EP3505821 - LED FILAMENT LAMP USING INFRARED RADIATION HEAT DISSIPATION AND LED LIGHTING BAR THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.03.2024 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 31.03.2023 | ||
Former | Grant of patent is intended Status updated on 11.12.2022 | ||
Former | Request for examination was made Status updated on 03.01.2020 | ||
Former | The application has been published Status updated on 31.05.2019 | Most recent event Tooltip | 25.10.2024 | Lapse of the patent in a contracting state New state(s): CH | published on 27.11.2024 [2024/48] | Applicant(s) | For all designated states Shenzhen Fenggong Culture Communication Co., Ltd. Room 1203, Building 4, Meinian Square Xinggong Road Shekou, Nanshan District 518000 Shenzhen City Guangdong Province / CN | [2019/27] | Inventor(s) | 01 /
HE, Siding SHENZHEN FENGGONG CULTURE COMMUNICATION CO.,LTD. Room 1203, Building 4, Meinian Square, Xinggong Road, Shekou, Nanshan District Shenzhen City, Guangdong Province 518000 / CN | [2019/27] | Representative(s) | Cabinet Chaillot 16/20, avenue de l'Agent Sarre B.P. 74 92703 Colombes Cedex / FR | [2019/27] | Application number, filing date | 18248104.4 | 27.12.2018 | [2019/27] | Priority number, date | CN201711476093 | 29.12.2017 Original published format: CN201711476093 | [2019/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3505821 | Date: | 03.07.2019 | Language: | EN | [2019/27] | Type: | B1 Patent specification | No.: | EP3505821 | Date: | 03.05.2023 | Language: | EN | [2023/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.03.2019 | Classification | IPC: | F21V23/00, F21V29/508 | [2019/27] | CPC: |
F21V23/003 (EP,US);
F21K9/232 (CN,US);
F21V29/503 (US);
F21K9/237 (CN);
F21K9/238 (CN,US);
F21K9/64 (CN,US);
F21K9/66 (US);
F21V23/002 (US);
F21V29/507 (CN);
F21V29/508 (EP,US);
F21V7/22 (CN,US);
F21V19/0015 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/27] | Title | German: | LED-FADENLAMPE MIT INFRAROTSTRAHLUNGSWÄRMEABFUHR UND LED-BELEUCHTUNGSSTAB DAFÜR | [2019/27] | English: | LED FILAMENT LAMP USING INFRARED RADIATION HEAT DISSIPATION AND LED LIGHTING BAR THEREOF | [2019/27] | French: | LAMPE À FILAMENT À DEL UTILISANT UNE DISSIPATION DE CHALEUR PAR RADIATION INFRAROUGE ET BARRE D'ÉCLAIRAGE À DEL ASSOCIÉE | [2019/27] | Examination procedure | 30.12.2019 | Amendment by applicant (claims and/or description) | 30.12.2019 | Examination requested [2020/06] | 30.12.2019 | Date on which the examining division has become responsible | 12.12.2022 | Communication of intention to grant the patent | 21.03.2023 | Fee for grant paid | 21.03.2023 | Fee for publishing/printing paid | 21.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 06.02.2024 | No opposition filed within time limit [2024/15] | Fees paid | Renewal fee | 31.12.2020 | Renewal fee patent year 03 | 31.12.2021 | Renewal fee patent year 04 | 27.12.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 03.05.2023 | CZ | 03.05.2023 | DK | 03.05.2023 | EE | 03.05.2023 | ES | 03.05.2023 | FI | 03.05.2023 | HR | 03.05.2023 | IT | 03.05.2023 | LT | 03.05.2023 | LV | 03.05.2023 | MC | 03.05.2023 | NL | 03.05.2023 | PL | 03.05.2023 | RO | 03.05.2023 | RS | 03.05.2023 | SE | 03.05.2023 | SI | 03.05.2023 | SK | 03.05.2023 | SM | 03.05.2023 | NO | 03.08.2023 | GR | 04.08.2023 | IS | 03.09.2023 | PT | 04.09.2023 | IE | 27.12.2023 | LU | 27.12.2023 | BE | 31.12.2023 | CH | 31.12.2023 | [2024/48] |
Former [2024/47] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
IT | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
IE | 27.12.2023 | ||
LU | 27.12.2023 | ||
BE | 31.12.2023 | ||
Former [2024/46] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
IT | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
IE | 27.12.2023 | ||
LU | 27.12.2023 | ||
Former [2024/40] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
IT | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
LU | 27.12.2023 | ||
Former [2024/26] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
IT | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/24] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/10] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/08] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/03] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/01] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/51] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/50] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/48] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
PT | 04.09.2023 | ||
Former [2023/46] | ES | 03.05.2023 | |
PT | 04.09.2023 | Documents cited: | Search | [IA]CN202281062U (ZHEJIANG LEDISON OPTOELECTRONICS CO LTD) [I] 1 * figures 1-3 * [A] 7,17; | [IA]CN204647932U (ZHONGSHAN DINGRED PHOTOELECTRIC CO LTD) [I] 1,5,6 * figures 2,3 * [A] 7,17; | [IA]CN106090663 (SHANDONG PROSPEROUS STAR OPTOELECTRONICS CO LTD) [I] 1-4,9-12,14,16 * figures 1-4 * [A] 7,17; | [I]CN106190124 (ZHANG BOWEN) [I] 1* figures 1,2 * | by applicant | WO2012031533 |