blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3585999

EP3585999 - JOINT FOR THE OSCILLATING CONNECTION OF THE ROTOR TO A SHAFT OF A WIND TURBINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  29.10.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  20.11.2020
FormerGrant of patent is intended
Status updated on  19.07.2020
FormerRequest for examination was made
Status updated on  05.12.2019
FormerThe international publication has been made
Status updated on  01.09.2018
Formerunknown
Status updated on  05.04.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Seawind Ocean Technology IP B.V.
Overschiestraat 184
1062 XK Amsterdam, NH / NL
[2020/01]
Inventor(s)01 / CARUSO, Silvestro
Via Angelo Carrara 261/5
16147 Genova (GE) / IT
 [2020/01]
Representative(s)De Gaspari, Andrea
De Gaspari Osgnach s.r.l.
Via Altinate, 33
35121 Padova / IT
[2020/52]
Former [2020/01]De Gaspari, Andrea
De Gaspari Osgnach s.r.l.
Via Oberdan, 20
35122 Padova / IT
Application number, filing date18712648.722.02.2018
[2020/01]
WO2018IB51114
Priority number, dateIT2017002084923.02.2017         Original published format: IT201700020849
[2020/01]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018154484
Date:30.08.2018
Language:EN
[2018/35]
Type: A1 Application with search report 
No.:EP3585999
Date:01.01.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 30.08.2018 takes the place of the publication of the European patent application.
[2020/01]
Type: B1 Patent specification 
No.:EP3585999
Date:23.12.2020
Language:EN
[2020/52]
Search report(s)International search report - published on:EP30.08.2018
ClassificationIPC:F03D1/06, F03D80/70, F03D15/00
[2020/01]
CPC:
F03D15/00 (EP,US); F03D1/0691 (EP,US); F03D80/70 (EP,US);
F05B2240/2022 (EP); F05B2260/964 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/01]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERBINDUNG ZUR OSZILLIERENDEN VERBINDUNG DES ROTORS MIT EINER WELLE EINER WINDTURBINE[2020/01]
English:JOINT FOR THE OSCILLATING CONNECTION OF THE ROTOR TO A SHAFT OF A WIND TURBINE[2020/01]
French:JOINT POUR LA LIAISON OSCILLANTE DU ROTOR À UN ARBRE D'UNE ÉOLIENNE[2020/01]
Entry into regional phase18.09.2019National basic fee paid 
18.09.2019Designation fee(s) paid 
18.09.2019Examination fee paid 
Examination procedure21.12.2018Request for preliminary examination filed
International Preliminary Examining Authority: EP
18.09.2019Examination requested  [2020/01]
18.09.2019Date on which the examining division has become responsible
02.04.2020Amendment by applicant (claims and/or description)
20.07.2020Communication of intention to grant the patent
11.11.2020Fee for grant paid
11.11.2020Fee for publishing/printing paid
11.11.2020Receipt of the translation of the claim(s)
Opposition(s)24.09.2021No opposition filed within time limit [2021/48]
Fees paidRenewal fee
18.09.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.02.2018
AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
MK23.12.2020
MT23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
TR23.12.2020
IE22.02.2021
LU22.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
[2024/42]
Former [2024/29]HU22.02.2018
AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
MK23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
TR23.12.2020
IE22.02.2021
LU22.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2024/23]HU22.02.2018
AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
MK23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
IE22.02.2021
LU22.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2023/33]HU22.02.2018
AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
IE22.02.2021
LU22.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2023/30]AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
IE22.02.2021
LU22.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2022/34]AL23.12.2020
AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
IE22.02.2021
LU22.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2022/13]AL23.12.2020
AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
IE22.02.2021
LU22.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2022/07]AL23.12.2020
AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
IE22.02.2021
LU22.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2021/47]AL23.12.2020
AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
LU22.02.2021
CH28.02.2021
LI28.02.2021
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2021/45]AL23.12.2020
AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2021/42]AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2021/41]AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/39]AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/37]AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/36]CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/35]CZ23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/33]FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
RS23.12.2020
SE23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/32]FI23.12.2020
HR23.12.2020
LV23.12.2020
RS23.12.2020
SE23.12.2020
SM23.12.2020
BG23.03.2021
GR24.03.2021
Former [2021/28]FI23.12.2020
HR23.12.2020
LV23.12.2020
RS23.12.2020
SE23.12.2020
BG23.03.2021
GR24.03.2021
Former [2021/23]FI23.12.2020
LV23.12.2020
RS23.12.2020
SE23.12.2020
BG23.03.2021
GR24.03.2021
Former [2021/22]FI23.12.2020
RS23.12.2020
Former [2021/20]FI23.12.2020
Cited inInternational search[A]SE7904638L  (SAAB SCANIA AB) [A] 1-13* the whole document *;
 [A]WO02079647  (NORDIC WINDPOWER AB [SE], et al) [A] 1-13 * page 1 - page 5; figures 1,2 *;
 [I]EP2715121  (CONDOR WIND ENERGY LTD [GB]) [I] 1-3,5,9-13 * paragraph [0013] - paragraph [0030]; figures 1-3 *;
 [A]US2015226186  (MITSCH FRANZ [DE], et al) [A] 1-13 * column 23 - column 77; figures 1-14 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.