EP3508583 - METHOD FOR OBTAINING INTEGRATED BIOREFINERIES OF LIGNOCELLULOSE BIOMASSES BY REUSING PRODUCTION UNITS OF FORMER OIL REFINERIES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.07.2023 Database last updated on 03.04.2025 | |
Former | The patent has been granted Status updated on 29.07.2022 | ||
Former | Grant of patent is intended Status updated on 20.03.2022 | ||
Former | Examination is in progress Status updated on 12.03.2021 | ||
Former | Request for examination was made Status updated on 13.12.2019 | ||
Former | The application has been published Status updated on 07.06.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Water & Soil Remediation S.r.l. Via Donatori di Sangue, 13 46010 Curtatone, Frazione Levata MN / IT | [2019/35] |
Former [2019/28] | For all designated states Water And Soil Remediation S.r.l. Via Donatori di Sangue, 13 46010 Curtatone, Frazione Levata MN / IT | Inventor(s) | 01 /
PRANDI, Alberto Str. Capilupia, 2 46100 Mantova / IT | [2019/28] | Representative(s) | Modiano, Micaela Nadia, et al Modiano & Partners Via Meravigli, 16 20123 Milano / IT | [2019/28] | Application number, filing date | 18248212.5 | 28.12.2018 | [2019/28] | Priority number, date | IT20180000312 | 03.01.2018 Original published format: IT201800000312 | [2019/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3508583 | Date: | 10.07.2019 | Language: | EN | [2019/28] | Type: | B1 Patent specification | No.: | EP3508583 | Date: | 31.08.2022 | Language: | EN | [2022/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.05.2019 | Classification | IPC: | C12P5/00, C12M1/00, C12M1/107, C10G1/00, C10G45/02, C10G45/58, C10L1/02, C10L1/04 | [2022/11] | CPC: |
C12P5/00 (EP);
C10G45/02 (EP);
C10G45/58 (EP);
C10L1/02 (EP);
C10L1/04 (EP);
C12M1/00 (EP);
C12M21/04 (EP);
C12M29/00 (EP);
C12M43/00 (EP);
C10G2300/4056 (EP)
(-)
|
Former IPC [2019/28] | C12P5/00, C12M1/00, C10G1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/03] |
Former [2019/28] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG INTEGRIERTER BIORAFFINERIEN VON LIGNOCELLULOSEBIOMASSE DURCH WIEDERVERWENDUNG VON PRODUKTIONSEINHEITEN EHEMALIGER ÖLRAFFINERIEN | [2019/28] | English: | METHOD FOR OBTAINING INTEGRATED BIOREFINERIES OF LIGNOCELLULOSE BIOMASSES BY REUSING PRODUCTION UNITS OF FORMER OIL REFINERIES | [2019/28] | French: | PROCÉDÉ D'OBTENTION DE BIORAFFINERIES INTÉGRÉES DE BIOMASSES DE LIGNOCELLULOSE EN RÉUTILISANT DES UNITÉS DE PRODUCTION D'ANCIENNES RAFFINERIES DE PÉTROLE | [2019/28] | Examination procedure | 10.12.2019 | Amendment by applicant (claims and/or description) | 10.12.2019 | Examination requested [2020/03] | 10.12.2019 | Date on which the examining division has become responsible | 15.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 05.07.2021 | Reply to a communication from the examining division | 09.08.2021 | Despatch of a communication from the examining division (Time limit: M04) | 16.11.2021 | Reply to a communication from the examining division | 21.03.2022 | Communication of intention to grant the patent | 20.07.2022 | Fee for grant paid | 20.07.2022 | Fee for publishing/printing paid | 20.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 01.06.2023 | No opposition filed within time limit [2023/32] | Fees paid | Renewal fee | 24.11.2020 | Renewal fee patent year 03 | 10.11.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.12.2018 | AL | 31.08.2022 | AT | 31.08.2022 | BG | 31.08.2022 | CY | 31.08.2022 | CZ | 31.08.2022 | DK | 31.08.2022 | EE | 31.08.2022 | ES | 31.08.2022 | FI | 31.08.2022 | HR | 31.08.2022 | LT | 31.08.2022 | LV | 31.08.2022 | MC | 31.08.2022 | MK | 31.08.2022 | MT | 31.08.2022 | NL | 31.08.2022 | PL | 31.08.2022 | RO | 31.08.2022 | RS | 31.08.2022 | SE | 31.08.2022 | SI | 31.08.2022 | SK | 31.08.2022 | SM | 31.08.2022 | NO | 30.11.2022 | GR | 01.12.2022 | GB | 28.12.2022 | IE | 28.12.2022 | LU | 28.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | IS | 31.12.2022 | LI | 31.12.2022 | PT | 02.01.2023 | [2024/42] |
Former [2024/34] | HU | 28.12.2018 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
BG | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
MC | 31.08.2022 | ||
MK | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 28.12.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/29] | HU | 28.12.2018 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
MC | 31.08.2022 | ||
MK | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 28.12.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/27] | HU | 28.12.2018 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
MK | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 28.12.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/21] | HU | 28.12.2018 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 28.12.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/18] | HU | 28.12.2018 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 28.12.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/49] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 28.12.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/48] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 28.12.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/47] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 28.12.2022 | ||
LU | 28.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/38] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
LU | 28.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/37] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/30] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/29] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/23] | AT | 31.08.2022 | |
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/22] | AT | 31.08.2022 | |
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/21] | DK | 31.08.2022 | |
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/20] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/12] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/11] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
Former [2023/10] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
Former [2023/09] | FI | 31.08.2022 | |
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
Former [2023/08] | FI | 31.08.2022 | |
LT | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | Documents cited: | Search | [X]WO2010144684 (EXXONMOBIL RES & ENG CO [US], et al) [X] 1-6 * paragraphs [0001] , [0025] *; | [X]WO2014033762 (ENI SPA [IT], et al) [X] 1-6 * page 1, paragraphs 10-21; figure 1; claim - *; | [X] - eni Green Refinery Indd, "Green Refinery: reinventing petroleum refineries", (20140523), URL: https://www.eni.com/docs/en_IT/enicom/publications-archive/company/operations-strategies/refining-marketing/eni_Green-Refinery_esecutivo.pdf, (20180406), XP055465315 [X] 1-6 * the whole document * | [X] - JUAN ANTONIO MELERO ET AL, "Biomass as renewable feedstock in standard refinery units. Feasibility, opportunities and challenges", ENERGY & ENVIRONMENTAL SCIENCE, (2012), vol. 5, no. 6, doi:10.1039/c2ee21231e, ISSN 1754-5692, page 7393, XP055046864 [X] 1-6 * page 7399, paragraph 3 - page 7416, paragraph 4 * DOI: http://dx.doi.org/10.1039/c2ee21231e | [X] - MAHMOUD A ET AL, "Systematic methodology for optimal enterprise network design between bio-refinery and petroleum refinery for the production of transportation fuels", ENERGY, (2013), vol. 59, doi:10.1016/J.ENERGY.2013.06.026, ISSN 0360-5442, pages 224 - 232, XP028708853 [X] 1-6 * the whole document * DOI: http://dx.doi.org/10.1016/j.energy.2013.06.026 | Examination | - Marcus Vinicius de Oliveira Magalhães, "Integrating Refining to Petrochemical", Marcus Vinicius de Oliveira Magalhães, Rita Maria de Brito Alves, Claudio Augusto Oller do Nascimento and EvaristoChalbaud Biscaia Jr., 10th International Symposium on Process Systems Engineering - PSE2009, Elsevier, (2009), pages 107 - 112 |