blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3501763

EP3501763 - CUTTING DEVICE, IN PARTICULAR FOR CUTTING WEBS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.05.2023
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  27.05.2022
FormerGrant of patent is intended
Status updated on  22.02.2022
FormerExamination is in progress
Status updated on  19.11.2020
FormerRequest for examination was made
Status updated on  18.10.2019
FormerThe application has been published
Status updated on  27.05.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
RI-Flex Abrasives S.R.L.
Via Vittorio Bachelet 1
41057 Spilamberto, (Modena) / IT
[2019/26]
Inventor(s)01 / TADDIA, Sergio
RI-FLEX ABRASIVES S.R.L.
Via Isonzo 11
40060 Savigno (Bologna) / IT
02 / TUNIOLI, Roberto
RI-FLEX ABRASIVES S.R.L.
Via Santo Stefano 103
40125 Bologna / IT
 [2019/26]
Representative(s)Casadei, Giovanni
Bugnion S.p.A.
Via Vellani Marchi, 20
41124 Modena / IT
[2019/26]
Application number, filing date18210333.305.12.2018
[2019/26]
Priority number, dateIT2017014753520.12.2017         Original published format: IT201700147535
[2019/26]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3501763
Date:26.06.2019
Language:EN
[2019/26]
Type: B1 Patent specification 
No.:EP3501763
Date:29.06.2022
Language:EN
[2022/26]
Search report(s)(Supplementary) European search report - dispatched on:EP17.04.2019
ClassificationIPC:B26D1/08, B26D7/00
[2019/26]
CPC:
B26D7/22 (EP,US); B26D1/085 (EP,US); B26D5/086 (EP,US);
B26D5/12 (EP,US); B26D5/16 (EP,US); B26D7/0006 (EP,US);
B26D7/18 (EP,US); B26D7/1854 (EP,US); B26D2001/0066 (EP,US);
B26D2210/11 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/47]
Former [2019/26]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SCHNEIDVORRICHTUNG, INSBESONDERE ZUM SCHNEIDEN VON BAHNEN[2019/26]
English:CUTTING DEVICE, IN PARTICULAR FOR CUTTING WEBS[2019/26]
French:DISPOSITIF DE COUPE, NOTAMMENT POUR DÉCOUPER DES BANDES[2019/26]
Examination procedure16.10.2019Amendment by applicant (claims and/or description)
16.10.2019Examination requested  [2019/47]
16.10.2019Date on which the examining division has become responsible
18.11.2020Despatch of a communication from the examining division (Time limit: M04)
10.02.2021Reply to a communication from the examining division
23.02.2022Communication of intention to grant the patent
18.05.2022Fee for grant paid
18.05.2022Fee for publishing/printing paid
18.05.2022Receipt of the translation of the claim(s)
Opposition(s)30.03.2023No opposition filed within time limit [2023/23]
Fees paidRenewal fee
16.12.2020Renewal fee patent year 03
28.12.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.12.2018
AL29.06.2022
AT29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
MK29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE05.12.2022
LU05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
[2024/29]
Former [2024/27]HU05.12.2018
AL29.06.2022
AT29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MK29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE05.12.2022
LU05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/21]HU05.12.2018
AL29.06.2022
AT29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE05.12.2022
LU05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/18]HU05.12.2018
AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE05.12.2022
LU05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/49]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE05.12.2022
LU05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/48]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
IE05.12.2022
LU05.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/47]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
LU05.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/38]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
LU05.12.2022
Former [2023/22]AL29.06.2022
AT29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/21]AL29.06.2022
AT29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/17]AL29.06.2022
AT29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/12]AT29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/09]AT29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
PT31.10.2022
Former [2023/08]AT29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2023/07]AT29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/50]FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/49]FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/47]FI29.06.2022
LT29.06.2022
SE29.06.2022
NO29.09.2022
Documents cited:Search[Y]US3574041  (MELLE HANS-GEORG WILHELM) [Y] 1-9 * column 1, line 13 - line 18 * * column 1, line 64 - line 71 * * column 2, line 10 - line 34 * * figures 1-3 *;
 [XI]US3939743  (COOMBES WILLIAM S) [X] 1-3,7,9 * column 1, line 47 - line 67 * * column 3, line 19 - line 55 * * column 4, line 24 - line 30 * * column 5, line 15 - line 39 * * figures 2, 4 * [I] 4-6,8;
 [Y]EP1344615  (DIENES WERKE [DE]) [Y] 1-9 * paragraphs [0004] , [0 22] , [0 23] * * figures 1-4 *;
 [A]CN105364983B  (SUZHOU DONGYI NC CO LTD) [A] 1-9* abstract *
ExaminationUS5131304
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.