EP3565750 - ARRANGEMENT AND METHOD FOR SWITCHING OFF A TRACTION VOLTAGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 06.05.2020 | ||
Former | Request for examination was made Status updated on 11.10.2019 | ||
Former | The international publication has been made Status updated on 11.09.2018 | ||
Former | unknown Status updated on 23.02.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Siemens Mobility GmbH Otto-Hahn-Ring 6 81739 München / DE | [2019/46] | Inventor(s) | 01 /
KOHLRUSS, Jacob Johannes Schiebeweg 35 38116 Braunschweig / DE | [2019/46] | Application number, filing date | 18704435.9 | 23.01.2018 | [2019/46] | WO2018EP51558 | Priority number, date | DE201710203186 | 28.02.2017 Original published format: DE102017203186 | [2019/46] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018158006 | Date: | 07.09.2018 | Language: | DE | [2018/36] | Type: | A1 Application with search report | No.: | EP3565750 | Date: | 13.11.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 07.09.2018 takes the place of the publication of the European patent application. | [2019/46] | Type: | B1 Patent specification | No.: | EP3565750 | Date: | 30.09.2020 | Language: | DE | [2020/40] | Search report(s) | International search report - published on: | EP | 07.09.2018 | Classification | IPC: | B60M1/30, B61L15/00, B60M3/04 | [2020/21] | CPC: |
B61L15/0027 (EP);
B60M3/04 (EP);
B60M1/30 (EP)
|
Former IPC [2019/46] | B61L15/00, B60M3/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ANORDNUNG UND VERFAHREN ZUM ABSCHALTEN EINER TRAKTIONSSPANNUNG | [2019/46] | English: | ARRANGEMENT AND METHOD FOR SWITCHING OFF A TRACTION VOLTAGE | [2019/46] | French: | DISPOSITIF ET PROCÉDÉ DE COUPURE D'UNE TENSION DE TRACTION | [2019/46] | Entry into regional phase | 07.08.2019 | National basic fee paid | 07.08.2019 | Designation fee(s) paid | 07.08.2019 | Examination fee paid | Examination procedure | 07.08.2019 | Examination requested [2019/46] | 07.08.2019 | Date on which the examining division has become responsible | 07.05.2020 | Communication of intention to grant the patent | 21.08.2020 | Receipt of the translation of the claim(s) | 24.08.2020 | Fee for grant paid | 24.08.2020 | Fee for publishing/printing paid | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 20.01.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.01.2018 | AL | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | EE | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | IT | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | MT | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | TR | 30.09.2020 | BG | 30.12.2020 | GR | 31.12.2020 | IE | 23.01.2021 | LU | 23.01.2021 | IS | 30.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | PT | 01.02.2021 | [2024/42] |
Former [2024/29] | HU | 23.01.2018 | |
AL | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
TR | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 23.01.2021 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2024/23] | HU | 23.01.2018 | |
AL | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 23.01.2021 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/33] | HU | 23.01.2018 | |
AL | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 23.01.2021 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/30] | AL | 30.09.2020 | |
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 23.01.2021 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/34] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 23.01.2021 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 23.01.2021 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 23.01.2021 | ||
LU | 23.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/07] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 23.01.2021 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/52] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/50] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/43] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 23.01.2021 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/40] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/30] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | Cited in | International search | [A]WO2013045242 (SIEMENS AG [DE], et al) [A] 1-15 * Figur; Seite 3, Zeile 34 - Seite 5, Zeile 7; Seite 14, Zeilen 22 - 34 *; | [A]US2014042279 (KADONO TOSHIKO [JP], et al) [A] 1-15* Figur 2; Absàtze [0030] und [0031] *; | [A]EP3069918 (SIEMENS AG [DE]) [A] 1-15 * Anspruch 1; Figur; Absatz [0033] *; | [A] - FRANZ KURZWEIL, "Sichere Freischaltung von Oberleitungen- System OLSIG", SIGNAL + DRAHT, DVV, (20130901), vol. 105, no. 9, ISSN 0037-4997, pages 10 - 15, XP001583675 [A] 1-15 * Abschnitt 1, letzter Absatz; Abschnitt 2, letzter Absatz; Abschnitt 3.2.2, letzte zwei Absätze * |