EP3449835 - COMPUTED TOMOGRAPHY SYSTEM AND METHOD FOR IMAGING MULTIPLE ANATOMICAL TARGETS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.11.2023 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 09.12.2022 | ||
Former | Grant of patent is intended Status updated on 10.08.2022 | ||
Former | Examination is in progress Status updated on 05.04.2020 | ||
Former | Request for examination was made Status updated on 13.09.2019 | ||
Former | The application has been published Status updated on 01.02.2019 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Hologic, Inc. 250 Campus Drive Marlborough, MA 01752 / US | [2019/35] |
Former [2019/10] | For all designated states Hologic Inc. 250 Campus Drive Marlborough, MA 01752 / US | Inventor(s) | 01 /
WILLIAMS, Cornell Lee Hologic, Inc. c/o Hologic, Inc. 250 Campus Drive Marlborough, MA 01752 / US | [2019/10] | Representative(s) | Hoyng Rokh Monegier B.V. Rembrandt Tower, 30th Floor Amstelplein 1 1096 HA Amsterdam / NL | [2023/02] |
Former [2019/10] | Hoyng Rokh Monegier LLP Rembrandt Tower, 31st Floor Amstelplein 1 1096 HA Amsterdam / NL | Application number, filing date | 18189199.5 | 15.08.2018 | [2019/10] | Priority number, date | US201762548804P | 22.08.2017 Original published format: US 201762548804 P | [2019/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3449835 | Date: | 06.03.2019 | Language: | EN | [2019/10] | Type: | B1 Patent specification | No.: | EP3449835 | Date: | 11.01.2023 | Language: | EN | [2023/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.02.2019 | Classification | IPC: | A61B6/03, A61B6/00 | [2019/10] | CPC: |
A61B6/032 (EP,US);
A61B6/4014 (US);
A61B6/4435 (EP,US);
A61B6/482 (EP,US);
A61B6/50 (EP,US);
A61B6/502 (EP,US);
A61B6/54 (EP,US);
A61B6/027 (US);
A61B6/4064 (US);
A61B6/466 (US);
A61B6/5235 (US);
G01N2223/419 (US);
G01N23/046 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/42] |
Former [2019/10] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | COMPUTERTOMOGRAFIESYSTEM UND METHODE ZUR BILDGEBUNG MEHRERER ANATOMISCHER ZIELE | [2019/10] | English: | COMPUTED TOMOGRAPHY SYSTEM AND METHOD FOR IMAGING MULTIPLE ANATOMICAL TARGETS | [2019/10] | French: | SYSTÈME ET MÉTHODE DE TOMOGRAPHIE ASSISTÉE PAR ORDINATEUR POUR IMAGER DE MULTIPLES CIBLES ANATOMIQUES | [2019/10] | Examination procedure | 05.09.2019 | Amendment by applicant (claims and/or description) | 05.09.2019 | Examination requested [2019/42] | 05.09.2019 | Date on which the examining division has become responsible | 08.04.2020 | Despatch of a communication from the examining division (Time limit: M06) | 02.10.2020 | Reply to a communication from the examining division | 11.08.2022 | Communication of intention to grant the patent | 05.12.2022 | Fee for grant paid | 05.12.2022 | Fee for publishing/printing paid | 05.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 12.10.2023 | No opposition filed within time limit [2023/51] | Fees paid | Renewal fee | 27.08.2020 | Renewal fee patent year 03 | 27.08.2021 | Renewal fee patent year 04 | 29.08.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 11.01.2023 | BG | 11.01.2023 | CZ | 11.01.2023 | DK | 11.01.2023 | EE | 11.01.2023 | ES | 11.01.2023 | FI | 11.01.2023 | HR | 11.01.2023 | IT | 11.01.2023 | LT | 11.01.2023 | LV | 11.01.2023 | MC | 11.01.2023 | NL | 11.01.2023 | PL | 11.01.2023 | RO | 11.01.2023 | RS | 11.01.2023 | SE | 11.01.2023 | SI | 11.01.2023 | SK | 11.01.2023 | SM | 11.01.2023 | NO | 11.04.2023 | GR | 12.04.2023 | IS | 11.05.2023 | PT | 11.05.2023 | IE | 15.08.2023 | LU | 15.08.2023 | BE | 31.08.2023 | CH | 31.08.2023 | [2024/51] |
Former [2024/36] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
IT | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
IE | 15.08.2023 | ||
LU | 15.08.2023 | ||
BE | 31.08.2023 | ||
CH | 31.08.2023 | ||
Former [2024/33] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
IT | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
IE | 15.08.2023 | ||
LU | 15.08.2023 | ||
CH | 31.08.2023 | ||
Former [2024/26] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
IT | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
LU | 15.08.2023 | ||
CH | 31.08.2023 | ||
Former [2024/24] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
LU | 15.08.2023 | ||
CH | 31.08.2023 | ||
Former [2024/21] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
LU | 15.08.2023 | ||
Former [2024/16] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2024/11] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/50] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/49] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/48] | AT | 11.01.2023 | |
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/46] | AT | 11.01.2023 | |
DK | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/39] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/38] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/37] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/36] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/35] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
NO | 11.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/34] | ES | 11.01.2023 | |
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
PT | 11.05.2023 | ||
Former [2023/33] | ES | 11.01.2023 | |
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
Former [2023/31] | NL | 11.01.2023 | Documents cited: | Search | [XI]DE102004051820 (SIEMENS AG [DE]) [X] 1,4,12,14,15,18,19,21 * paragraph [0045] - paragraph [0071] * [I] 2,3,5-11,13,16,17,20,22,23; | [XAI]US2010303196 (ZOU YU [US]) [X] 1,4,12,15 * paragraph [0038] - paragraph [0051]; figures 2A, 2B * [A] 5,10,11,20,22 [I] 2,3,6-9,13,14,16-19,21,23; | [A]EP2732764 (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-23* paragraph [0058] - paragraph [0261] *; | [XI]EP3143935 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-4,15-19 * paragraph [0064] - paragraph [0218] * [I] 5-14,20-23 | by applicant | US8787522 | US2014321607 | US2016256125 |