| EP3503523 - CAMERA WITH DUAL ROTATIONAL JOINT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 20.03.2026 | |
| Former | The patent has been granted Status updated on 03.04.2021 | ||
| Former | Grant of patent is intended Status updated on 15.11.2020 | ||
| Former | Request for examination was made Status updated on 27.12.2019 | ||
| Former | The application has been published Status updated on 27.05.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Fluke Corporation 6920 Seaway Boulevard Everett, WA 98203 / US | [2019/26] | Inventor(s) | 01 /
SHELL, Dennis Fluke Corporation 7243 40th Street West Webster, Minnesota 55088 / US | 02 /
MARZETTE JR., Charles Fluke Corporation 13903 94th Avenue NE Kirkland, Washington 98034 / US | [2019/26] | Representative(s) | HGF HGF Limited 4th Floor, 1 City Square Leeds LS1 2ES / GB | [N/P] |
| Former [2021/18] | HGF 1 City Walk Leeds LS11 9DX / GB | ||
| Former [2019/26] | HGF Limited Fountain Precinct Balm Green Sheffield S1 2JA / GB | Application number, filing date | 18215203.3 | 21.12.2018 | [2019/26] | Priority number, date | US201715851181 | 21.12.2017 Original published format: US201715851181 | [2019/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3503523 | Date: | 26.06.2019 | Language: | EN | [2019/26] | Type: | B1 Patent specification | No.: | EP3503523 | Date: | 05.05.2021 | Language: | EN | [2021/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.05.2019 | Classification | IPC: | H04N5/225, H04N5/247, H04N5/33 | [2019/26] | CPC: |
H04N23/90 (EP,US);
G03B17/561 (CN);
F16C11/10 (US);
G05G5/065 (US);
H04N23/23 (EP,CN,US);
H04N23/50 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/05] |
| Former [2019/26] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KAMERA MIT DOPPELDREHGELENK | [2019/26] | English: | CAMERA WITH DUAL ROTATIONAL JOINT | [2019/26] | French: | CAMÉRA À DOUBLE JOINT ROTATIF | [2019/26] | Examination procedure | 23.12.2019 | Amendment by applicant (claims and/or description) | 23.12.2019 | Examination requested [2020/05] | 23.12.2019 | Date on which the examining division has become responsible | 16.11.2020 | Communication of intention to grant the patent | 26.03.2021 | Fee for grant paid | 26.03.2021 | Fee for publishing/printing paid | 26.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] | Fees paid | Renewal fee | 28.12.2020 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2018 | AL | 05.05.2021 | AT | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | ES | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | IT | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | MT | 05.05.2021 | NL | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | TR | 05.05.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | IE | 21.12.2021 | LU | 21.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2026/04] |
| Former [2024/42] | HU | 21.12.2018 | |
| AL | 05.05.2021 | ||
| AT | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| MK | 05.05.2021 | ||
| MT | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 21.12.2021 | ||
| LU | 21.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| Former [2024/23] | HU | 21.12.2018 | |
| AL | 05.05.2021 | ||
| AT | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| MK | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 21.12.2021 | ||
| LU | 21.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| Former [2023/33] | HU | 21.12.2018 | |
| AL | 05.05.2021 | ||
| AT | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 21.12.2021 | ||
| LU | 21.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| Former [2023/30] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 21.12.2021 | ||
| LU | 21.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| Former [2023/03] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 21.12.2021 | ||
| LU | 21.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| Former [2023/01] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 21.12.2021 | ||
| LU | 21.12.2021 | ||
| BE | 31.12.2021 | ||
| Former [2022/48] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 21.12.2021 | ||
| LU | 21.12.2021 | ||
| Former [2022/46] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| LU | 21.12.2021 | ||
| Former [2022/36] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/33] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/29] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/26] | AL | 05.05.2021 | |
| AT | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/23] | AT | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/10] | AT | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| PT | 06.09.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/09] | AT | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/08] | AT | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/07] | AT | 05.05.2021 | |
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/04] | AT | 05.05.2021 | |
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/52] | AT | 05.05.2021 | |
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/51] | AT | 05.05.2021 | |
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/50] | AT | 05.05.2021 | |
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/49] | AT | 05.05.2021 | |
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| Former [2021/46] | AT | 05.05.2021 | |
| FI | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| BG | 05.08.2021 | Documents cited: | Search | [XA] US2007036540 (NAMA DINO R et al.) | [XA] EP0682447 (MATSUSHITA ELECTRIC INDUSTRIAL CO LTD et al.) | [XA] EP2426910 (GUANGZHOU SAT INFRARED TECHNOLOGY CO LTD et al.) [X] 1-6,14,15 * paragraphs [0019] , [0024] - [0026] - [0032]; figures 1A,4D,5,6,10 *[A] 7-13 | by applicant | US201313963802 | US201514837757 |