Extract from the Register of European Patents

EP About this file: EP3574023

EP3574023 - FLOW IN A SLURRY LOOP REACTOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.09.2021
Database last updated on 09.04.2026
FormerThe patent has been granted
Status updated on  16.10.2020
FormerGrant of patent is intended
Status updated on  25.06.2020
FormerRequest for examination was made
Status updated on  01.11.2019
FormerThe international publication has been made
Status updated on  04.08.2018
Formerunknown
Status updated on  23.03.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Chevron Phillips Chemical Company LP
10001 Six Pines Drive
The Woodlands, Texas 77380 / US
For all designated states
Kufeld, Scott, E.
1331 Prospect
Houston, TX 77004 / US
For all designated states
Hottovy, John D.
24104 N.W. 122nd Street
Redmond, Washington 98053 / US
[2020/47]
Former [2019/49]For all designated states
Chevron Phillips Chemical Company LP
10001 Six Pines Drive
The Woodlands, Texas 77380 / US
For all designated states
Kufeld, Scott, E.
1331 Prospect
Houston, TX 77004 / US
For all designated states
Hottovy, John
24104 N.W. 122nd Street
Redmond, Washington 98053 / US
Inventor(s)01 / KUFELD, Scott E.
1331 Prospect
Houston, Texas 77004 / US
02 / HOTTOVY, John D.
24104 N.W. 122nd Street
Redmond, Washington 98053 / US
 [2019/49]
Representative(s)Turner, Craig Robert, et al
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
[N/P]
Former [2020/47]King, Lawrence, et al
A.A. Thornton & Co.
15 Old Bailey
London EC4M 7EF / GB
Former [2019/49]King, Lawrence, et al
A.A. Thornton & Co.
10 Old Bailey
London EC4M 7NG / GB
Application number, filing date18710171.208.01.2018
[2019/49]
WO2018US12726
Priority number, dateUS20171541386824.01.2017         Original published format: US201715413868
[2019/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018140213
Date:02.08.2018
Language:EN
[2018/31]
Type: A1 Application with search report 
No.:EP3574023
Date:04.12.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 02.08.2018 takes the place of the publication of the European patent application.
[2019/49]
Type: B1 Patent specification 
No.:EP3574023
Date:18.11.2020
Language:EN
[2020/47]
Search report(s)International search report - published on:EP02.08.2018
ClassificationIPC:C08F2/01, C08F2/18
[2019/49]
CPC:
C08F10/00 (EP,RU,US); B01J19/2435 (US); B01J19/0013 (US);
C08F10/02 (EP,RU,US); C08F2/01 (RU,US); B01J2219/00094 (US);
B01J2219/00162 (US) (-)
C-Set:
C08F10/00, C08F2/01 (EP,US);
C08F10/00, C08F2/18 (US,EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/49]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:STRÖMUNG IN EINEM SUSPENSIONSSCHLAUFENREAKTOR[2019/49]
English:FLOW IN A SLURRY LOOP REACTOR[2019/49]
French:ÉCOULEMENT DANS UN RÉACTEUR À BOUCLE EN SUSPENSION[2019/49]
Entry into regional phase02.08.2019National basic fee paid 
02.08.2019Designation fee(s) paid 
02.08.2019Examination fee paid 
Examination procedure02.08.2019Examination requested  [2019/49]
02.08.2019Date on which the examining division has become responsible
06.02.2020Amendment by applicant (claims and/or description)
26.06.2020Communication of intention to grant the patent
08.10.2020Fee for grant paid
08.10.2020Fee for publishing/printing paid
08.10.2020Receipt of the translation of the claim(s)
Opposition(s)19.08.2021No opposition filed within time limit [2021/43]
Fees paidRenewal fee
27.01.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.01.2018
AL18.11.2020
CY18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
MK18.11.2020
MT18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
TR18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
[2024/42]
Former [2024/29]HU08.01.2018
AL18.11.2020
CY18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
MK18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
TR18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2024/23]HU08.01.2018
AL18.11.2020
CY18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
MK18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2023/33]HU08.01.2018
AL18.11.2020
CY18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2023/30]AL18.11.2020
CY18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2022/23]AL18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2022/10]AL18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
PT18.03.2021
Former [2022/08]AL18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
ES18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2022/07]AL18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
IE08.01.2021
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/52]AL18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
LU08.01.2021
CH31.01.2021
LI31.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/50]AL18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SI18.11.2020
SK18.11.2020
SM18.11.2020
LU08.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/48]AL18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
IT18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
LU08.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/45]AL18.11.2020
CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
LU08.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/43]CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
LU08.01.2021
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/40]CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
MC18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/37]CZ18.11.2020
DK18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/36]CZ18.11.2020
EE18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/35]CZ18.11.2020
FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RO18.11.2020
RS18.11.2020
SE18.11.2020
SK18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/33]FI18.11.2020
HR18.11.2020
LT18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/32]FI18.11.2020
HR18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
SM18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/28]FI18.11.2020
HR18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/25]FI18.11.2020
LV18.11.2020
PL18.11.2020
RS18.11.2020
SE18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
IS18.03.2021
PT18.03.2021
Former [2021/23]FI18.11.2020
LV18.11.2020
RS18.11.2020
SE18.11.2020
BG18.02.2021
NO18.02.2021
GR19.02.2021
PT18.03.2021
Former [2021/22]FI18.11.2020
RS18.11.2020
NO18.02.2021
PT18.03.2021
Former [2021/21]FI18.11.2020
PT18.03.2021
Former [2021/20]FI18.11.2020
Cited inInternational search[A] WO2006056761  (INNOVENE MFG BELGIUM NV et al.)
 [A] US9358515  (HOTTOVY JOHN D et al.)
 [A] US8871886  (HOTTOVY JOHN D et al.)
 [A] US2015175721  (HENDRICKSON GREGORY G et al.)
by applicantUS4674290
 US5183866
 US5455314
 US5565174
 US6045661
 US6051631
 US6114501
 US6262191
 US8354063
 US7736597
 US7014821
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.