Extract from the Register of European Patents

EP About this file: EP3501854

EP3501854 - MOTORCYCLE TYRE FOR TRAVELING ON ROUGH TERRAIN [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.04.2021
Database last updated on 28.03.2026
FormerThe patent has been granted
Status updated on  24.04.2020
FormerGrant of patent is intended
Status updated on  11.03.2020
FormerRequest for examination was made
Status updated on  01.11.2019
FormerThe application has been published
Status updated on  27.05.2019
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE, MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
SUMITOMO RUBBER INDUSTRIES, LTD.
6-9, Wakinohama-cho 3-chome
Chuo-ku
Kobe-shi
Hyogo-ken 651-0072 / JP
[2019/26]
Inventor(s)01 / SUEISHI, Makoto
c/o Sumitomo Rubber Industries, Ltd.
6-9, Wakinohama-cho 3-chome
Chuo-ku
Kobe-shi, Hyogo 651-0072 / JP
 [2019/26]
Representative(s)Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB
Martin-Greif-Straße 1
80336 München / DE
[N/P]
Former [2019/26]Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB
Martin-Greif-Strasse 1
80336 München / DE
Application number, filing date18208902.928.11.2018
[2019/26]
Priority number, dateJP2017024295319.12.2017         Original published format: JP 2017242953
[2019/26]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3501854
Date:26.06.2019
Language:EN
[2019/26]
Type: B1 Patent specification 
No.:EP3501854
Date:27.05.2020
Language:EN
[2020/22]
Search report(s)(Supplementary) European search report - dispatched on:EP21.05.2019
ClassificationIPC:B60C11/11, B60C11/13, // B60C11/12
[2020/10]
CPC:
B60C11/11 (EP,CN,US); B60C11/01 (US); B60C11/0306 (US);
B60C11/0332 (US); B60C11/1204 (US); B60C11/1272 (CN);
B60C11/1281 (EP,US); B60C11/1376 (EP,US); B60C2011/0334 (US);
B60C2011/1227 (EP,US); B60C2011/1286 (EP,CN,US); B60C2200/10 (EP,US);
B60C2200/14 (EP,US) (-)
Former IPC [2019/26]B60C11/11, // B60C11/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/49]
Former [2019/26]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:MOTORRADREIFEN ZUM FAHREN AUF UNEBENEM GELÄNDE[2019/26]
English:MOTORCYCLE TYRE FOR TRAVELING ON ROUGH TERRAIN[2019/26]
French:PNEUMATIQUE DE MOTOCYCLETTE POUR CONDUITE SUR TERRAIN ACCIDENTÉ[2019/26]
Examination procedure29.10.2019Amendment by applicant (claims and/or description)
29.10.2019Examination requested  [2019/49]
29.10.2019Date on which the examining division has become responsible
12.03.2020Communication of intention to grant the patent
16.04.2020Fee for grant paid
16.04.2020Fee for publishing/printing paid
16.04.2020Receipt of the translation of the claim(s)
Opposition(s)02.03.2021No opposition filed within time limit [2021/18]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.11.2018
AL27.05.2020
AT27.05.2020
CY27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
MK27.05.2020
MT27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
TR27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
IE28.11.2020
LU28.11.2020
BE30.11.2020
[2022/33]
Former [2022/27]HU28.11.2018
AL27.05.2020
AT27.05.2020
CY27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
MT27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
TR27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
IE28.11.2020
LU28.11.2020
Former [2021/46]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
IE28.11.2020
LU28.11.2020
Former [2021/33]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
LU28.11.2020
Former [2021/31]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/24]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/10]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/09]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/08]AL27.05.2020
DK27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/04]AL27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RS27.05.2020
SE27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/01]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
RS27.05.2020
SE27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/51]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
RS27.05.2020
SE27.05.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/50]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
SE27.05.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/48]FI27.05.2020
LT27.05.2020
SE27.05.2020
NO27.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/47]LT27.05.2020
NO27.08.2020
IS27.09.2020
Former [2020/46]IS27.09.2020
Documents cited:Search[XA] WO2016089501  (BRIDGESTONE AMERICAS TIRE et al.)
 [XA] EP3323641  (SUMITOMO RUBBER IND et al.) [X] 1-3 * paragraph [0068]; figure 3A *[A] 4,9
 [AP] EP2251213  (BRIDGESTONE CORP et al.) [AP] 1-10 * abstract *
by applicantJP2012030615
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.