blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3469899

EP3469899 - AGRICULTURAL DISTRIBUTOR AND METHOD FOR CONTROLLING SUCH A DISTRIBUTOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.01.2023
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  11.02.2022
FormerGrant of patent is intended
Status updated on  24.11.2021
FormerRequest for examination was made
Status updated on  18.10.2019
FormerThe application has been published
Status updated on  15.03.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
HORSCH LEEB Application Systems GmbH
Kleegartenstraße 54
94405 Landau an der Isar / DE
[2020/30]
Former [2019/16]For all designated states
HORSCH LEEB Application Systems GmbH
Plattlinger Straße 21
94562 Oberpöring / DE
Inventor(s)01 / LEEB, Theodor
Plattlinger Straße 21
94562 Oberpöring / DE
02 / ZINK, Florian
Plattlinger Straße 21
94562 Oberpöring / DE
 [2019/16]
Representative(s)Benninger, Johannes
Benninger Patentanwaltskanzlei
Dr.-Leo-Ritter-Strasse 5
93049 Regensburg / DE
[2019/16]
Application number, filing date18195135.118.09.2018
[2019/16]
Priority number, dateDE20171012242127.09.2017         Original published format: DE102017122421
[2019/16]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3469899
Date:17.04.2019
Language:DE
[2019/16]
Type: B1 Patent specification 
No.:EP3469899
Date:16.03.2022
Language:DE
[2022/11]
Search report(s)(Supplementary) European search report - dispatched on:EP15.03.2019
ClassificationIPC:A01M7/00
[2019/16]
CPC:
A01M7/0057 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/47]
Former [2019/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LANDWIRTSCHAFTLICHE VERTEILMASCHINE UND VERFAHREN ZUR STEUERUNG EINER DERARTIGEN VERTEILMASCHINE[2019/16]
English:AGRICULTURAL DISTRIBUTOR AND METHOD FOR CONTROLLING SUCH A DISTRIBUTOR[2019/16]
French:MACHINE D'ÉPANDAGE AGRICOLE ET PROCÉDÉ DE COMMANDE D'UNE TELLE MACHINE D'ÉPANDAGE[2019/16]
Examination procedure14.10.2019Examination requested  [2019/47]
14.10.2019Date on which the examining division has become responsible
27.10.2020Amendment by applicant (claims and/or description)
25.11.2021Communication of intention to grant the patent
08.02.2022Fee for grant paid
08.02.2022Fee for publishing/printing paid
08.02.2022Receipt of the translation of the claim(s)
Opposition(s)19.12.2022No opposition filed within time limit [2023/08]
Fees paidRenewal fee
24.09.2020Renewal fee patent year 03
22.09.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.09.2018
AL16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
MT16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
TR16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
GB18.09.2022
IE18.09.2022
LU18.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
[2024/42]
Former [2024/29]HU18.09.2018
AL16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
TR16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
GB18.09.2022
IE18.09.2022
LU18.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2024/27]HU18.09.2018
AL16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
MK16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
GB18.09.2022
IE18.09.2022
LU18.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2024/21]HU18.09.2018
AL16.03.2022
CY16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
GB18.09.2022
IE18.09.2022
LU18.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2024/18]HU18.09.2018
AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
GB18.09.2022
IE18.09.2022
LU18.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/47]AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
GB18.09.2022
IE18.09.2022
LU18.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/42]AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE18.09.2022
LU18.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/35]AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
IT16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE18.09.2022
LU18.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/33]AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
IE18.09.2022
LU18.09.2022
Former [2023/30]AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
LU18.09.2022
Former [2023/22]AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
MC16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/10]AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SI16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/07]AL16.03.2022
CZ16.03.2022
DK16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2023/01]AL16.03.2022
CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2022/51]CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
IS16.07.2022
PT18.07.2022
Former [2022/50]CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
PL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/49]CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SK16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/48]CZ16.03.2022
EE16.03.2022
ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/47]ES16.03.2022
FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
RO16.03.2022
RS16.03.2022
SE16.03.2022
SM16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
PT18.07.2022
Former [2022/44]FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
NL16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
Former [2022/39]FI16.03.2022
HR16.03.2022
LT16.03.2022
LV16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
Former [2022/36]HR16.03.2022
LT16.03.2022
LV16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
GR17.06.2022
Former [2022/35]HR16.03.2022
LT16.03.2022
RS16.03.2022
SE16.03.2022
BG16.06.2022
NO16.06.2022
Former [2022/33]LT16.03.2022
NO16.06.2022
Documents cited:Search[XDAY]EP1716754  (AMAZONEN-WERKE H DREYER GMBH & CO KG [DE]) [XD] 1-8,10,11,14-21,24 * column 1, paragraphs 3,4,5,8 * * column 2, paragraphs 9,10,12,14 * * column 3, paragraph 19 - column 4, line 20 * * column 5, paragraphs 22-24 * * column 6, paragraph 26 - column 8, paragraph 31 * * figure - * [A] 9 [Y] 12,13,22,23;
 [X]US2016243575  (OTTO TODD A [US], et al) [X] 1,3-8,10,11,14,15,17-21,24 * page 1, paragraph 8 * * page 2, paragraphs 16,21,22 * * page 3, paragraphs 22,25 * * page 4, paragraphs 31,32 * * figures 2a-2c, 7-11 *;
 [YD]EP2918157  (AMAZONEN WERKE DREYER H [DE]) [YD] 12,22 * column 1, paragraphs 2,3,6 * * column 2, paragraphs 7,8,11 * * column 4, paragraphs 19,20,21 * * figure - *;
 [Y]EP2510784  (AMAZONEN WERKE DREYER H [DE]) [Y] 13,23 * column 2, paragraph 13 * * column 3, paragraph 17 - column 4, paragraph 18 * * figure 1 *;
 [A]WO2012041743  (DEERE & CO [DE], et al) [A] 1-24 * page 2, paragraph 5 - page 3, paragraph 3 * * page 4, paragraph 1 - page 5, paragraph 2 * * page 5, paragraph 7 - page 8, paragraph 2 * * figures 1-3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.