EP3486186 - EXPANDABLE BEARING ELEMENT, DEVICE AND METHOD FOR SEALING THE BOTTOM OR COVER OF A CARDBOARD PACKAGE [Right-click to bookmark this link] | |||
Former [2019/21] | DEVICE FOR SEALING THE BOTTOM OR COVER OF AN ECOLOGICALLY DESIGNED BOX USING AN EXPANDABLE BEARING ELEMENT | ||
[2020/13] | Status | No opposition filed within time limit Status updated on 22.10.2021 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 13.11.2020 | ||
Former | Grant of patent is intended Status updated on 18.06.2020 | ||
Former | Request for examination was made Status updated on 19.07.2019 | ||
Former | The application has been published Status updated on 19.04.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Sonoco Development, Inc. 540 North Second Street Hartsville, SC 29550 / US | [2021/25] |
Former [2019/21] | For all designated states Sireix, Georges 9B, rue St.Marc 68400 Riedisheim / FR | Inventor(s) | 01 /
see applicant ... | [2019/21] | Representative(s) | Bugnion Genève Bugnion SA 10, route de Florissant Case Postale 375 1211 Genève 12 / CH | [2019/21] | Application number, filing date | 18206612.6 | 15.11.2018 | [2019/21] | Priority number, date | FR20170060930 | 20.11.2017 Original published format: FR 1760930 | [2019/21] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3486186 | Date: | 22.05.2019 | Language: | FR | [2019/21] | Type: | B1 Patent specification | No.: | EP3486186 | Date: | 16.12.2020 | Language: | FR | [2020/51] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.04.2019 | Classification | IPC: | B65D3/12, B65B7/16, B65B7/28 | [2019/21] | CPC: |
B65B7/2878 (EP,US);
B65B7/2821 (US);
B65D77/2096 (US);
B29C65/18 (EP,US);
B29C65/32 (EP,US);
B29C66/1122 (EP,US);
B29C66/24221 (EP,US);
B29C66/24223 (EP,US);
B29C66/24241 (EP,US);
B29C66/24244 (EP,US);
B29C66/24245 (EP,US);
B29C66/53461 (EP,US);
B29C66/542 (EP,US);
B29C66/612 (EP,US);
B29C66/63 (EP,US);
B29C66/71 (EP,US);
B29C66/72328 (EP,US);
B29C66/7234 (EP,US);
B29C66/72341 (EP,US);
B29C66/7392 (EP,US);
B29C66/8122 (EP,US);
B29C66/81455 (EP,US);
B29C66/8322 (EP,US);
B29C66/849 (EP,US);
B29C66/929 (EP,US);
B31B2105/0022 (EP,US);
B31D1/005 (US);
| C-Set: |
B29C66/71, B29K2023/0633 (US,EP);
B29C66/71, B29K2067/003 (EP,US);
B29C66/8122, B29K2821/00 (US,EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/34] |
Former [2019/21] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ERWEITERBARES STÜTZELEMENT, VORRICHTUNG UND VERFAHREN ZUM VERSIEGELN DES BODENS ODER DES DECKELS EINER KARTONVERPACKUNG | [2020/13] | English: | EXPANDABLE BEARING ELEMENT, DEVICE AND METHOD FOR SEALING THE BOTTOM OR COVER OF A CARDBOARD PACKAGE | [2020/13] | French: | ÉLÉMENT D'APPUI EXTENSIBLE, DISPOSITIF ET PROCÉDÉ DE SCELLAGE DE FOND OU DE COUVERCLE D'UN EMBALLAGE EN CARTON | [2020/13] |
Former [2019/21] | VORRICHTUNG ZUM VERSIEGELN DES BODENS ODER DES DECKELS EINER ÖKOLOGISCH KONZIPIERTEN KARTONVERPACKUNG, DIE EIN ERWEITERBARES STÜTZELEMENT VERWENDET | ||
Former [2019/21] | DEVICE FOR SEALING THE BOTTOM OR COVER OF AN ECOLOGICALLY DESIGNED BOX USING AN EXPANDABLE BEARING ELEMENT | ||
Former [2019/21] | DISPOSITIF DE SCELLAGE DE FOND OU DE COUVERCLE D'UN EMBALLAGE EN CARTON ÉCOLOGIQUEMENT CONÇU UTILISANT UN ÉLÉMENT D'APPUI EXTENSIBLE | Examination procedure | 11.07.2019 | Amendment by applicant (claims and/or description) | 11.07.2019 | Examination requested [2019/34] | 11.07.2019 | Date on which the examining division has become responsible | 19.06.2020 | Communication of intention to grant the patent | 22.10.2020 | Fee for grant paid | 22.10.2020 | Fee for publishing/printing paid | 22.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 17.09.2021 | No opposition filed within time limit [2021/47] | Fees paid | Renewal fee | 10.11.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.11.2018 | AL | 16.12.2020 | AT | 16.12.2020 | CY | 16.12.2020 | DK | 16.12.2020 | EE | 16.12.2020 | FI | 16.12.2020 | HR | 16.12.2020 | LT | 16.12.2020 | LV | 16.12.2020 | MC | 16.12.2020 | MK | 16.12.2020 | MT | 16.12.2020 | RO | 16.12.2020 | RS | 16.12.2020 | SE | 16.12.2020 | SI | 16.12.2020 | SK | 16.12.2020 | SM | 16.12.2020 | TR | 16.12.2020 | BG | 16.03.2021 | NO | 16.03.2021 | GR | 17.03.2021 | IS | 16.04.2021 | PT | 16.04.2021 | [2024/42] |
Former [2024/29] | HU | 15.11.2018 | |
AL | 16.12.2020 | ||
AT | 16.12.2020 | ||
CY | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
MK | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
TR | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2024/23] | HU | 15.11.2018 | |
AL | 16.12.2020 | ||
AT | 16.12.2020 | ||
CY | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
MK | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2023/33] | HU | 15.11.2018 | |
AL | 16.12.2020 | ||
AT | 16.12.2020 | ||
CY | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2023/30] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CY | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2022/33] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2022/23] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2022/13] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2022/10] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/49] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/45] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/42] | AT | 16.12.2020 | |
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/37] | AT | 16.12.2020 | |
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/36] | EE | 16.12.2020 | |
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/35] | FI | 16.12.2020 | |
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/33] | FI | 16.12.2020 | |
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/32] | FI | 16.12.2020 | |
HR | 16.12.2020 | ||
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
Former [2021/28] | FI | 16.12.2020 | |
HR | 16.12.2020 | ||
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
Former [2021/24] | FI | 16.12.2020 | |
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
Former [2021/23] | FI | 16.12.2020 | |
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
Former [2021/22] | FI | 16.12.2020 | |
RS | 16.12.2020 | ||
NO | 16.03.2021 | ||
Former [2021/20] | FI | 16.12.2020 | Documents cited: | Search | [A]FR2302915 (ZIRISTOR AB [SE]) [A] 1-15 * Figures; page 2, ligne 11page 4, ligne 14 *; | [IA]US5339595 (ROUSE DANIEL H [US], et al) [I] 1-9 * Figures; colonne 4, lignes 31-65 * [A] 10-15; | [A]EP0668151 (SIREIX GEORGES [FR]) [A] 1-15 * Figures *; | [A]EP2623306 (SIREIX GEORGES [FR]) [A] 1-15 * Figures 3a-3d *; | [A]EP2738105 (SIREIX GUILLAUME [FR]) [A] 1-15* Figures * |