blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3601819

EP3601819 - ROLLING BEARING ARRANGEMENT AND WIND TURBINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.10.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  23.10.2020
FormerGrant of patent is intended
Status updated on  30.08.2020
FormerRequest for examination was made
Status updated on  03.01.2020
FormerThe international publication has been made
Status updated on  06.10.2018
Formerunknown
Status updated on  19.04.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
thyssenkrupp rothe erde Germany GmbH
Tremoniastraße 5-11
44137 Dortmund / DE
For all designated states
thyssenkrupp AG
ThyssenKrupp Allee 1
45143 Essen / DE
[2020/12]
Former [2020/08]For all designated states
thyssenkrupp rothe erde Germany GmbH
Tremoniastraße 5-11
44137 Dortmund / DE
For all designated states
Thyssenkrupp AG
Thyssenkrupp Allee 1
45143 Essen / DE
Former [2020/06]For all designated states
ThyssenKrupp Rothe Erde GmbH
Tremoniastr. 5 - 11
44137 Dortmund / DE
For all designated states
Thyssenkrupp AG
Thyssenkrupp Allee 1
45143 Essen / DE
Inventor(s)01 / BUSEMANN, Nico
Hesslerstr. 27
59065 Hamm / DE
 [2020/06]
Representative(s)thyssenkrupp Intellectual Property GmbH
ThyssenKrupp Allee 1
45143 Essen / DE
[2020/06]
Application number, filing date18715560.123.03.2018
[2020/06]
WO2018EP57487
Priority number, dateDE20171010696231.03.2017         Original published format: DE102017106962
[2020/06]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018177946
Date:04.10.2018
Language:DE
[2018/40]
Type: A1 Application with search report 
No.:EP3601819
Date:05.02.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 04.10.2018 takes the place of the publication of the European patent application.
[2020/06]
Type: B1 Patent specification 
No.:EP3601819
Date:25.11.2020
Language:DE
[2020/48]
Search report(s)International search report - published on:EP04.10.2018
ClassificationIPC:F16C19/38, F16C33/36
[2020/06]
CPC:
F16C19/385 (EP); F03D80/70 (EP); F16C19/386 (EP);
F16C33/366 (EP); F05B2240/50 (EP); F16C2360/31 (EP);
Y02E10/72 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/06]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:WÄLZLAGERANORDNUNG UND WINDKRAFTANLAGE[2020/06]
English:ROLLING BEARING ARRANGEMENT AND WIND TURBINE[2020/06]
French:ENSEMBLE PALIER À ROULEMENT ET ÉOLIENNE[2020/06]
Entry into regional phase31.10.2019National basic fee paid 
31.10.2019Designation fee(s) paid 
31.10.2019Examination fee paid 
Examination procedure31.10.2019Examination requested  [2020/06]
31.10.2019Date on which the examining division has become responsible
06.05.2020Amendment by applicant (claims and/or description)
31.08.2020Communication of intention to grant the patent
14.10.2020Fee for grant paid
14.10.2020Fee for publishing/printing paid
14.10.2020Receipt of the translation of the claim(s)
Opposition(s)26.08.2021No opposition filed within time limit [2021/44]
Fees paidRenewal fee
24.03.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.03.2018
AL25.11.2020
CY25.11.2020
CZ25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
MK25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
TR25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
[2024/29]
Former [2024/23]HU23.03.2018
AL25.11.2020
CY25.11.2020
CZ25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
MK25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/33]HU23.03.2018
AL25.11.2020
CY25.11.2020
CZ25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/30]AL25.11.2020
CY25.11.2020
CZ25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/34]AL25.11.2020
CZ25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/23]AL25.11.2020
CZ25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/10]AL25.11.2020
CZ25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
PT25.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/08]AL25.11.2020
CZ25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
Former [2022/07]AL25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IE23.03.2021
IS25.03.2021
PT25.03.2021
Former [2021/50]AL25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/48]AL25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/46]AL25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/45]AL25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/36]CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/35]CZ25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/33]FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/32]FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/28]FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/25]FI25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/23]FI25.11.2020
LV25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
Former [2021/22]FI25.11.2020
RS25.11.2020
NO25.02.2021
PT25.03.2021
Former [2021/21]FI25.11.2020
PT25.03.2021
Former [2021/20]FI25.11.2020
Cited inInternational search[XI]JP2005147331  (NTN TOYO BEARING CO LTD) [X] 1,9-12 * figures 1, 7 * [I] 2-7;
 [XI]JP2006177446  (NTN TOYO BEARING CO LTD) [X] 1,8-12 * figures 2, 3, 5 * [I] 2-7;
 [XI]WO2007095953  (VESTAS WIND SYS AS [DK], et al) [X] 1,8,10-12 * figures 1, 4a * [I] 2-7;
 [XI]EP1870606  (HANSEN TRANSMISSIONS INT [BE]) [X] 1,8,9 * figures 1, 4 * [I] 2-7;
 [X]  - "DIN ISO 281 Beiblatt 4:2003-04. Waelzlager - Dynamische Tragzahlen und nominelle Lebensdauer - Verfahren zur Berechnung der modifizierten Referenz-Lebensdauer fuer allgemein belastete Waelzlager = Rolling bearings - Dynamic load ratings and rating life - Methods for calculation of the modified refer", DIN ISO 281 BEIBLATT 4, DIN, DE, (20030101), vol. DIN ISO 281 Beiblatt 4, pages 441 - 468, XP009505177 [X] 1-12 * page 17 *
 [A]  - Schaeffler Technologies Gmbh & Co. Kg, "Kegelrollenlager", (20140801), URL: https://www.schaeffler.de/remotemedien/media/_shared_media/08_media_library/01_publications/schaeffler_2/brochure/downloads_1/pke_de_de.pdf, (20180503), XP055472313 [A] 1-12 * page 5 - page 6 *
 [A]  - Skf, "The Power of Knowledge Engineering", (20150601), URL: http://www.skf.com/binary/49-291738/15835_DE_Upgraded_Explorer_4rTRB-Brochure.pdf, (20180503), XP055472323 [A] 1-12 * page 7 *
by applicantDE102007049087
 DE102014104862
 DE102014106558
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.