EP3640679 - A METHOD FOR ASSIGNING EGO VEHICLE TO A LANE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.04.2024 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 05.05.2023 | ||
Former | Grant of patent is intended Status updated on 01.01.2023 | ||
Former | Request for examination was made Status updated on 23.10.2020 | ||
Former | The application has been published Status updated on 20.03.2020 | Most recent event Tooltip | 20.06.2024 | Lapse of the patent in a contracting state New state(s): LU | published on 24.07.2024 [2024/30] | Applicant(s) | For all designated states Zenuity AB Lindholmspiren 2 417 56 Göteborg / SE | [2023/23] |
Former [2020/17] | For all designated states Zenuity AB Lindholmspiren 2 417 56 Göteborg / SE | Inventor(s) | 01 /
RUNEMALM, Viktor Eklandagatan 54 C 412 61 Göteborg / SE | 02 /
HAMMARSTEN, Markus Doktor Lindhs Gata 1, lgh 1601 413 27 Göteborg / SE | 03 /
SILVLIN, Jonatan Batterigatan 10c 415 01 Göteborg / SE | 04 /
MANHOF, Albin Oljekvarnsgatan 9A lgh 1001 414 65 Göteborg / SE | [2020/17] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [2023/23] |
Former [2020/17] | Zacco Sweden AB P.O. Box 5581 114 85 Stockholm / SE | Application number, filing date | 18200390.5 | 15.10.2018 | [2020/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3640679 | Date: | 22.04.2020 | Language: | EN | [2020/17] | Type: | B1 Patent specification | No.: | EP3640679 | Date: | 07.06.2023 | Language: | EN | [2023/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.03.2019 | Classification | IPC: | G01S19/13, G06V20/56, G08G1/137, B60W30/12, G01C21/28, G01C21/36, G08G1/16, G01C21/16 | [2022/47] | CPC: |
G01S19/13 (EP);
G05D1/0236 (CN);
G08G1/0137 (US);
B60W30/12 (EP);
G01C21/28 (EP);
G01C21/3658 (EP);
G05D1/0088 (US);
G05D1/0214 (CN);
G05D1/0221 (CN);
G05D1/0223 (CN);
G05D1/0231 (US);
G05D1/024 (CN);
G05D1/0251 (CN);
G05D1/0257 (CN);
G05D1/0278 (CN,US);
G05D1/0285 (CN);
G06V20/588 (EP);
G08G1/137 (EP);
G08G1/167 (EP,US)
(-)
|
Former IPC [2020/17] | G01S19/13, B60W30/12, G01C21/16, G01C21/28, G01C21/36, G06K9/00, G08G1/16, B60W30/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/48] |
Former [2020/17] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR ZUWEISUNG EINES EGO-FAHRZEUGS ZU EINER FAHRSPUR | [2020/17] | English: | A METHOD FOR ASSIGNING EGO VEHICLE TO A LANE | [2020/17] | French: | PROCÉDÉ D'AFFECTATION DE VÉHICULE AUTONOME À UNE VOIE DE CIRCULATION | [2020/17] | Examination procedure | 21.10.2020 | Amendment by applicant (claims and/or description) | 21.10.2020 | Examination requested [2020/48] | 21.10.2020 | Date on which the examining division has become responsible | 02.01.2023 | Communication of intention to grant the patent | 26.04.2023 | Fee for grant paid | 26.04.2023 | Fee for publishing/printing paid | 26.04.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 08.03.2024 | No opposition filed within time limit [2024/20] | Fees paid | Renewal fee | 25.09.2020 | Renewal fee patent year 03 | 21.09.2021 | Renewal fee patent year 04 | 21.09.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 07.06.2023 | CZ | 07.06.2023 | DK | 07.06.2023 | EE | 07.06.2023 | ES | 07.06.2023 | FI | 07.06.2023 | HR | 07.06.2023 | IT | 07.06.2023 | LT | 07.06.2023 | LV | 07.06.2023 | MC | 07.06.2023 | NL | 07.06.2023 | PL | 07.06.2023 | RO | 07.06.2023 | RS | 07.06.2023 | SE | 07.06.2023 | SI | 07.06.2023 | SK | 07.06.2023 | SM | 07.06.2023 | NO | 07.09.2023 | GR | 08.09.2023 | IS | 07.10.2023 | PT | 09.10.2023 | LU | 15.10.2023 | [2024/30] |
Former [2024/28] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/26] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/24] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/22] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/10] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/09] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
Former [2024/08] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/03] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/01] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/52] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/51] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/50] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/48] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
Former [2023/46] | ES | 07.06.2023 | Documents cited: | Search | [XI]US2016335507 (CHEN YUNCONG [US], et al) [X] 1,13,15,16 * figure 5 * * paragraphs [0002] - [0004] * * paragraphs [0020] , [0 23] - [26 28] * * paragraphs [0030] - [0044] * [I] 2-12,14; | [A]KR20170085752 (HYUNDAI MOTOR CO LTD [KR]) [A] 1-16 * the whole document *; | [A]WO2018015811 (MOBILEYE VISION TECHNOLOGIES LTD [IL]) [A] 1-16* the whole document * | by applicant | CN107221195 |