
MK24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
TR24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
IE09.08.2021
LU09.08.2021
BE31.08.2021
CH31.08.2021
FR31.08.2021
LI31.08.2021
Former [2024/23]HU09.08.2018
AL24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
MK24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
IE09.08.2021
LU09.08.2021
BE31.08.2021
CH31.08.2021
FR31.08.2021
LI31.08.2021
Former [2023/33]HU09.08.2018
AL24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
IE09.08.2021
LU09.08.2021
BE31.08.2021
CH31.08.2021
FR31.08.2021
LI31.08.2021
Former [2023/30]AL24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
IE09.08.2021
LU09.08.2021
BE31.08.2021
CH31.08.2021
FR31.08.2021
LI31.08.2021
Former [2023/10]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
IE09.08.2021
LU09.08.2021
BE31.08.2021
CH31.08.2021
FR31.08.2021
LI31.08.2021
Former [2022/35]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
IE09.08.2021
LU09.08.2021
BE31.08.2021
CH31.08.2021
FR31.08.2021
LI31.08.2021
Former [2022/34]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
LU09.08.2021
BE31.08.2021
CH31.08.2021
FR31.08.2021
LI31.08.2021
Former [2022/23]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
LU09.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/21]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
CH31.08.2021
LI31.08.2021
IS24.12.2021
Former [2022/18]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
IS24.12.2021
Former [2022/13]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
IS24.12.2021
Former [2022/10]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
IS24.12.2021
Former [2022/08]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2022/07]AL24.03.2021
CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/52]CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/51]CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/50]CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
Former [2021/48]CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RS24.03.2021
SE24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/46]FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RS24.03.2021
SE24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/43]FI24.03.2021
HR24.03.2021
LV24.03.2021
NL24.03.2021
RS24.03.2021
SE24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/38]FI24.03.2021
HR24.03.2021
LV24.03.2021
RS24.03.2021
SE24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/37]FI24.03.2021
HR24.03.2021
LV24.03.2021
RS24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/36]FI24.03.2021
HR24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/35]FI24.03.2021
HR24.03.2021
NO24.06.2021
Former [2021/33]FI24.03.2021
NO24.06.2021
Documents cited:Search[XAI] US2012175780  (BAGINSKI PATRICK et al.) [X] 1,5,8,10 * abstract * * paragraphs [0003] , [0047] - [0052] - [0073] - [0078] *[A] 15 [I] 4,11-14
 [X] GB2549934  (REINHAUSEN MASCHF SCHEUBECK et al.) [X] 1,3,8 * abstract * * pages 24,25,28 *
 [X] EP1830405  (MITSUBISHI ELECTRIC CORP et al.) [X] 1,8 * abstract * * paragraphs [0033] - [0038] *
 [X] JP2001085629  (FUJI ELECTRIC CO LTD et al.) [X] 1,2,6-9 * abstract *
 [A] US6995555  (GRAF ALFONS et al.) [A] 1,4,11,12 * abstract *
 [A] EP2444817  (FUJI ELECTRIC CO LTD et al.) [A] 1,6-9,15 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.