EP3477136 - AIR BEARING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 07.04.2021 | ||
Former | Examination is in progress Status updated on 21.04.2020 | ||
Former | Request for examination was made Status updated on 01.11.2019 | ||
Former | The application has been published Status updated on 29.03.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Hamilton Sundstrand Corporation Four Coliseum Centre 2730 West Tyvola Road Charlotte, NC 28217-4578 / US | [2019/18] | Inventor(s) | 01 /
RANKIN, Kevin M. 71 Pepperbush Way Windsor, CT 06095 / US | 02 /
POTEET, Steven 213 Aspen Glen Dr. Hamden CT 06518 / US | 03 /
SMITH, Blair A. 45 Sweet Meadow Drive South Windsor, CT 06074 / US | 04 /
FISKE, William R. 88 Wayne Street Springfield, MA 01118 / US | 05 /
SANTIAGO, Anthony 12 Litchfield Drive Simsbury, CO 06070 / US | [2019/18] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2021/35] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2019/18] | Dehns St. Brides House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 18201830.9 | 22.10.2018 | [2019/18] | Priority number, date | US201715791782 | 24.10.2017 Original published format: US201715791782 | [2019/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3477136 | Date: | 01.05.2019 | Language: | EN | [2019/18] | Type: | B1 Patent specification | No.: | EP3477136 | Date: | 01.09.2021 | Language: | EN | [2021/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.01.2019 | Classification | IPC: | F16C32/06, F16C17/02, F16C17/04, C23C4/10, F01D25/22 | [2019/18] | CPC: |
C23C4/10 (EP,US);
F16C32/0603 (US);
C23C30/005 (EP,US);
F01D25/22 (EP,US);
F16C17/024 (EP,US);
F16C17/042 (EP,US);
F05D2230/314 (EP,US);
F05D2240/53 (EP,US);
F05D2300/211 (EP,US);
F05D2300/224 (EP,US);
F05D2300/2263 (EP,US);
F05D2300/2281 (EP,US);
F05D2300/509 (EP,US);
F05D2300/611 (EP,US);
F16C2202/04 (EP,US);
F16C2202/20 (US);
F16C2206/82 (EP,US);
F16C2223/30 (US);
F16C2360/23 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/49] |
Former [2019/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | LUFTLAGER | [2019/18] | English: | AIR BEARING | [2019/18] | French: | PALIER À AIR | [2019/18] | Examination procedure | 30.10.2019 | Amendment by applicant (claims and/or description) | 30.10.2019 | Examination requested [2019/49] | 30.10.2019 | Date on which the examining division has become responsible | 24.04.2020 | Despatch of a communication from the examining division (Time limit: M06) | 03.11.2020 | Reply to a communication from the examining division | 08.04.2021 | Communication of intention to grant the patent | 21.07.2021 | Fee for grant paid | 21.07.2021 | Fee for publishing/printing paid | 21.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] | Fees paid | Renewal fee | 20.10.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.10.2018 | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | CZ | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | MT | 01.09.2021 | NL | 01.09.2021 | PL | 01.09.2021 | RO | 01.09.2021 | RS | 01.09.2021 | SE | 01.09.2021 | SI | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | TR | 01.09.2021 | IE | 22.10.2021 | LU | 22.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | LI | 31.10.2021 | BG | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | [2024/42] |
Former [2024/29] | HU | 22.10.2018 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
TR | 01.09.2021 | ||
IE | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2024/23] | HU | 22.10.2018 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/33] | HU | 22.10.2018 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/30] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/48] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/37] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/35] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/33] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BE | 31.10.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Documents cited: | Search | [XYI]US3518021 (LAKE JOHN E, et al) [X] 1,6-8 * the whole document * [Y] 3-5,9,11-15 [I] 2,10; | [I]US6149160 (STEPHENS LYNDON S [US], et al) [I] 1,2,7,8,10* column 5 - column 7; figure 7(b) *; | [Y]US2007099027 (KRISHNAMURTHY ANAND [IN], et al) [Y] 3-5,9,11-15 * paragraph [0027] - paragraph [0036]; figures 2-7; claims 1-17 * | Examination | US4884899 | US2003180572 | US2005175837 | US2012281936 | EP2937584 | US2017298983 |