blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3601729

EP3601729 - DOWNHOLE DRILLING SYSTEM [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  28.01.2022
Database last updated on 18.11.2024
FormerRequest for examination was made
Status updated on  03.01.2020
FormerThe international publication has been made
Status updated on  29.09.2018
Formerunknown
Status updated on  30.03.2018
Most recent event   Tooltip28.01.2022Application deemed to be withdrawnpublished on 02.03.2022  [2022/09]
Applicant(s)For all designated states
Welltec Oilfield Solutions AG
Baarerstrasse 96
6300 Zug / CH
[2020/06]
Inventor(s)01 / NESGAARD, Carsten
c/o Welltec A/S
Gydevang 25
3450 Allerød / DK
 [2020/06]
Representative(s)Dragsted Partners A/S
Rådhuspladsen 16
1550 Copenhagen V / DK
[N/P]
Former [2020/06]Hoffmann Dragsted A/S
Rådhuspladsen 16
1550 Copenhagen V / DK
Application number, filing date18711946.620.03.2018
[2020/06]
WO2018EP56922
Priority number, dateEP2017016204421.03.2017         Original published format: EP 17162044
[2020/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018172300
Date:27.09.2018
Language:EN
[2018/39]
Type: A1 Application with search report 
No.:EP3601729
Date:05.02.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 27.09.2018 takes the place of the publication of the European patent application.
[2020/06]
Search report(s)International search report - published on:EP27.09.2018
ClassificationIPC:E21B47/02, E21B47/09, E21B47/12
[2020/06]
CPC:
E21B47/02 (EP,US); E21B47/022 (US); E21B47/06 (US);
E21B47/07 (US); E21B47/09 (EP,US); E21B47/12 (EP,US);
E21B47/26 (EP,US); E21B41/0085 (US); E21B47/13 (US);
E21B7/04 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/06]
TitleGerman:BOHRLOCHBOHRSYSTEM[2020/06]
English:DOWNHOLE DRILLING SYSTEM[2020/06]
French:SYSTÈME DE FORAGE DE FOND DE TROU[2020/06]
Entry into regional phase10.10.2019National basic fee paid 
10.10.2019Designation fee(s) paid 
10.10.2019Examination fee paid 
Examination procedure10.10.2019Amendment by applicant (claims and/or description)
10.10.2019Examination requested  [2020/06]
10.10.2019Date on which the examining division has become responsible
01.10.2021Application deemed to be withdrawn, date of legal effect  [2022/09]
25.10.2021Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2022/09]
Fees paidRenewal fee
05.03.2020Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.03.202104   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XAYI]US6324904  (ISHIKAWA AKIRA [US], et al) [X] 1,3-5,10-12,14 * abstract * * figures 1-5,31 * * column 2, line 2 - line 40 * * column 4, line 36 - line 57 * * column 5, line 25 - column 6, line 17 * * column 7, line 3 - line 13 * * column 8, line 23 - line 36 * * column 14, line 46 - line 61 * * column 19, line 24 - line 27 * * column 21, line 34 - line 54 * [A] 7,8,13 [Y] 6 [I] 2,9,15;
 [XAI]US2011186290  (RODDY CRAIG W [US], et al) [X] 1,7,8,10-13 * abstract * * figures 1,2 * * paragraph [0053] * * paragraph [0061] - paragraph [0062] * * paragraph [0100] * * paragraph [0151] * * paragraph [0210] - paragraph [0211] * [A] 3-6,14 [I] 2,9,15;
 [A]US2014251600  (SCOTT EDDIE ELMER [US], et al) [A] 1-15 * abstract * * figures 1-4 * * paragraph [0033] * * paragraph [0040] - paragraph [0041] ** paragraph [0045] - paragraph [0049] *;
 [A]CN104179495  (CHINA PETROLEUM & CHEMICAL, et al) [A] 1-15 * abstract * * figure 1 * * paragraph [0032] - paragraph [0036] *;
 [IY]WO2016185235  (MASDAR INST OF SCIENCE AND TECH [AE]) [I] 1-5,7-15 * abstract * * figures 1-4 * * paragraph [0003] * * paragraph [0015] - paragraph [0016] * * paragraph [0031] * * paragraph [0034] - paragraph [0037] * * paragraph [0038] - paragraph [0039] * * paragraph [0041] - paragraph [0046] * * paragraph [0060] - paragraph [0061] * [Y] 6
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.