EP3493503 - NETWORK PROTECTION DEVICE AND NETWORK PROTECTION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.06.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 22.07.2022 | ||
Former | Grant of patent is intended Status updated on 22.05.2022 | ||
Former | Examination is in progress Status updated on 12.04.2022 | ||
Former | Grant of patent is intended Status updated on 03.03.2022 | ||
Former | Examination is in progress Status updated on 12.11.2020 | ||
Former | Request for examination was made Status updated on 09.08.2019 | ||
Former | The application has been published Status updated on 03.05.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Panasonic Intellectual Property Corporation of America 20000 Mariner Avenue, Suite 200 Torrance, CA 90503 / US | [2019/23] | Inventor(s) | 01 /
OCHI, Naoki c/o Panasonic Intellectual Property Management Co., Ltd. 1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | 02 /
HIRAMOTO, Takuji c/o Panasonic Intellectual Property Management Co., Ltd. 1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | 03 /
ODA, Tomohiro c/o Panasonic Intellectual Property Management Co., Ltd. 1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | 04 /
OBA, Tatsumi c/o Panasonic Intellectual Property Management Co., Ltd. 1-61, Shiromi 2-chome, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | [2019/23] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2019/23] | Application number, filing date | 18208423.6 | 27.11.2018 | [2019/23] | Priority number, date | JP20170230201 | 30.11.2017 Original published format: JP 2017230201 | JP20180107964 | 05.06.2018 Original published format: JP 2018107964 | JP20180188227 | 03.10.2018 Original published format: JP 2018188227 | [2019/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3493503 | Date: | 05.06.2019 | Language: | EN | [2019/23] | Type: | B1 Patent specification | No.: | EP3493503 | Date: | 24.08.2022 | Language: | EN | [2022/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.01.2019 | Classification | IPC: | H04L9/40 | [2022/11] | CPC: |
H04L63/1408 (EP,US);
H04L63/1416 (US);
H04L41/142 (US);
H04L43/04 (US);
H04L43/062 (US);
H04L45/74 (US);
H04L63/0245 (US);
H04L63/0272 (US);
H04L63/145 (US);
H04L63/18 (EP,US)
(-)
|
Former IPC [2019/23] | H04L29/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/37] |
Former [2019/23] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | NETZWERKSCHUTZVORRICHTUNG UND NETZWERKSCHUTZSYSTEM | [2019/23] | English: | NETWORK PROTECTION DEVICE AND NETWORK PROTECTION SYSTEM | [2019/23] | French: | DISPOSITIF ET SYSTÈME DE PROTECTION DE RÉSEAU | [2019/23] | Examination procedure | 02.08.2019 | Amendment by applicant (claims and/or description) | 02.08.2019 | Examination requested [2019/37] | 02.08.2019 | Date on which the examining division has become responsible | 11.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 02.03.2021 | Reply to a communication from the examining division | 04.03.2022 | Communication of intention to grant the patent | 12.04.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 23.05.2022 | Communication of intention to grant the patent | 15.07.2022 | Fee for grant paid | 15.07.2022 | Fee for publishing/printing paid | 15.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 25.05.2023 | No opposition filed within time limit [2023/31] | Fees paid | Renewal fee | 20.11.2020 | Renewal fee patent year 03 | 24.11.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.11.2018 | AL | 24.08.2022 | AT | 24.08.2022 | BG | 24.08.2022 | CY | 24.08.2022 | CZ | 24.08.2022 | DK | 24.08.2022 | EE | 24.08.2022 | ES | 24.08.2022 | FI | 24.08.2022 | HR | 24.08.2022 | IT | 24.08.2022 | LT | 24.08.2022 | LV | 24.08.2022 | MC | 24.08.2022 | MK | 24.08.2022 | MT | 24.08.2022 | NL | 24.08.2022 | PL | 24.08.2022 | RO | 24.08.2022 | RS | 24.08.2022 | SE | 24.08.2022 | SI | 24.08.2022 | SK | 24.08.2022 | SM | 24.08.2022 | NO | 24.11.2022 | GR | 25.11.2022 | GB | 27.11.2022 | IE | 27.11.2022 | LU | 27.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | FR | 30.11.2022 | LI | 30.11.2022 | IS | 24.12.2022 | PT | 26.12.2022 | [2024/42] |
Former [2024/34] | HU | 27.11.2018 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
BG | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
MK | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/27] | HU | 27.11.2018 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
MK | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/26] | HU | 27.11.2018 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/21] | HU | 27.11.2018 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/18] | HU | 27.11.2018 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/52] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/49] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/48] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/47] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
GB | 27.11.2022 | ||
LU | 27.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/37] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
LU | 27.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/35] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/31] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/29] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/23] | AT | 24.08.2022 | |
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/22] | AT | 24.08.2022 | |
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/21] | DK | 24.08.2022 | |
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/20] | FI | 24.08.2022 | |
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/12] | FI | 24.08.2022 | |
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/11] | FI | 24.08.2022 | |
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/10] | FI | 24.08.2022 | |
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/09] | FI | 24.08.2022 | |
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/08] | FI | 24.08.2022 | |
LT | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | Documents cited: | Search | [XI]EP1628455 (MICROSOFT CORP [US]) [X] 1,11 * paragraph [0010] * * paragraph [0026] * * paragraphs [0029] - [0032] * * figure 6 * [I] 1-11; | [XI]US2006095961 (GOVINDARAJAN PRIYA [US], et al) [X] 1,11 * paragraph [0048] * * claims 1,4 * * figures 5,6 * [I] 1-11; | [XI]US8255996 (ELROD CRAIG T [US], et al) [X] 1,11 * abstract * * figure 2; claim 1 * * column 6, paragraph last * [I] 1-11; | [XI]CN106789865 (SHENZHEN AETHER ELECTRONIC INFORMATION CO LTD) [X] 1,11 * claim 1 * * figures 1,2,4,7,8 *[I] 1-11 | by applicant | JPS6364255B | JP4082613B | - WANG, KE; SALVATORE J. STOLFO, "Anomalous payload based network intrusion detection", RAID, (20040000), vol. 4 |