EP3404450 - DEVICE AND METHOD FOR MULTI-SHOT WAVEFIELD RECONSTRUCTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.04.2023 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 13.05.2022 | ||
Former | Grant of patent is intended Status updated on 03.02.2022 | ||
Former | Examination is in progress Status updated on 07.07.2020 | ||
Former | Request for examination was made Status updated on 21.12.2018 | ||
Former | The application has been published Status updated on 19.10.2018 | Most recent event Tooltip | 09.02.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 13.03.2024 [2024/11] | Applicant(s) | For all designated states CGG Services SAS 27 Avenue Carnot 91300 Massy / FR | [2018/47] | Inventor(s) | 01 /
POOLE, Gordon C/O CGG Services SAS 27, Avenue Carnot 91300 MASSY / FR | [2018/47] | Representative(s) | Ipsilon Le Centralis 63, avenue du Général Leclerc 92340 Bourg-la-Reine / FR | [2022/24] |
Former [2018/47] | Petit, Maxime Ipsilon Le Centralis 63, avenue du Général Leclerc 92340 Bourg-la-Reine / FR | Application number, filing date | 18305512.8 | 25.04.2018 | [2018/47] | Priority number, date | US201715597577 | 17.05.2017 Original published format: US201715597577 | [2018/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3404450 | Date: | 21.11.2018 | Language: | EN | [2018/47] | Type: | B1 Patent specification | No.: | EP3404450 | Date: | 15.06.2022 | Language: | EN | [2022/24] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.10.2018 | Classification | IPC: | G01V1/28, G01V1/36 | [2018/47] | CPC: |
G01V1/36 (EP,US);
G01V1/362 (BR);
G01V1/28 (EP,US);
G01V1/282 (US);
G01V1/32 (US);
G01V1/38 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/04] |
Former [2018/47] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR MULTI-SHOT-WELLENFELD-REKONSTRUKTION | [2022/08] | English: | DEVICE AND METHOD FOR MULTI-SHOT WAVEFIELD RECONSTRUCTION | [2018/47] | French: | DISPOSITIF ET PROCÉDÉ DE RECONSTRUCTION D'UN CHAMP D'ONDES MULTITIRS | [2018/47] |
Former [2018/47] | VORRICHTUNG UND VERFAHREN ZUR MEHRFACHSCHUSS-WELLENFELD-REKONSTRUKTION | Examination procedure | 18.12.2018 | Amendment by applicant (claims and/or description) | 18.12.2018 | Examination requested [2019/04] | 18.12.2018 | Date on which the examining division has become responsible | 10.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 29.10.2020 | Reply to a communication from the examining division | 04.02.2022 | Communication of intention to grant the patent | 09.05.2022 | Fee for grant paid | 09.05.2022 | Fee for publishing/printing paid | 09.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 16.03.2023 | No opposition filed within time limit [2023/21] | Fees paid | Renewal fee | 12.03.2020 | Renewal fee patent year 03 | 29.04.2021 | Renewal fee patent year 04 | 25.04.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 15.06.2022 | AT | 15.06.2022 | CZ | 15.06.2022 | DK | 15.06.2022 | EE | 15.06.2022 | ES | 15.06.2022 | FI | 15.06.2022 | HR | 15.06.2022 | IT | 15.06.2022 | LT | 15.06.2022 | LV | 15.06.2022 | MC | 15.06.2022 | NL | 15.06.2022 | PL | 15.06.2022 | RO | 15.06.2022 | RS | 15.06.2022 | SE | 15.06.2022 | SI | 15.06.2022 | SK | 15.06.2022 | SM | 15.06.2022 | BG | 15.09.2022 | NO | 15.09.2022 | GR | 16.09.2022 | IS | 15.10.2022 | PT | 17.10.2022 | [2024/11] |
Former [2024/08] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/25] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/21] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
DK | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/17] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/12] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/11] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/09] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/08] | AT | 15.06.2022 | |
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2023/07] | AT | 15.06.2022 | |
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2023/02] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
NL | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/50] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/49] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/47] | FI | 15.06.2022 | |
LT | 15.06.2022 | ||
SE | 15.06.2022 | ||
NO | 15.09.2022 | Documents cited: | Search | [Y]GB2256048 (GECO AS [NO]) [Y] 2,11,14 * abstract * * figures 1, 9 *; | [IY]US2010329077 (OZBEK ALI [GB], et al) [I] 1,3,8-10,12,13,15 * abstract * * claims 1, 12 * * figure 5 * * paragraph [0014] - paragraph [0015] * * paragraph [0031] * [Y] 2,4-7,11,14; | [Y]US2016187513 (POOLE GORDON [GB], et al) [Y] 4-7 * claims 1-3 ** paragraph [0059] - paragraph [0062] * | by applicant | US4486865 | US7715988 | US2013163376 | US2013163379 | US8775091 | US2015212222 | WO2015159149 | WO2016023598 | WO2016038458 | US9322943 | WO2016075550 | US9435905 | - VASSALLO, M.; OZBEK, A.; OZDEMIR, K.; EGGENBERGER, K, "Crossline wavefield reconstruction from multicomponent streamer data: Part 1 - Multichannel interpolation by matching pursuit (MIMAP) using pressure and its crossline gradient", Geophysics, (20100000), vol. 75, doi:doi:10.1190/1.3496958, pages WB53 - WB67, XP001561932 DOI: http://dx.doi.org/10.1190/1.3496958 | - OZBEK, A.; VASSALLO, M.; OZDEMIR, K.; MANEN, D-J.; EGGENBERGER, K, "Crossline wavefield reconstruction from multi-component streamer data: Part 2 - Joint interpolation and 3D up/down separation by generalized matching pursuit", Geophysics, (20100000), vol. 75, pages WB69 - WB85 | - ROBERTSSON, J.; MOORE, I.; VASSALLO, M.; OZDEMIR, A.K.; VAN MANEN, D-J; OZBEK, A, "On the use of multicomponent streamer recordings for reconstruction of pressure wavefileds in the crossline direction", Geophysics, (20080000), vol. 73, doi:doi:10.1190/1.2953338, pages A45 - A49, XP001516126 DOI: http://dx.doi.org/10.1190/1.2953338 |