blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3589874

EP3589874 - A TUBE STRUCTURE WITH A PROTECTED SENSOR AND METHOD FOR MANUFACTURING A TUBE STRUCTURE WITH A PROTECTED SENSOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.12.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  25.12.2020
FormerGrant of patent is intended
Status updated on  24.09.2020
FormerRequest for examination was made
Status updated on  06.12.2019
FormerThe international publication has been made
Status updated on  11.09.2018
Formerunknown
Status updated on  03.03.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Sandvik Intellectual Property AB
811 81 Sandviken / SE
[2020/02]
Inventor(s)01 / HEDBLOM, Erika
Linvägen 14
818 32 Valbo / SE
02 / EDMARKER, Daniel
Jörgen Folkersväg 4
80643 Gävle / SE
 [2020/02]
Representative(s)Setréus, Ellen
Alleima EMEA AB
811 81 Sandviken / SE
[N/P]
Former [2020/02]Sandvik
Sandvik Intellectual Property AB
811 81 Sandviken / SE
Application number, filing date18706273.223.02.2018
[2020/02]
WO2018EP54566
Priority number, dateEP2017015857928.02.2017         Original published format: EP 17158579
[2020/02]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018158162
Date:07.09.2018
Language:EN
[2018/36]
Type: A1 Application with search report 
No.:EP3589874
Date:08.01.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 07.09.2018 takes the place of the publication of the European patent application.
[2020/02]
Type: B1 Patent specification 
No.:EP3589874
Date:27.01.2021
Language:EN
[2021/04]
Search report(s)International search report - published on:EP07.09.2018
ClassificationIPC:F16L9/02, F16L9/14, F16L9/18, G01M3/04, G01M3/18
[2020/02]
CPC:
F16L9/02 (EP,KR,US); F16L55/00 (KR); F16L9/14 (EP,KR,US);
F16L9/18 (EP,KR,US); F16L2201/30 (EP,US); F16L39/005 (US);
F16L58/08 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/02]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SCHLAUCHSTRUKTUR MIT GESCHÜTZTEM SENSOR UND VERFAHREN ZUR HERSTELLUNG EINER SCHLAUCHSTRUKTUR MIT GESCHÜTZTEM SENSOR[2020/39]
English:A TUBE STRUCTURE WITH A PROTECTED SENSOR AND METHOD FOR MANUFACTURING A TUBE STRUCTURE WITH A PROTECTED SENSOR[2020/02]
French:STRUCTURE DE TUBE AVEC UN CAPTEUR PROTÉGÉ ET PROCÉDÉ DE FABRICATION D'UNE STRUCTURE DE TUBE AVEC UN CAPTEUR PROTÉGÉ[2020/02]
Former [2020/02]SCHLAUCHSTRUKTUR MIT EINEM GESCHÜTZTEN SENSOR UND VERFAHREN ZUR HERSTELLUNG EINER SCHLAUCHSTRUKTUR MIT EINEM GESCHÜTZTEN SENSOR
Entry into regional phase30.09.2019National basic fee paid 
30.09.2019Designation fee(s) paid 
30.09.2019Examination fee paid 
Examination procedure30.09.2019Examination requested  [2020/02]
30.09.2019Date on which the examining division has become responsible
25.09.2020Communication of intention to grant the patent
16.12.2020Fee for grant paid
16.12.2020Fee for publishing/printing paid
16.12.2020Receipt of the translation of the claim(s)
Opposition(s)28.10.2021No opposition filed within time limit [2022/01]
Fees paidRenewal fee
13.02.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.02.2018
AL27.01.2021
CY27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
MK27.01.2021
MT27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
[2024/42]
Former [2024/23]HU23.02.2018
AL27.01.2021
CY27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
MK27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2023/33]HU23.02.2018
AL27.01.2021
CY27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2023/30]AL27.01.2021
CY27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2023/29]AL27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2022/34]AL27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2022/23]AL27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
IT27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2022/13]AL27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2022/10]AL27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2022/07]AL27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SK27.01.2021
SM27.01.2021
IE23.02.2021
LU23.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/50]DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SK27.01.2021
SM27.01.2021
LU23.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/49]DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RS27.01.2021
SM27.01.2021
LU23.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/48]EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RS27.01.2021
SM27.01.2021
LU23.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/46]FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RS27.01.2021
SM27.01.2021
LU23.02.2021
CH28.02.2021
LI28.02.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/45]FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RS27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/42]FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RS27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/39]FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RS27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/37]FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
RS27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/36]FI27.01.2021
HR27.01.2021
LT27.01.2021
BG27.04.2021
NO27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/35]FI27.01.2021
HR27.01.2021
LT27.01.2021
NO27.04.2021
PT27.05.2021
Former [2021/33]FI27.01.2021
LT27.01.2021
NO27.04.2021
PT27.05.2021
Cited inInternational search[A]JPH04160335  (FURUKAWA ELECTRIC CO LTD) [A] 1-16 * abstract *;
 [A]US5497809  (WOLF LAWRENCE W [US]) [A] 1-16 * column 3, line 54 - column 9, line 51; figures 1,6a,7a *;
 [A]US2012175005  (ANDERSEN JACOB [US]) [A] 1-16 * abstract * * columns 12-43 *;
 [A]US8256469  (FELIX-HENRY ANTOINE [FR]) [A] 1-16 * column 5, line 31 - column 7, line 44; figures 1,2 *;
 [A]WO2013135244  (NAT OILWELL VARCO DENMARK IS [DK]) [A] 1-16 * page 7, line 4 - page 10, line 3; figure 4 * * page 17, line 7 - page 21, line 12 * * page 26, line 24 - page 29 *;
 [A]WO2014169366  (VALLOUREC TUBOS DO BRASIL S A [BR]) [A] 13,14* pages 6-15; figures 1,3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.