EP3596858 - QUANTUM KEY DISTRIBUTION IN OPTICAL COMMUNICATIONS NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.08.2024 Database last updated on 26.04.2025 | |
Former | The patent has been granted Status updated on 25.08.2023 | ||
Former | Grant of patent is intended Status updated on 03.05.2023 | ||
Former | Examination is in progress Status updated on 25.11.2021 | ||
Former | Request for examination was made Status updated on 20.12.2019 | ||
Former | The international publication has been made Status updated on 22.09.2018 | ||
Former | unknown Status updated on 24.03.2018 | Most recent event Tooltip | 07.02.2025 | Lapse of the patent in a contracting state New state(s): CH | published on 12.03.2025 [2025/11] | Applicant(s) | For all designated states British Telecommunications public limited company 1 Braham Street London E1 8EE / GB | [2022/07] |
Former [2020/04] | For all designated states British Telecommunications Public Limited Company 81 Newgate Street London EC1A 7AJ / GB | Inventor(s) | 01 /
PARKIN, Neil Ground Floor Faraday Building 1 Kightrider Street London EC4V 5BT / GB | 02 /
LORD, Andrew Ground Floor Faraday Building 1 Kightrider Street London EC4V 5BT / GB | [2020/04] | Representative(s) | British Telecommunications public limited company Intellectual Property Department 9th Floor One Braham Braham Street London E1 8EE / GB | [2023/39] |
Former [2020/04] | British Telecommunications public limited company Intellectual Property Department Ground Floor, Faraday Building 1 Knightrider Street London EC4V 5BT / GB | Application number, filing date | 18710843.6 | 09.03.2018 | [2020/04] | WO2018EP55948 | Priority number, date | EP20170161330 | 16.03.2017 Original published format: EP 17161330 | [2020/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018166920 | Date: | 20.09.2018 | Language: | EN | [2018/38] | Type: | A1 Application with search report | No.: | EP3596858 | Date: | 22.01.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.09.2018 takes the place of the publication of the European patent application. | [2020/04] | Type: | B1 Patent specification | No.: | EP3596858 | Date: | 27.09.2023 | Language: | EN | [2023/39] | Search report(s) | International search report - published on: | EP | 20.09.2018 | Classification | IPC: | H04J14/02, H04L9/08, H04B10/70 | [2020/04] | CPC: |
H04J14/0275 (EP);
H04L9/0852 (EP,US);
H04B10/70 (EP);
H04B10/85 (US);
H04J14/0256 (EP);
H04Q11/0005 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | KOMMUNIKATIONSNETZKNOTEN | [2023/18] | English: | QUANTUM KEY DISTRIBUTION IN OPTICAL COMMUNICATIONS NETWORK | [2020/04] | French: | NOEUD DE RÉSEAU DE COMMUNICATIONS | [2023/21] |
Former [2020/04] | QUANTENSCHLÜSSELVERTEILUNG IN EINEM OPTISCHEN KOMMUNIKATIONSNETZWERK | ||
Former [2020/04] | DISTRIBUTION DE CLÉ QUANTIQUE DANS UN RÉSEAU DE COMMUNICATION OPTIQUE | Entry into regional phase | 30.08.2019 | National basic fee paid | 30.08.2019 | Designation fee(s) paid | 30.08.2019 | Examination fee paid | Examination procedure | 30.08.2019 | Examination requested [2020/04] | 30.08.2019 | Date on which the examining division has become responsible | 16.04.2020 | Amendment by applicant (claims and/or description) | 24.11.2021 | Despatch of a communication from the examining division (Time limit: M06) | 01.06.2022 | Reply to a communication from the examining division | 04.05.2023 | Communication of intention to grant the patent | 22.08.2023 | Fee for grant paid | 22.08.2023 | Fee for publishing/printing paid | 22.08.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 28.06.2024 | No opposition filed within time limit [2024/36] | Fees paid | Renewal fee | 31.01.2020 | Renewal fee patent year 03 | 31.01.2021 | Renewal fee patent year 04 | 31.12.2021 | Renewal fee patent year 05 | 03.01.2023 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 27.09.2023 | BG | 27.09.2023 | CZ | 27.09.2023 | DK | 27.09.2023 | EE | 27.09.2023 | ES | 27.09.2023 | FI | 27.09.2023 | HR | 27.09.2023 | IT | 27.09.2023 | LT | 27.09.2023 | LV | 27.09.2023 | MC | 27.09.2023 | NL | 27.09.2023 | PL | 27.09.2023 | RO | 27.09.2023 | RS | 27.09.2023 | SE | 27.09.2023 | SI | 27.09.2023 | SK | 27.09.2023 | SM | 27.09.2023 | NO | 27.12.2023 | GR | 28.12.2023 | IS | 27.01.2024 | PT | 29.01.2024 | IE | 09.03.2024 | LU | 09.03.2024 | BE | 31.03.2024 | CH | 31.03.2024 | [2025/11] |
Former [2025/10] | AT | 27.09.2023 | |
BG | 27.09.2023 | ||
CZ | 27.09.2023 | ||
DK | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
IT | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
MC | 27.09.2023 | ||
NL | 27.09.2023 | ||
PL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SI | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
IE | 09.03.2024 | ||
LU | 09.03.2024 | ||
BE | 31.03.2024 | ||
Former [2025/08] | AT | 27.09.2023 | |
BG | 27.09.2023 | ||
CZ | 27.09.2023 | ||
DK | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
IT | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
MC | 27.09.2023 | ||
NL | 27.09.2023 | ||
PL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SI | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
LU | 09.03.2024 | ||
BE | 31.03.2024 | ||
Former [2024/52] | AT | 27.09.2023 | |
BG | 27.09.2023 | ||
CZ | 27.09.2023 | ||
DK | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
IT | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
MC | 27.09.2023 | ||
NL | 27.09.2023 | ||
PL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SI | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
LU | 09.03.2024 | ||
Former [2024/51] | AT | 27.09.2023 | |
BG | 27.09.2023 | ||
CZ | 27.09.2023 | ||
DK | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
IT | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
NL | 27.09.2023 | ||
PL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SI | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
Former [2024/49] | AT | 27.09.2023 | |
CZ | 27.09.2023 | ||
DK | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
IT | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
NL | 27.09.2023 | ||
PL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SI | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
Former [2024/33] | AT | 27.09.2023 | |
CZ | 27.09.2023 | ||
DK | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
IT | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
NL | 27.09.2023 | ||
PL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
Former [2024/26] | AT | 27.09.2023 | |
CZ | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
IT | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
NL | 27.09.2023 | ||
PL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
Former [2024/25] | AT | 27.09.2023 | |
CZ | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
NL | 27.09.2023 | ||
PL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
Former [2024/23] | AT | 27.09.2023 | |
CZ | 27.09.2023 | ||
EE | 27.09.2023 | ||
ES | 27.09.2023 | ||
FI | 27.09.2023 | ||
HR | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
NL | 27.09.2023 | ||
RO | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SK | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
PT | 29.01.2024 | ||
Former [2024/20] | FI | 27.09.2023 | |
HR | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
NL | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
SM | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
IS | 27.01.2024 | ||
Former [2024/14] | FI | 27.09.2023 | |
HR | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
NL | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
Former [2024/10] | FI | 27.09.2023 | |
HR | 27.09.2023 | ||
LT | 27.09.2023 | ||
LV | 27.09.2023 | ||
RS | 27.09.2023 | ||
SE | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
Former [2024/09] | FI | 27.09.2023 | |
LT | 27.09.2023 | ||
SE | 27.09.2023 | ||
NO | 27.12.2023 | ||
GR | 28.12.2023 | ||
Former [2024/08] | LT | 27.09.2023 | |
NO | 27.12.2023 | ||
GR | 28.12.2023 | Cited in | International search | [A]US2007212063 (MELI FAUSTO [IT], et al) [A] 1-21 * page 1, paragraphs 1,6 * * page 2, paragraph 17 - paragraph 26 * * page 3, paragraph 36 - paragraph 37; figures 1-4 *; | [XI]US2012195428 (WELLBROCK GLENN A [US], et al) [X] 1-3,11-15 * page 1, paragraph 10 * * page 2, paragraph 14 * * page 4, paragraph 45 - page 5, paragraph 49 * * figures 8-10 * [I] 4-10,16-21; | [A]US2014341575 (CHOI IRIS [GB], et al) [A] 1-21 * page 1, paragraph 6 - page 2, paragraph 35 * * page 3, paragraph 42 - page 6, paragraph 84 * * figures 2-6 *; | [A] - NWEKE N I ET AL, "EDFA bypass and filtering architecture enabling QKD+WDM coexistence on mid-span amplified links", TECHNICAL DIGEST CD-ROM / CONFERENCE ON LASERS AND ELECTRO-OPTICS, QUANTUM ELECTRONICS AND LASER SCIENCE CONFERENCE, CONFERENCE ON PHOTONIC APPLICATIONS, SYSTEMS AND TECHNOLOGIES : LONG BEACH CONVENTION CENTER, LONG BEACH, CALIFORNIA, USA ; CLEO/QELS, (20060521), ISBN 978-1-55752-813-1, pages 1 - 2, XP031394634 [A] 1-21 * the whole document * | [A] - RUNSER R J ET AL, "Demonstration of 1.3 /spl mu/m quantum key distribution (QKD) compatibility with 1.5 /spl mu/m metropolitan wavelength division multiplexed (WDM) systems", 2005 OPTICAL FIBER COMMUNICATIONS CONFERENCE TECHNICAL DIGEST (IEEE CAT. NO. 05CH37672) IEEE PISCATAWAY, NJ, USA, IEEE, (20050306), vol. 3, ISBN 978-1-55752-783-7, pages 206 - 208, XP010831698 [A] 1-21 * the whole document * | [A] - ROHDE H ET AL, "Quantum key distribution integrated into commercial WDM systems", OPTICAL FIBER COMMUNICATION/NATIONAL FIBER OPTIC ENGINEERS CONFERENCE, 2008. OFC/NFOEC 2008. CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20080224), ISBN 978-1-55752-856-8, pages 1 - 3, XP031391760 [A] 1-21 * the whole document * |