blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3477009

EP3477009 - FOOT WASHING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.04.2023
Database last updated on 12.11.2024
FormerThe patent has been granted
Status updated on  13.05.2022
FormerGrant of patent is intended
Status updated on  25.01.2022
FormerRequest for examination was made
Status updated on  29.03.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
The Boeing Company
929 Long Bridge Drive
Arlington, VA 22202 / US
[2023/12]
Former [2019/18]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
Inventor(s)01 / FULLERTON, James A
c/o The Boeing Company
100 North Riverside Plaza
Chicago, IL Illinois 60606-2016 / US
02 / BROWN, Douglas Alan
c/o The Boeing Company
100 North Riverside Plaza
Chicago IL 60606-2016 / US
 [2020/46]
Former [2019/18]01 / FULLERTON, James A
c/o The Boeing Company
100 North Riverside Plaza
Chicago, IL Illinois 60606-2016 / US
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[2022/24]
Former [2019/18]Boult Wade Tennant LLP
5th Floor, Salisbury Square House
8, Salisbury Square
London EC4Y 8AP / GB
Application number, filing date18201692.322.10.2018
[2019/18]
Priority number, dateUS20171579285725.10.2017         Original published format: US201715792857
[2019/18]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3477009
Date:01.05.2019
Language:EN
[2019/18]
Type: B1 Patent specification 
No.:EP3477009
Date:15.06.2022
Language:EN
[2022/24]
Search report(s)(Supplementary) European search report - dispatched on:EP25.02.2019
ClassificationIPC:A47K3/022, A47K17/02, B64D11/02, E03C1/324
[2021/52]
CPC:
B64D11/02 (EP,US); A47K17/02 (EP,US); A47K3/022 (EP,US);
E03C1/324 (EP,US); A47K2201/02 (EP,US); Y02T50/40 (EP)
Former IPC [2019/18]E03C1/324, E03C1/328, A47K3/062, A47K4/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/18]
TitleGerman:FUSSWASCHSYSTEM[2019/18]
English:FOOT WASHING SYSTEM[2019/18]
French:SYSTÈME DE LAVAGE DE PIEDS[2019/18]
Examination proceduredeletedDate on which the examining division has become responsible
22.10.2018Examination requested  [2019/18]
25.10.2019Amendment by applicant (claims and/or description)
26.01.2022Communication of intention to grant the patent
04.05.2022Fee for grant paid
04.05.2022Fee for publishing/printing paid
04.05.2022Receipt of the translation of the claim(s)
Opposition(s)16.03.2023No opposition filed within time limit [2023/21]
Fees paidRenewal fee
27.10.2020Renewal fee patent year 03
27.10.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.10.2018
AL15.06.2022
AT15.06.2022
CY15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
IT15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
MK15.06.2022
MT15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
IE22.10.2022
LU22.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
[2024/42]
Former [2024/27]HU22.10.2018
AL15.06.2022
AT15.06.2022
CY15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
IT15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
MK15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
IE22.10.2022
LU22.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/21]HU22.10.2018
AL15.06.2022
AT15.06.2022
CY15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
IT15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
IE22.10.2022
LU22.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/18]HU22.10.2018
AL15.06.2022
AT15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
IT15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
IE22.10.2022
LU22.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/11]AL15.06.2022
AT15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
IT15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
IE22.10.2022
LU22.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/48]AL15.06.2022
AT15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
IE22.10.2022
LU22.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/42]AL15.06.2022
AT15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
LU22.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/35]AL15.06.2022
AT15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
LU22.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/30]AL15.06.2022
AT15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
LU22.10.2022
Former [2023/25]AL15.06.2022
AT15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
Former [2023/21]AL15.06.2022
AT15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
Former [2023/17]AL15.06.2022
AT15.06.2022
CZ15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
Former [2023/12]AT15.06.2022
CZ15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
Former [2023/11]AT15.06.2022
CZ15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
NL15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
PT17.10.2022
Former [2023/09]AT15.06.2022
CZ15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
NL15.06.2022
RO15.06.2022
RS15.06.2022
SE15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
PT17.10.2022
Former [2023/08]AT15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
NL15.06.2022
RS15.06.2022
SE15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
Former [2023/07]AT15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
NL15.06.2022
RS15.06.2022
SE15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
Former [2023/02]FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
NL15.06.2022
RS15.06.2022
SE15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
Former [2022/50]FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
RS15.06.2022
SE15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
Former [2022/49]FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
SE15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
Former [2022/47]FI15.06.2022
LT15.06.2022
SE15.06.2022
NO15.09.2022
Documents cited:Search[XY]US4970732  (DENG TAY C [TW]) [X] 1-3,6,8 * column 1, line 61 - column 4, line 16; figures 1-5 * [Y] 4,7;
 [XA]JPH0593443U  (YURISAKA HISHIMOTO) [X] 1-8,10-13,15 * paragraph [0021] - paragraph [0094]; figures 1,2,4,5 * [A] 9;
 [Y]CN2414713Y  (HAIER GROEP CORP [CN]) [Y] 4,7 * figure 2 *;
 [XA]US6604471  (TARVER JR SAMUEL A [US]) [X] 1-9 * column 7, line 32 - line 39; figure 2b * [A] 10-15;
 [XY]CN200987633Y  (GANG LIU [CN]) [X] 1-3,5,6,8,10-15 * page 2, paragraph 3 - page 3, paragraph 1; figures 1,3,4 * [Y] 4,7;
 [A]EP3002217  (BOEING CO [US]) [A] 1-15* paragraph [0015] - paragraph [0056]; figures 10,11 *;
 [XP]WO2018084693  (ROZILAWATI IBRAHIM [MY]) [XP] 1-3,5,6,8,10-12 * page 3, line 23 - page 4; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.