EP3501316 - METHOD FOR MANUFACTURING A SHOE UPPER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.04.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 13.05.2022 | ||
Former | Grant of patent is intended Status updated on 23.02.2022 | ||
Former | Examination is in progress Status updated on 06.04.2020 | ||
Former | Request for examination was made Status updated on 27.05.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states adidas AG Adi-Dassler-Strasse 1 91074 Herzogenaurach / DE | [2019/26] | Inventor(s) | 01 /
HOYING, Brian c/o adidas AG Adi-Dassler-Strasse 1 91074 Herzogenaurach / DE | 02 /
LESLIE, Andrew c/o adidas AG Adi-Dassler-Strasse 1 91074 Herzogenaurach / DE | [2019/26] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2022/24] |
Former [2019/26] | Wegner, Hans Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 18215005.2 | 21.12.2018 | [2019/26] | Priority number, date | DE201710223737 | 22.12.2017 Original published format: DE102017223737 | [2019/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3501316 | Date: | 26.06.2019 | Language: | EN | [2019/26] | Type: | B1 Patent specification | No.: | EP3501316 | Date: | 15.06.2022 | Language: | EN | [2022/24] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.04.2019 | Classification | IPC: | A43B1/04, A43B23/02, A43B23/04, D04B1/18, D04B1/10 | [2022/11] | CPC: |
A43B23/0245 (EP,CN,US);
A43B23/00 (CN);
A43B23/0205 (US);
A43B23/0265 (EP,US);
A43B23/027 (US);
A43B23/0275 (US);
A43B23/042 (EP,US);
A43D11/00 (CN);
A43D21/00 (US);
A43D8/003 (CN);
D04B1/108 (EP);
D04B1/18 (EP);
|
Former IPC [2019/26] | A43B1/04, A43B23/02, A43B23/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/26] | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES SCHUHOBERTEILS | [2019/26] | English: | METHOD FOR MANUFACTURING A SHOE UPPER | [2019/26] | French: | PROCÉDÉ DE FABRICATION D'UNE TIGE DE CHAUSSURE | [2019/26] | Examination procedure | 21.12.2018 | Examination requested [2019/26] | 16.12.2019 | Amendment by applicant (claims and/or description) | 09.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 11.08.2020 | Reply to a communication from the examining division | 25.09.2020 | Despatch of a communication from the examining division (Time limit: M04) | 27.01.2021 | Reply to a communication from the examining division | 17.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 15.09.2021 | Reply to a communication from the examining division | 24.02.2022 | Communication of intention to grant the patent | 09.05.2022 | Fee for grant paid | 09.05.2022 | Fee for publishing/printing paid | 09.05.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22178967.0 / EP4079181 | Opposition(s) | 16.03.2023 | No opposition filed within time limit [2023/21] | Fees paid | Renewal fee | 17.12.2020 | Renewal fee patent year 03 | 16.12.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2018 | AL | 15.06.2022 | AT | 15.06.2022 | CY | 15.06.2022 | CZ | 15.06.2022 | DK | 15.06.2022 | EE | 15.06.2022 | ES | 15.06.2022 | FI | 15.06.2022 | HR | 15.06.2022 | IT | 15.06.2022 | LT | 15.06.2022 | LV | 15.06.2022 | MC | 15.06.2022 | MK | 15.06.2022 | MT | 15.06.2022 | NL | 15.06.2022 | PL | 15.06.2022 | RO | 15.06.2022 | RS | 15.06.2022 | SE | 15.06.2022 | SI | 15.06.2022 | SK | 15.06.2022 | SM | 15.06.2022 | BG | 15.09.2022 | NO | 15.09.2022 | GR | 16.09.2022 | IS | 15.10.2022 | PT | 17.10.2022 | IE | 21.12.2022 | LU | 21.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/42] |
Former [2024/29] | HU | 21.12.2018 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
MK | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 21.12.2022 | ||
LU | 21.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/27] | HU | 21.12.2018 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MK | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 21.12.2022 | ||
LU | 21.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 21.12.2018 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 21.12.2022 | ||
LU | 21.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 21.12.2018 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 21.12.2022 | ||
LU | 21.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/11] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 21.12.2022 | ||
LU | 21.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 21.12.2022 | ||
LU | 21.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 21.12.2022 | ||
LU | 21.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
LU | 21.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
LU | 21.12.2022 | ||
Former [2023/25] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/21] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/17] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/12] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/11] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/09] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/08] | AT | 15.06.2022 | |
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2023/07] | AT | 15.06.2022 | |
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2023/02] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/50] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/49] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/47] | FI | 15.06.2022 | |
LT | 15.06.2022 | ||
SE | 15.06.2022 | ||
NO | 15.09.2022 | Documents cited: | Search | [XA]US2147197 (GLIDDEN ALFRED A); | [XDA]US4134955 (HANRAHAN JR JAMES R, et al); | [XA]US4317292 (MELTON FLORENCE); | [XA]US2008110048 (DUA BHUPESH [US], et al); | [XD]US2015342285 (HUFFMAN JULIE A [US], et al); | [XA]CN106037119 (XINTAI (FUJIAN) TECH CO LTD) |