EP3582705 - SYSTEM FOR CONFIRMING SAFE DELIVERY PATHWAY TO PATIENT PRIOR TO ENERGY DELIVERY [Right-click to bookmark this link] | |||
Former [2019/52] | METHOD OF CONFIRMING SAFE DELIVERY PATHWAY TO PATIENT PRIOR TO ENERGY DELIVERY | ||
[2020/41] | Status | No opposition filed within time limit Status updated on 12.11.2021 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 04.12.2020 | ||
Former | Grant of patent is intended Status updated on 15.09.2020 | ||
Former | Request for examination was made Status updated on 22.11.2019 | ||
Former | The international publication has been made Status updated on 25.08.2018 | ||
Former | unknown Status updated on 27.02.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Medtronic, Inc. 710 Medtronic Parkway NE Minneapolis, Minnesota 55432 / US | [2019/52] | Inventor(s) | 01 /
FRAASCH, Steven J. 19263 81st Place N. Maple Grove, Minnesota 55311 / US | 02 /
CONDIE, Catherine R. 4187 Reiland Lane Shoreview, Minnesota 55126 / US | 03 /
REHBERGER, Trenton J. 2526 Washington St. NE Minneapolis, Minnesota 55418 / US | 04 /
STEWART, Mark T. 6250 Baldwin Lake Road Lino Lakes, Minnesota 55014 / US | 05 /
ZHANG, Qin 418 Majestic Court Shoreview, Minnesota 55126 / US | [2019/52] | Representative(s) | FRKelly Waterways House Grand Canal Quay Dublin D02 PD39 / IE | [N/P] |
Former [2019/52] | FRKelly 27 Clyde Road Dublin D04 F838 / IE | Application number, filing date | 18705252.7 | 30.01.2018 | [2019/52] | WO2018US15862 | Priority number, date | US201715432134 | 14.02.2017 Original published format: US201715432134 | [2019/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018151932 | Date: | 23.08.2018 | Language: | EN | [2018/34] | Type: | A1 Application with search report | No.: | EP3582705 | Date: | 25.12.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.08.2018 takes the place of the publication of the European patent application. | [2019/52] | Type: | B1 Patent specification | No.: | EP3582705 | Date: | 06.01.2021 | Language: | EN | [2021/01] | Search report(s) | International search report - published on: | EP | 23.08.2018 | Classification | IPC: | A61B18/12, A61B18/14, A61N1/08, A61B18/00 | [2019/52] | CPC: |
A61B18/1233 (EP,US);
A61B18/1206 (EP,US);
A61B18/1492 (EP,US);
A61B2018/00357 (US);
A61B2018/00398 (US);
A61B2018/00577 (US);
A61B2018/00666 (EP,US);
A61B2018/00708 (EP,US);
A61B2018/00875 (EP,US);
A61B2018/00898 (EP,US);
A61B2018/1273 (US);
A61B2018/128 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM ZUR BESTÄTIGUNG DES SICHEREN ABGABEWEGS AN EINEN PATIENTEN VOR DER ENERGIEABGABE | [2020/41] | English: | SYSTEM FOR CONFIRMING SAFE DELIVERY PATHWAY TO PATIENT PRIOR TO ENERGY DELIVERY | [2020/41] | French: | SYSTÈME DE CONFIRMATION DE VOIE DE DISTRIBUTION SÛRE À UN PATIENT AVANT DISTRIBUTION D'ÉNERGIE | [2020/41] |
Former [2019/52] | VERFAHREN ZUR BESTÄTIGUNG DES SICHEREN ABGABEWEGS AN EINEN PATIENTEN VOR DER ENERGIEABGABE | ||
Former [2019/52] | METHOD OF CONFIRMING SAFE DELIVERY PATHWAY TO PATIENT PRIOR TO ENERGY DELIVERY | ||
Former [2019/52] | PROCÉDÉ DE CONFIRMATION DE VOIE DE DISTRIBUTION SÛRE À UN PATIENT AVANT DISTRIBUTION D'ÉNERGIE | Entry into regional phase | 12.07.2019 | National basic fee paid | 12.07.2019 | Designation fee(s) paid | 12.07.2019 | Examination fee paid | Examination procedure | 12.07.2019 | Amendment by applicant (claims and/or description) | 12.07.2019 | Examination requested [2019/52] | 12.07.2019 | Date on which the examining division has become responsible | 16.09.2020 | Communication of intention to grant the patent | 25.11.2020 | Fee for grant paid | 25.11.2020 | Fee for publishing/printing paid | 25.11.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20206030.7 / EP3808297 | Opposition(s) | 07.10.2021 | No opposition filed within time limit [2021/50] | Fees paid | Renewal fee | 21.01.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.01.2018 | AL | 06.01.2021 | AT | 06.01.2021 | CY | 06.01.2021 | CZ | 06.01.2021 | DK | 06.01.2021 | EE | 06.01.2021 | ES | 06.01.2021 | FI | 06.01.2021 | HR | 06.01.2021 | IT | 06.01.2021 | LT | 06.01.2021 | LV | 06.01.2021 | MC | 06.01.2021 | MK | 06.01.2021 | MT | 06.01.2021 | PL | 06.01.2021 | RO | 06.01.2021 | RS | 06.01.2021 | SE | 06.01.2021 | SI | 06.01.2021 | SK | 06.01.2021 | SM | 06.01.2021 | TR | 06.01.2021 | IE | 30.01.2021 | LU | 30.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | NL | 06.02.2021 | BG | 06.04.2021 | NO | 06.04.2021 | GR | 07.04.2021 | IS | 06.05.2021 | PT | 06.05.2021 | [2024/42] |
Former [2024/29] | HU | 30.01.2018 | |
AL | 06.01.2021 | ||
AT | 06.01.2021 | ||
CY | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
MK | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
TR | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
NL | 06.02.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2024/23] | HU | 30.01.2018 | |
AL | 06.01.2021 | ||
AT | 06.01.2021 | ||
CY | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
MK | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
NL | 06.02.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2023/33] | HU | 30.01.2018 | |
AL | 06.01.2021 | ||
AT | 06.01.2021 | ||
CY | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
NL | 06.02.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2023/30] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CY | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
NL | 06.02.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2023/29] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
NL | 06.02.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2022/34] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2022/23] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2022/13] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2022/10] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2022/08] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
ES | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2022/07] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
IE | 30.01.2021 | ||
LU | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/52] | AT | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
LU | 30.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/50] | AT | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
LU | 30.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/49] | AT | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
LU | 30.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/48] | AT | 06.01.2021 | |
CZ | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
LU | 30.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/46] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
LU | 30.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/45] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
LU | 30.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/43] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
LU | 30.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/42] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/39] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/38] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/37] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
RS | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/36] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/35] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
NO | 06.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/33] | FI | 06.01.2021 | |
LT | 06.01.2021 | ||
NO | 06.04.2021 | ||
PT | 06.05.2021 | Cited in | International search | [YA]EP2301462 (TYCO HEALTHCARE [US]); | [Y]US7966137 (FANTONI PAOLO F [IT]); | [Y]KR101570506B (UNIV YONSEI IACF [KR]); | [YA]WO2016160448 (MEDTRONIC ABLATION FRONTIERS [US]) |