| EP3454585 - APPLICATION ROUTING CONFIGURATION FOR NFC CONTROLLER SUPPORTING MULTIPLE NFCEES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.07.2022 Database last updated on 28.02.2026 | |
| Former | The patent has been granted Status updated on 23.07.2021 | ||
| Former | Grant of patent is intended Status updated on 28.03.2021 | ||
| Former | Examination is in progress Status updated on 26.06.2020 | ||
| Former | Request for examination was made Status updated on 20.09.2019 | ||
| Former | The application has been published Status updated on 08.02.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, Ontario N2K 0A7 / CA | [2019/11] | Inventor(s) | 01 /
NGUYEN, Duc, Hai, Dong Uni Tech Center Universitätsstrasse 40 Extension: 42424 44799 Bochum / DE | [2019/11] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Straße 29 80336 München / DE | [N/P] |
| Former [2019/11] | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | Application number, filing date | 18200949.8 | 17.11.2010 | [2019/11] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3454585 | Date: | 13.03.2019 | Language: | EN | [2019/11] | Type: | B1 Patent specification | No.: | EP3454585 | Date: | 25.08.2021 | Language: | EN | [2021/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.02.2019 | Classification | IPC: | H04W12/088, H04W4/80, H04L29/08, // H04M1/725, H04W24/00, H04W84/10, H04W74/00 | [2021/14] | CPC: |
H04W4/80 (EP,US);
G06K7/0008 (US);
H04L67/51 (EP,US);
H04W12/088 (EP,US);
H04M1/72412 (EP,US);
H04M2250/04 (EP,US);
|
| Former IPC [2019/11] | H04W12/08, H04W4/80, H04L29/08, // H04M1/725, H04W24/00, H04W84/10, H04W74/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/43] |
| Former [2019/11] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ANWENDUNGSVERMITTLUNGSKONFIGURATION FÜR NFC-CONTROLLER ZUR UNTERSTÜTZUNG MEHRERER NFCEE | [2019/11] | English: | APPLICATION ROUTING CONFIGURATION FOR NFC CONTROLLER SUPPORTING MULTIPLE NFCEES | [2019/11] | French: | CONFIGURATION DE ROUTAGE D'APPLICATIONS POUR CONTRÔLEUR NFC PRENANT EN CHARGE PLUSIEURS NFCEES | [2019/11] | Examination procedure | 12.09.2019 | Amendment by applicant (claims and/or description) | 12.09.2019 | Examination requested [2019/43] | 12.09.2019 | Date on which the examining division has become responsible | 30.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2020 | Reply to a communication from the examining division | 29.03.2021 | Communication of intention to grant the patent | 14.07.2021 | Fee for grant paid | 14.07.2021 | Fee for publishing/printing paid | 14.07.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP10777029.9 / EP2641411 | Opposition(s) | 27.05.2022 | No opposition filed within time limit [2022/31] | Fees paid | Renewal fee | 17.10.2018 | Renewal fee patent year 03 | 17.10.2018 | Renewal fee patent year 04 | 17.10.2018 | Renewal fee patent year 05 | 17.10.2018 | Renewal fee patent year 06 | 17.10.2018 | Renewal fee patent year 07 | 17.10.2018 | Renewal fee patent year 08 | 17.10.2018 | Renewal fee patent year 09 | 27.11.2019 | Renewal fee patent year 10 | 27.11.2020 | Renewal fee patent year 11 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.11.2010 | AL | 25.08.2021 | AT | 25.08.2021 | CY | 25.08.2021 | CZ | 25.08.2021 | DK | 25.08.2021 | EE | 25.08.2021 | ES | 25.08.2021 | FI | 25.08.2021 | HR | 25.08.2021 | IT | 25.08.2021 | LT | 25.08.2021 | LV | 25.08.2021 | MC | 25.08.2021 | MK | 25.08.2021 | MT | 25.08.2021 | PL | 25.08.2021 | RO | 25.08.2021 | RS | 25.08.2021 | SE | 25.08.2021 | SI | 25.08.2021 | SK | 25.08.2021 | SM | 25.08.2021 | TR | 25.08.2021 | IE | 17.11.2021 | LU | 17.11.2021 | BG | 25.11.2021 | NO | 25.11.2021 | GR | 26.11.2021 | BE | 30.11.2021 | CH | 30.11.2021 | LI | 30.11.2021 | IS | 25.12.2021 | PT | 27.12.2021 | [2024/42] |
| Former [2024/29] | HU | 17.11.2010 | |
| AL | 25.08.2021 | ||
| AT | 25.08.2021 | ||
| CY | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| IT | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| MK | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SI | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| TR | 25.08.2021 | ||
| IE | 17.11.2021 | ||
| LU | 17.11.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2024/23] | HU | 17.11.2010 | |
| AL | 25.08.2021 | ||
| AT | 25.08.2021 | ||
| CY | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| IT | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| MK | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SI | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| IE | 17.11.2021 | ||
| LU | 17.11.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2023/33] | HU | 17.11.2010 | |
| AL | 25.08.2021 | ||
| AT | 25.08.2021 | ||
| CY | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| IT | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SI | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| IE | 17.11.2021 | ||
| LU | 17.11.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2023/24] | AL | 25.08.2021 | |
| AT | 25.08.2021 | ||
| CY | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| IT | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SI | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| IE | 17.11.2021 | ||
| LU | 17.11.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/48] | AL | 25.08.2021 | |
| AT | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| IT | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SI | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| IE | 17.11.2021 | ||
| LU | 17.11.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/37] | AL | 25.08.2021 | |
| AT | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| IT | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SI | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| LU | 17.11.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/36] | AL | 25.08.2021 | |
| AT | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| IT | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SI | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| LU | 17.11.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/34] | AL | 25.08.2021 | |
| AT | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| LU | 17.11.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/33] | AL | 25.08.2021 | |
| AT | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| MC | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| BE | 30.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/29] | AL | 25.08.2021 | |
| AT | 25.08.2021 | ||
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/25] | AT | 25.08.2021 | |
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| SM | 25.08.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/24] | AT | 25.08.2021 | |
| CZ | 25.08.2021 | ||
| DK | 25.08.2021 | ||
| EE | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RO | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| SK | 25.08.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/21] | AT | 25.08.2021 | |
| DK | 25.08.2021 | ||
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/10] | AT | 25.08.2021 | |
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| HR | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| LV | 25.08.2021 | ||
| PL | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| GR | 26.11.2021 | ||
| IS | 25.12.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/09] | AT | 25.08.2021 | |
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| RS | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| PT | 27.12.2021 | ||
| Former [2022/08] | AT | 25.08.2021 | |
| ES | 25.08.2021 | ||
| FI | 25.08.2021 | ||
| LT | 25.08.2021 | ||
| SE | 25.08.2021 | ||
| BG | 25.11.2021 | ||
| NO | 25.11.2021 | ||
| Former [2022/07] | AT | 25.08.2021 | |
| LT | 25.08.2021 | ||
| NO | 25.11.2021 | Documents cited: | Search | [X] EP2106108 (MOTOROLA INC et al.) [X] 1-15 * abstract * * paragraph [0048] - paragraph [0059] * * paragraph [0075] - paragraph [0085] * * figures 3,4 * | [I] US2010227553 (CHARRAT BRUNO et al.) [I] 1-15 * abstract * * figures 4,5,8 * * paragraph [0006] - paragraph [0037] * * paragraph [0055] - paragraph [0057] * * paragraph [0061] - paragraph [0063] * * paragraph [0070] - paragraph [0125] * * paragraph [0135] - paragraph [0144] * * claim 27 * |