blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3514556

EP3514556 - METHOD AND SYSTEM FOR MAGNETIC BURST TESTING OF ELECTRIC MOTORS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.07.2021
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  14.08.2020
FormerGrant of patent is intended
Status updated on  31.03.2020
FormerRequest for examination was made
Status updated on  31.01.2020
FormerThe application has been published
Status updated on  21.06.2019
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): NL
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
Avo Mutli-Amp Corporation dba Megger
4271 Bronze Way
Dallas, TX 75237-1088 / US
[2019/30]
Inventor(s)01 / Powers, Craig
c/o Megger
4812 McMurry Avenue
Fort Collins, CO Colorado 80525 / US
 [2019/30]
Representative(s)EIP
Fairfax House
15 Fulwood Place
London WC1V 6HU / GB
[N/P]
Former [2019/30]EIP
EIP Europe LLP
Fairfax House
15 Fulwood Place
London WC1V 6HU / GB
Application number, filing date18215713.121.12.2018
[2019/30]
Priority number, dateUS20171584977521.12.2017         Original published format: US201715849775
US20171584985421.12.2017         Original published format: US201715849854
[2019/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3514556
Date:24.07.2019
Language:EN
[2019/30]
Type: B1 Patent specification 
No.:EP3514556
Date:16.09.2020
Language:EN
[2020/38]
Search report(s)(Supplementary) European search report - dispatched on:EP25.06.2019
ClassificationIPC:G01R31/34
[2020/14]
CPC:
G01R31/34 (EP); G01R31/346 (EP)
Former IPC [2019/30]G01R31/34, H02P23/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/10]
Former [2019/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND SYSTEM ZUR MAGNETISCHEN BERSTPRÜFUNG VON ELEKTROMOTOREN[2019/30]
English:METHOD AND SYSTEM FOR MAGNETIC BURST TESTING OF ELECTRIC MOTORS[2019/30]
French:PROCÉDÉ ET SYSTÈME DE TEST DE RAFALE MAGNÉTIQUE DE MOTEURS ÉLECTRIQUES[2019/30]
Examination procedure21.01.2020Amendment by applicant (claims and/or description)
24.01.2020Examination requested  [2020/10]
24.01.2020Date on which the examining division has become responsible
01.04.2020Communication of intention to grant the patent
06.08.2020Fee for grant paid
06.08.2020Fee for publishing/printing paid
06.08.2020Receipt of the translation of the claim(s)
Opposition(s)17.06.2021No opposition filed within time limit [2021/34]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.12.2018
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
NL23.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE21.12.2020
LU21.12.2020
BE31.12.2020
IS16.01.2021
PT18.01.2021
[2023/29]
Former [2022/33]HU21.12.2018
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE21.12.2020
LU21.12.2020
BE31.12.2020
IS16.01.2021
PT18.01.2021
Former [2022/27]HU21.12.2018
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE21.12.2020
LU21.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/48]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE21.12.2020
LU21.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/46]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE21.12.2020
LU21.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/40]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/37]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/36]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/28]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/25]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/22]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/21]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/20]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/10]FI16.09.2020
HR16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/09]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/08]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
Former [2021/07]FI16.09.2020
NO16.12.2020
Documents cited:Search[A]US6385057  (BARRON STUART [US]) [A] 1-12 * figures 1-3 ** column 3, line 30 - column 6, line 22 *;
 [A]EP3247036  (NXP USA INC [US]) [A] 1-12 * paragraph [0003] * * paragraph [0008] - paragraph [0024] * * figures 1-5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.