blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3600148

EP3600148 - STENT-GRAFTS FOR SEALING AROUND EXTERNAL DISTURBANCES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.10.2023
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  04.11.2022
FormerGrant of patent is intended
Status updated on  12.07.2022
FormerRequest for examination was made
Status updated on  03.01.2020
FormerThe international publication has been made
Status updated on  29.09.2018
Formerunknown
Status updated on  17.04.2018
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Endospan Ltd.
4 Maskit Street
P.O. Box 12058
46733 Herzilyia Pituach / IL
[2020/06]
Inventor(s)01 / ZIGELBOIM, Or
12 Sinai Street
Ness Ziona / IL
02 / MARMUR, Yaniv
Yeffe Nof Street
20600 Yokneam Moshava / IL
03 / SHALEV, Alon
13 Eli Cohen Street
4331513 Ra'anana / IL
 [2020/06]
Representative(s)Evens, Paul Jonathan, et al
Maguire Boss
24 East Street
St. Ives, Cambridgeshire PE27 5PD / GB
[2020/06]
Application number, filing date18715139.421.03.2018
[2020/06]
WO2018IL50325
Priority number, dateUS201762474391P21.03.2017         Original published format: US 201762474391 P
[2020/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018173056
Date:27.09.2018
Language:EN
[2018/39]
Type: A1 Application with search report 
No.:EP3600148
Date:05.02.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 27.09.2018 takes the place of the publication of the European patent application.
[2020/06]
Type: B1 Patent specification 
No.:EP3600148
Date:07.12.2022
Language:EN
[2022/49]
Search report(s)International search report - published on:EP27.09.2018
ClassificationIPC:A61F2/07
[2020/06]
CPC:
A61F2/07 (EP,US); A61F2/89 (EP,US); A61F2/915 (US);
A61F2002/061 (EP); A61F2002/065 (EP); A61F2002/826 (US);
A61F2220/0008 (EP,US); A61F2250/0039 (EP,US); A61F2250/006 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/06]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:STENTTRANSPLANTATE ZUR ABDICHTUNG UM EXTERNE STÖRUNGEN[2020/06]
English:STENT-GRAFTS FOR SEALING AROUND EXTERNAL DISTURBANCES[2020/06]
French:STENT-GREFFONS POUR ASSURER L'ÉTANCHÉITÉ AUTOUR DE PERTURBATIONS EXTERNES[2020/06]
Entry into regional phase16.10.2019National basic fee paid 
16.10.2019Designation fee(s) paid 
16.10.2019Examination fee paid 
Examination procedure16.10.2019Examination requested  [2020/06]
16.10.2019Date on which the examining division has become responsible
16.04.2020Amendment by applicant (claims and/or description)
13.07.2022Communication of intention to grant the patent
27.09.2022Receipt of the translation of the claim(s)
01.11.2022Fee for grant paid
01.11.2022Fee for publishing/printing paid
Opposition(s)08.09.2023No opposition filed within time limit [2023/46]
Fees paidRenewal fee
24.03.2020Renewal fee patent year 03
24.03.2021Renewal fee patent year 04
25.03.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
IT07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IE21.03.2023
LU21.03.2023
BE31.03.2023
CH31.03.2023
LI31.03.2023
IS07.04.2023
PT10.04.2023
[2024/26]
Former [2024/12]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IE21.03.2023
LU21.03.2023
BE31.03.2023
CH31.03.2023
LI31.03.2023
IS07.04.2023
PT10.04.2023
Former [2024/09]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IE21.03.2023
LU21.03.2023
CH31.03.2023
LI31.03.2023
IS07.04.2023
PT10.04.2023
Former [2024/08]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IE21.03.2023
LU21.03.2023
IS07.04.2023
PT10.04.2023
Former [2024/02]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
LU21.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/51]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/48]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/46]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/39]AL07.12.2022
AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/38]AL07.12.2022
AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
PT10.04.2023
Former [2023/37]AL07.12.2022
AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
PT10.04.2023
Former [2023/35]AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
PT10.04.2023
Former [2023/34]EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RS07.12.2022
SE07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
PT10.04.2023
Former [2023/33]ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RS07.12.2022
SE07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
Former [2023/25]ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RS07.12.2022
SE07.12.2022
NO07.03.2023
GR08.03.2023
Former [2023/23]ES07.12.2022
FI07.12.2022
LT07.12.2022
LV07.12.2022
SE07.12.2022
NO07.03.2023
GR08.03.2023
Former [2023/22]ES07.12.2022
FI07.12.2022
LT07.12.2022
SE07.12.2022
NO07.03.2023
Former [2023/20]LT07.12.2022
NO07.03.2023
Cited inInternational search[A]WO0042949  (GORE ENTERPRISE HOLDINGS INC [US]) [A] 1-39* page 8, lines 1-10; figure 3 *;
 [A]US6729356  (BAKER STEVEN G [US], et al) [A] 1-39 * column 7, lines 18-45; figures 5-9 *;
 [XA]WO2014197743  (AORTIC INNOVATIONS SURENA LLC [US]) [X] 39 * paragraphs [0081] - [0085]; figures 5-11 * [A] 1-38
by applicantWO2008107885
 WO2010150208
 WO2011007354
 WO2011055364
 WO2011064782
 WO2011067764
 WO2011070576
 WO2011095979
 US2011208289
 US2012179236
 WO2012104842
 WO2012117395
 US8317856
 US2012310324
 WO2012176187
 US2012330399
 US2013013051
 WO2013005207
 WO2013030819
 WO2013030818
 WO2013065040
 US2013131783
 WO2013084235
 US8574287
 WO2013171730
 WO2014020609
 WO2014108895
 WO2014141232
 US8870938
 WO2014188412
 US8945203
 US8951298
 WO2015075708
 US2015202065
 WO2016098113
 WO2016113731
 WO2016125137
 US9468517
 WO2017081679
 US9855046
 US20070892885
 US20070991726
 US20090219758
 US20090221074
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.