Extract from the Register of European Patents

EP About this file: EP3580449

EP3580449 - HYDROELECTRIC POWER PLANT [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  27.08.2021
Database last updated on 28.03.2026
FormerRequest for examination was made
Status updated on  15.11.2019
FormerThe international publication has been made
Status updated on  18.08.2018
Formerunknown
Status updated on  23.02.2018
Most recent event   Tooltip05.03.2026New entry: Despatch of examination report + time limit 
Applicant(s)For all designated states
Fella Maschinenbau GmbH
Am Grundlosen Brunnen 2
63916 Amorbach / DE
[2019/51]
Inventor(s)01 / FELLA, Günter
Am Grundlosen Brunnen 2
63916 Amorbach / DE
02 / WINKLER, Christian
Hauptstrasse 25
69469 Weinheim / DE
 [2019/51]
Representative(s)Waller, Stefan
Waller-IP
Patent- und Rechtsanwaltsbüro
Landsberger Str. 155
80687 München / DE
[N/P]
Former [2019/51]Waller, Stefan
Waller-IP
Patent- und Rechtsanwälte
Landshuter Allee 10
80637 München / DE
Application number, filing date18704549.711.02.2018
[2019/51]
WO2018EP53369
Priority number, dateDE20171010272710.02.2017         Original published format: DE102017102727
[2019/51]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018146289
Date:16.08.2018
Language:DE
[2018/33]
Type: A1 Application with search report 
No.:EP3580449
Date:18.12.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 16.08.2018 takes the place of the publication of the European patent application.
[2019/51]
Search report(s)International search report - published on:EP16.08.2018
ClassificationIPC:F03B3/18, F03B13/10
[2019/51]
CPC:
F03B3/186 (EP); F03B13/105 (EP); F05B2250/315 (EP);
Y02E10/20 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/51]
TitleGerman:WASSERKRAFTWERK[2019/51]
English:HYDROELECTRIC POWER PLANT[2019/51]
French:CENTRALE HYDROÉLECTRIQUE[2019/51]
Entry into regional phase10.09.2019National basic fee paid 
10.09.2019Designation fee(s) paid 
10.09.2019Examination fee paid 
Examination procedure10.09.2019Amendment by applicant (claims and/or description)
10.09.2019Examination requested  [2019/51]
10.09.2019Date on which the examining division has become responsible
30.08.2021Despatch of a communication from the examining division (Time limit: M06)
09.03.2022Reply to a communication from the examining division
04.03.2026Despatch of a communication from the examining division (Time limit: M04)
Fees paidRenewal fee
21.02.2020Renewal fee patent year 03
17.02.2021Renewal fee patent year 04
17.02.2022Renewal fee patent year 05
29.08.2023Renewal fee patent year 06
29.02.2024Renewal fee patent year 07
10.02.2025Renewal fee patent year 08
25.02.2026Renewal fee patent year 09
Penalty fee
Additional fee for renewal fee
28.02.202306   M06   Fee paid on   29.08.2023
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XI] US2013022456  (LEHOCZKY KALMAN N et al.) [X] 1,4-8 * paragraphs [0014] - [0018] * * figures 5,6 *[I] 9-11
 [XI] EP3029203  (UNIV MUENCHEN TECH et al.) [X] 1 * paragraphs [0019] - [0023] * * figures 2,3 *[I] 9-11
 [XI] DE1080935  (FISCHER ARNO et al.) [X] 1 * paragraphs [0015] - [0018] * * figure 1 *[I] 9-11
 [XI] FR1028681  (NEYRPIC ETS et al.) [X] 1 * abstract *[I] 2,3,9-11
ExaminationBE1023246
 CH699133
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.