blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3505435

EP3505435 - HEAT DISSIPATION STRUCTURE OF AXLE SHAFT FOR POWER WHEEL OF ELECTRIC MOTORCYCLE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.07.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  07.08.2020
FormerGrant of patent is intended
Status updated on  24.03.2020
FormerRequest for examination was made
Status updated on  13.12.2019
FormerThe application has been published
Status updated on  31.05.2019
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): NL
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
Reduce Carbon Energy Develop Co., Ltd.
No. 55, Sec. 3
Jiayuan Road
Shulin District
New Taipei City 238 / TW
[2019/27]
Inventor(s)01 / Chen, Fu-Chieh
No. 55, Sec. 3, Jiayuan Rd.,
Shulin District
238 New Taipei City / TW
 [2019/27]
Representative(s)Brown, Michael Stanley
Alpha & Omega
Chine Croft
East Hill
Ottery St. Mary, Devon EX11 1PJ / GB
[2019/27]
Application number, filing date18197929.501.10.2018
[2019/27]
Priority number, dateTW2017014637028.12.2017         Original published format: TW 106146370
[2019/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3505435
Date:03.07.2019
Language:EN
[2019/27]
Type: B1 Patent specification 
No.:EP3505435
Date:09.09.2020
Language:EN
[2020/37]
Search report(s)(Supplementary) European search report - dispatched on:EP01.04.2019
ClassificationIPC:B62K25/28, B62K25/02, B62M23/02, B60K7/00, B62M7/12, // B62K25/00
[2019/27]
CPC:
B62K25/005 (EP); B60K7/0007 (EP); B62K25/02 (EP);
B62K25/283 (EP); B62M23/02 (EP); B62M7/12 (EP);
B60K2007/0092 (EP); B62K2204/00 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/03]
Former [2019/27]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:WÄRMEABLEITUNGSSTRUKTUR EINER ACHSWELLE FÜR EIN KRAFTRAD EINES ELEKTROMOTORRADS[2019/27]
English:HEAT DISSIPATION STRUCTURE OF AXLE SHAFT FOR POWER WHEEL OF ELECTRIC MOTORCYCLE[2019/27]
French:STRUCTURE DE DISSIPATION DE CHALEUR D'ARBRE D'ESSIEU DE ROUE MOTRICE DE MOTOCYCLETTE ÉLECTRIQUE[2019/27]
Examination procedure10.12.2019Examination requested  [2020/03]
10.12.2019Date on which the examining division has become responsible
30.12.2019Amendment by applicant (claims and/or description)
25.03.2020Communication of intention to grant the patent
22.07.2020Fee for grant paid
22.07.2020Fee for publishing/printing paid
23.07.2020Receipt of the translation of the claim(s)
Opposition(s)10.06.2021No opposition filed within time limit [2021/33]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.10.2018
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
NL23.09.2020
IE01.10.2020
LU01.10.2020
BE31.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
[2023/29]
Former [2022/33]HU01.10.2018
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
IE01.10.2020
LU01.10.2020
BE31.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2022/27]HU01.10.2018
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
IE01.10.2020
LU01.10.2020
BE31.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/46]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
IE01.10.2020
LU01.10.2020
BE31.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/37]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
LU01.10.2020
BE31.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/36]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
LU01.10.2020
BE31.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/31]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
LU01.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/28]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/25]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/23]AT09.09.2020
CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/22]CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/21]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/10]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/09]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/08]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
Former [2021/07]FI09.09.2020
LT09.09.2020
NO09.12.2020
Documents cited:Search[A]DE19732273  (ELLSAESSER DIETRICH GERHARD [DE]) [A] 1 * figures 1-3 *;
 [A]WO2010124624  (ZHEJIANG GUANXI ELECTRIC & MOT [CN], et al) [A] 1 * figures 1-6 *;
 [A]WO2011015782  (GIUDICE DANIEL [FR]) [A] 1 * figures 1-9 *;
 [A]JP4932012B  (NIDEC COPAL CORP) [A] 1* figures 1,2 *;
 [A]WO2017155673  (FUTURE MOTION INC [US]) [A] 1 * figures 1-13 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.