blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3431753

EP3431753 - SERRATED TRAILING EDGE PANEL FOR A WIND TURBINE BLADE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  28.02.2020
FormerGrant of patent is intended
Status updated on  22.09.2019
FormerRequest for examination was made
Status updated on  26.07.2019
FormerThe application has been published
Status updated on  21.12.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
LM WP Patent Holding A/S
Jupitervej 6
6000 Kolding / DK
[2019/04]
Inventor(s)01 / Høeg, Jesper
Skovbrynet 24, st. tv.
6000 Kolding / DK
02 / Ansholm, Kim Rasmussen
Slagelsesvej 16
6000 Kolding / DK
03 / Kildegaard, Casper
Kikkenborgvej 54 B
6000 Kolding / DK
04 / Lehmann, Kristian Madsen
Lodsvej 8, Skærbæk
7000 Fredericia / DK
 [2019/04]
Representative(s)COPA Copenhagen Patents
Rosenørns Allé 1, 2nd floor
1970 Frederiksberg C / DK
[2019/04]
Application number, filing date18193626.112.02.2016
[2019/04]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3431753
Date:23.01.2019
Language:EN
[2019/04]
Type: B1 Patent specification 
No.:EP3431753
Date:01.04.2020
Language:EN
[2020/14]
Search report(s)(Supplementary) European search report - dispatched on:EP11.12.2018
ClassificationIPC:F03D1/06
[2019/04]
CPC:
F03D1/0633 (EP,US); F03D1/0675 (EP,CN,US); F05B2240/30 (EP,US);
F05B2240/301 (EP,US); F05B2240/302 (CN); F05B2250/183 (EP,US);
F05B2250/184 (EP,US); F05B2250/70 (EP,US); F05B2250/71 (EP,US);
F05B2260/96 (EP,CN,US); F05B2280/6003 (EP,US); Y02E10/72 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/35]
Former [2019/04]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Validation statesMA11.09.2018
TitleGerman:GEZACKTE HINTERKANTENPLATTE FÜR EINE WINDTURBINENSCHAUFEL[2019/04]
English:SERRATED TRAILING EDGE PANEL FOR A WIND TURBINE BLADE[2019/04]
French:PANNEAU DE BORD DE FUITE DENTELÉ POUR UNE PALE D'ÉOLIENNE[2019/04]
Examination procedure23.07.2019Amendment by applicant (claims and/or description)
23.07.2019Examination requested  [2019/35]
23.07.2019Date on which the examining division has become responsible
23.09.2019Communication of intention to grant the patent
23.01.2020Fee for grant paid
23.01.2020Fee for publishing/printing paid
23.01.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP16155507.3  / EP3205874
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
11.09.2018Renewal fee patent year 03
20.02.2019Renewal fee patent year 04
20.02.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.02.2016
AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
EE01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
MK01.04.2020
MT01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
TR01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
[2024/42]
Former [2024/29]HU12.02.2016
AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
EE01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
MK01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
TR01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2024/23]HU12.02.2016
AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
EE01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
MK01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2023/33]HU12.02.2016
AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
EE01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2023/30]AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
EE01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/41]AL01.04.2020
AT01.04.2020
CZ01.04.2020
EE01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/24]AL01.04.2020
AT01.04.2020
CZ01.04.2020
EE01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/10]AL01.04.2020
AT01.04.2020
CZ01.04.2020
EE01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/08]AL01.04.2020
CZ01.04.2020
FI01.04.2020
HR01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
RO01.04.2020
RS01.04.2020
SM01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/04]AL01.04.2020
CZ01.04.2020
FI01.04.2020
HR01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
RS01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/51]CZ01.04.2020
FI01.04.2020
HR01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
RS01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/50]CZ01.04.2020
FI01.04.2020
HR01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
BG01.07.2020
NO01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/49]CZ01.04.2020
FI01.04.2020
LT01.04.2020
NL01.04.2020
BG01.07.2020
NO01.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/48]FI01.04.2020
LT01.04.2020
NL01.04.2020
BG01.07.2020
NO01.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/47]LT01.04.2020
BG01.07.2020
NO01.07.2020
IS01.08.2020
Former [2020/46]BG01.07.2020
IS01.08.2020
Former [2020/39]BG01.07.2020
Documents cited:Search[AD]EP1314885  (BONUS ENERGY AS [DK]);
 [A]US2011142637  (RIDDELL SCOTT GABELL [US], et al);
 [AD]US2011142635  (FRITZ PETER JAMES [US])
by applicantEP1314885
 US2011142635
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.