EP3486591 - FLUIDIZED BED EVAPORATION DRIER [Right-click to bookmark this link] | Status | Opposition rejected Status updated on 01.03.2024 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 15.05.2020 | ||
Former | Grant of patent is intended Status updated on 21.01.2020 | ||
Former | Request for examination was made Status updated on 21.06.2019 | ||
Former | The application has been published Status updated on 19.04.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states BMA Braunschweigische Maschinenbauanstalt AG Am Alten Bahnhof 5 38122 Braunschweig / DE | [2019/21] | Inventor(s) | 01 /
CASPERS, Gerald Im Unterdorf 31 38527 Meine / DE | 02 /
HAFEMANN, Hartmut Blumenhof 22 31275 Lehrte / DE | 03 /
BONATH, Carsten Brunnenstraße 8 29392 Wesendorf / DE | 04 /
FERSTERRA, Holger Schiebeweg 29 38116 Braunschweig / DE | [2019/22] |
Former [2019/21] | 01 /
CASPERS, Gerald Im Unterdorf 31 38527 Meine / DE | ||
02 /
HAFEMANN, Hartmut Blumenhof 22 31275 Lehrte / DE | |||
03 /
BONATH, Carsten Helmstedterstraße 58a 38126 Braunschweig / DE | |||
04 /
FERSTERRA, Holger Schiebeweg 29 38116 Braunschweig / DE | Representative(s) | Meissner Bolte Partnerschaft mbB Berliner Straße 1 07545 Gera / DE | [N/P] |
Former [2019/21] | Kruspig, Volkmar Meissner Bolte Patentanwälte Rechtsanwälte Partnerschaft mbB Berliner Straße 1 07545 Gera / DE | Application number, filing date | 18214410.5 | 09.03.2015 | [2019/21] | Priority number, date | DE201410106122 | 30.04.2014 Original published format: DE102014106122 | [2019/21] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3486591 | Date: | 22.05.2019 | Language: | DE | [2019/21] | Type: | B1 Patent specification | No.: | EP3486591 | Date: | 17.06.2020 | Language: | DE | [2020/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.04.2019 | Classification | IPC: | F26B17/10, F26B25/00 | [2019/21] | CPC: |
F26B17/107 (EP,US);
F26B17/10 (EP,RU,US);
F26B17/103 (EP,US);
F26B25/007 (EP,US);
F26B25/02 (RU)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/30] |
Former [2019/21] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | WIRBELSCHICHTVERDAMPFUNGSTROCKNER | [2019/21] | English: | FLUIDIZED BED EVAPORATION DRIER | [2019/21] | French: | DISPOSITIF DE SÉCHAGE PAR VAPORISATION DU LIT FLUIDISÉ | [2019/21] | Examination procedure | 12.06.2019 | Amendment by applicant (claims and/or description) | 12.06.2019 | Examination requested [2019/30] | 12.06.2019 | Date on which the examining division has become responsible | 29.01.2020 | Communication of intention to grant the patent | 07.05.2020 | Fee for grant paid | 07.05.2020 | Fee for publishing/printing paid | 07.05.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP15710008.2 / EP3137832 | Opposition(s) | Opponent(s) | 01
17.03.2021
24.03.2021
ADMISSIBLE EnerDry A/S Kongevejen 157 2830 Virum / DK Opponent's representative Budde Schou A/S Dronningens Tvaergade 30 1302 Copenhagen K / DK | [2021/17] | 31.03.2021 | Invitation to proprietor to file observations on the notice of opposition | 10.08.2021 | Reply of patent proprietor to notice(s) of opposition | 09.11.2023 | Cancellation of oral proceeding that was planned for 15.12.2023 | 24.11.2023 | Date of despatch of rejection of opposition | 04.12.2023 | Legal effect of rejection of opposition [2024/14] | 15.12.2023 | Date of oral proceedings | Fees paid | Renewal fee | 20.12.2018 | Renewal fee patent year 03 | 20.12.2018 | Renewal fee patent year 04 | 09.01.2019 | Renewal fee patent year 05 | 23.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.03.2015 | AL | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | EE | 17.06.2020 | ES | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | IT | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | MT | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | BG | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | AT | 09.03.2021 | GB | 09.03.2021 | IE | 09.03.2021 | LU | 09.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | FR | 31.03.2021 | LI | 31.03.2021 | DE | 01.10.2021 | [2024/42] |
Former [2024/23] | HU | 09.03.2015 | |
AL | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MK | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
AT | 09.03.2021 | ||
GB | 09.03.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
DE | 01.10.2021 | ||
Former [2023/33] | HU | 09.03.2015 | |
AL | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
AT | 09.03.2021 | ||
GB | 09.03.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
DE | 01.10.2021 | ||
Former [2023/30] | AL | 17.06.2020 | |
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
AT | 09.03.2021 | ||
GB | 09.03.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
DE | 01.10.2021 | ||
Former [2022/36] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
AT | 09.03.2021 | ||
GB | 09.03.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
DE | 01.10.2021 | ||
Former [2022/33] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
GB | 09.03.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
DE | 01.10.2021 | ||
Former [2022/11] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
GB | 09.03.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
DE | 01.10.2021 | ||
Former [2022/08] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
GB | 09.03.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
FR | 31.03.2021 | ||
DE | 01.10.2021 | ||
Former [2022/07] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 09.03.2021 | ||
DE | 01.10.2021 | ||
Former [2021/45] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/24] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/10] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/09] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/04] | AL | 17.06.2020 | |
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2021/01] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/51] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/50] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/48] | FI | 17.06.2020 | |
LT | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
Former [2020/47] | LT | 17.06.2020 | |
NO | 17.09.2020 | Documents cited: | Search | [A]EP0153704 (DANSKE SUKKERFAB [DK]); | [XI]US5357686 (JENSEN ARNE S [DK]); | [XI]EP1070223 (ASJ HOLDING APS [DK]) | Opposition | DE102014106122 | EP3009776 |