blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3453623

EP3453623 - SAFE TAKEOFF SYSTEM [Right-click to bookmark this link]
StatusGrant of patent is intended
Status updated on  11.07.2024
Database last updated on 02.11.2024
FormerExamination is in progress
Status updated on  19.02.2020
FormerRequest for examination was made
Status updated on  20.09.2019
FormerThe application has been published
Status updated on  08.02.2019
Most recent event   Tooltip23.09.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Embraer S.A.
Av. Brigadeiro Faria Lima 2170
12227-901 São José Dos Campos SP / BR
[2019/11]
Inventor(s)01 / Guedes, Patrice London
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
02 / Ferreira de Camargo Clark Reis, Jose Roberto
c/o Embraer S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José Dos Campos - SP / BR
03 / Barbosa, Nelson
c/o Marlos Silveira
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
04 / Monteiro de Souza Junior, Rubens
c/o Marlos Silveira
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
05 / Pitigliani, Miriam
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
06 / Rodrigues Lima, Grace
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
07 / Martins, Reinaldo
c/o Marlos Silveira
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
08 / Seibert, Nelson
c/o Marlos Silveira
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
 [2019/24]
Former [2019/11]01 / Guedes, Patrice London
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
02 / Ferreira de Camargo Clark Reis, Jose Roberto
c/o Embraer S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José Dos Campos - SP / BR
03 / Barbosa, Nelson
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
04 / Monteiro de Souza Junior, Rubens
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
05 / Pitigliani, Miriam
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
06 / Rodrigues Lima, Grace
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
07 / Martins, Reinaldo
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
08 / Seibert, Nelson
c/o EMBRAER S.A.
Av. Brigadeiro Faria Lima, 2.170
12227-901 Sao José dos Campos, SP / BR
Representative(s)Liesegang, Eva
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
[2019/11]
Application number, filing date18193194.007.09.2018
[2019/11]
Priority number, dateUS20171569833707.09.2017         Original published format: US201715698337
[2019/11]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3453623
Date:13.03.2019
Language:EN
[2019/11]
Search report(s)(Supplementary) European search report - dispatched on:EP14.12.2018
ClassificationIPC:B64D45/00, G01C23/00, G05D1/00
[2019/11]
CPC:
B64D45/00 (EP,US); B64D47/00 (CN); G05D1/0661 (US);
G01C23/00 (EP,US); G05D1/0083 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/43]
Former [2019/11]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SYSTEM FÜR SICHERES STARTEN[2019/11]
English:SAFE TAKEOFF SYSTEM[2019/11]
French:SYSTÈME DE DÉCOLLAGE SÉCURISÉ[2019/11]
Examination procedure12.09.2019Amendment by applicant (claims and/or description)
12.09.2019Examination requested  [2019/43]
12.09.2019Date on which the examining division has become responsible
24.02.2020Despatch of a communication from the examining division (Time limit: M04)
26.06.2020Reply to a communication from the examining division
14.12.2020Despatch of a communication from the examining division (Time limit: M04)
21.04.2021Reply to a communication from the examining division
24.01.2022Despatch of a communication from the examining division (Time limit: M04)
20.05.2022Reply to a communication from the examining division
29.03.2023Despatch of a communication from the examining division (Time limit: M04)
04.08.2023Reply to a communication from the examining division
12.07.2024Communication of intention to grant the patent
Fees paidRenewal fee
14.09.2020Renewal fee patent year 03
10.09.2021Renewal fee patent year 04
15.09.2022Renewal fee patent year 05
13.09.2023Renewal fee patent year 06
23.09.2024Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US2011040431  (GRIFFITH SCOT [US], et al);
 [A]US2011118909  (ISHIHARA YASUO [US], et al);
 [A]WO2013091057  (EMBRAER SA [BR], et al);
 [XI]US9164505  (PECK ANDREW J [US], et al);
 [XP]EP3251947  (EMBRAER SA [BR])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.