blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3499254

EP3499254 - MONITORING OF A FAULT IN ELECTRICAL EQUIPMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.06.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  03.07.2020
FormerGrant of patent is intended
Status updated on  29.04.2020
FormerRequest for examination was made
Status updated on  22.11.2019
FormerThe application has been published
Status updated on  17.05.2019
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE, MK
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Thales
TOUR CARPE DIEM
Place des Corolles
Esplanade Nord
92400 Courbevoie / FR
[2019/25]
Inventor(s)01 / ABDESSELAM, Francis
Boîte Postale 53
THALES AVIONICS ELECTRICAL SYSTEMS SAS -
41 boulevard de la République
78401 CHATOU / FR
02 / DEVAUTOUR, Joël
Boîte Postale 53
THALES AVIONICS ELECTRICAL SYSTEMS SAS -
41 boulevard de la République
78401 CHATOU / FR
 [2019/25]
Representative(s)Atout PI Laplace
Immeuble Up On
25 Boulevard Romain Rolland
CS 40072
75685 Paris Cedex 14 / FR
[N/P]
Former [2019/25]Collet, Alain, et al
Marks & Clerk France
Conseils en Propriété Industrielle
Immeuble Visium
22, Avenue Aristide Briand
94117 Arcueil Cedex / FR
Application number, filing date18212424.813.12.2018
[2019/25]
Priority number, dateFR2017000130714.12.2017         Original published format: FR 1701307
[2019/25]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3499254
Date:19.06.2019
Language:FR
[2019/25]
Type: B1 Patent specification 
No.:EP3499254
Date:05.08.2020
Language:FR
[2020/32]
Search report(s)(Supplementary) European search report - dispatched on:EP28.03.2019
ClassificationIPC:G01K3/00, G01R31/14, G01K7/00, G01K7/16
[2020/20]
CPC:
G01K3/005 (EP,US); G01K7/183 (US); G01F1/692 (US);
G01K7/00 (EP,US); G01K7/16 (EP,US); G01K7/22 (CN);
G01R31/1272 (CN); G01R31/14 (EP,US); G01R31/50 (CN);
H01C17/075 (US); H01C3/12 (US); H01C7/006 (US);
H05B2203/003 (US) (-)
Former IPC [2019/25]G01R31/14, G01K7/00, H01H85/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/52]
Former [2019/25]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ÜBERWACHUNG EINER STÖRUNG IN EINER ELEKTRISCHEN AUSRÜSTUNG[2019/25]
English:MONITORING OF A FAULT IN ELECTRICAL EQUIPMENT[2019/25]
French:SURVEILLANCE D'UN DÉFAUT DANS UN EQUIPEMENT ÉLECTRIQUE[2020/20]
Former [2019/25]SURVEILLANCE D'UN DEFAUT DANS UN EQUIPEMENT ELECTRIQUE
Examination procedure20.11.2019Examination requested  [2019/52]
20.11.2019Date on which the examining division has become responsible
30.04.2020Communication of intention to grant the patent
29.06.2020Fee for grant paid
29.06.2020Fee for publishing/printing paid
29.06.2020Receipt of the translation of the claim(s)
Opposition(s)07.05.2021No opposition filed within time limit [2021/28]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.12.2018
AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
MT05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
TR05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE13.12.2020
LU13.12.2020
BE31.12.2020
[2022/33]
Former [2022/27]HU13.12.2018
AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MT05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
TR05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE13.12.2020
LU13.12.2020
Former [2021/46]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE13.12.2020
LU13.12.2020
Former [2021/40]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/36]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/28]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/25]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/22]AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/21]AT05.08.2020
DK05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/12]AT05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/10]AT05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/09]AT05.08.2020
ES05.08.2020
FI05.08.2020
LT05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
PT07.12.2020
Former [2021/08]ES05.08.2020
FI05.08.2020
LT05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
PT07.12.2020
Former [2021/07]FI05.08.2020
LT05.08.2020
NO05.11.2020
Documents cited:Search[A]US2004056321  (PARSONS JAMES D [US]) [A] 1-13 * paragraph [0094]; figure 1 *;
 [A]US2007215973  (RAHMAN AQUILUR [US], et al) [A] 1-13* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.