EP3606502 - HAIR DYEING PROCESS COMPRISING A PIGMENT AND AN AQUEOUS DISPERSION OF SUPRAMOLECULAR POLYMER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.07.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 23.07.2021 | ||
Former | Grant of patent is intended Status updated on 10.06.2021 | ||
Former | Request for examination was made Status updated on 10.01.2020 | ||
Former | The international publication has been made Status updated on 13.10.2018 | ||
Former | unknown Status updated on 19.04.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states L'Oreal 14 rue Royale 75008 Paris / FR | [2020/07] | Inventor(s) | 01 /
CHODOROWSKI-KIMMES, Sandrine L'OREAL 1 ave Eugène Schueller BP22 93601 Aulnay-Sous-Bois / FR | [2020/07] | Representative(s) | L'Oreal Service D.I.P.I. 9, rue Pierre Dreyfus 92110 Clichy / FR | [2020/07] | Application number, filing date | 18715726.8 | 09.04.2018 | [2020/07] | WO2018EP59026 | Priority number, date | FR20170053078 | 07.04.2017 Original published format: FR 1753078 | [2020/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018185335 | Date: | 11.10.2018 | Language: | EN | [2018/41] | Type: | A1 Application with search report | No.: | EP3606502 | Date: | 12.02.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.10.2018 takes the place of the publication of the European patent application. | [2020/07] | Type: | B1 Patent specification | No.: | EP3606502 | Date: | 25.08.2021 | Language: | EN | [2021/34] | Search report(s) | International search report - published on: | EP | 11.10.2018 | Classification | IPC: | A61K8/81, A61Q5/06, A61K8/46 | [2020/07] | CPC: |
A61Q5/065 (EP,US);
A61K8/8194 (EP,US);
A61K8/463 (EP,US);
A61K2800/43 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | HAARFÄRBEVERFAHREN MIT EINEM PIGMENT UND EINER WÄSSRIGEN DISPERSION AUS SUPRAMOLEKULAREM POLYMER | [2020/07] | English: | HAIR DYEING PROCESS COMPRISING A PIGMENT AND AN AQUEOUS DISPERSION OF SUPRAMOLECULAR POLYMER | [2020/07] | French: | PROCÉDÉ DE COLORATION CAPILLAIRE COMPRENANT UN PIGMENT ET UNE DISPERSION AQUEUSE DE POLYMÈRE SUPRAMOLÉCULAIRE | [2020/07] | Entry into regional phase | 07.11.2019 | National basic fee paid | 07.11.2019 | Designation fee(s) paid | 07.11.2019 | Examination fee paid | Examination procedure | 07.11.2019 | Examination requested [2020/07] | 07.11.2019 | Date on which the examining division has become responsible | 11.05.2020 | Amendment by applicant (claims and/or description) | 11.06.2021 | Communication of intention to grant the patent | 19.07.2021 | Fee for grant paid | 19.07.2021 | Fee for publishing/printing paid | 19.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 27.05.2022 | No opposition filed within time limit [2022/31] | Fees paid | Renewal fee | 31.03.2020 | Renewal fee patent year 03 | 15.04.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.04.2018 | AL | 25.08.2021 | AT | 25.08.2021 | CY | 25.08.2021 | CZ | 25.08.2021 | DK | 25.08.2021 | EE | 25.08.2021 | FI | 25.08.2021 | HR | 25.08.2021 | LT | 25.08.2021 | LV | 25.08.2021 | MC | 25.08.2021 | MK | 25.08.2021 | MT | 25.08.2021 | NL | 25.08.2021 | PL | 25.08.2021 | RO | 25.08.2021 | RS | 25.08.2021 | SE | 25.08.2021 | SI | 25.08.2021 | SK | 25.08.2021 | SM | 25.08.2021 | BG | 25.11.2021 | NO | 25.11.2021 | GR | 26.11.2021 | IS | 25.12.2021 | PT | 27.12.2021 | IE | 09.04.2022 | LU | 09.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | [2024/44] |
Former [2024/24] | HU | 09.04.2018 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
MK | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
IE | 09.04.2022 | ||
LU | 09.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2024/23] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
MK | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
IE | 09.04.2022 | ||
LU | 09.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2024/20] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
IE | 09.04.2022 | ||
LU | 09.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/20] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
IE | 09.04.2022 | ||
LU | 09.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/10] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
LU | 09.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/09] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
LU | 09.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/08] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
LU | 09.04.2022 | ||
Former [2023/06] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/36] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/29] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/25] | AT | 25.08.2021 | |
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/24] | AT | 25.08.2021 | |
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/21] | AT | 25.08.2021 | |
DK | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/16] | AT | 25.08.2021 | |
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/10] | AT | 25.08.2021 | |
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/09] | AT | 25.08.2021 | |
FI | 25.08.2021 | ||
LT | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
PT | 27.12.2021 | ||
Former [2022/08] | AT | 25.08.2021 | |
FI | 25.08.2021 | ||
LT | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
Former [2022/07] | AT | 25.08.2021 | |
LT | 25.08.2021 | ||
NO | 25.11.2021 | Cited in | International search | [A]EP2189148 (OREAL [FR]) [A] 1-25 * paragraphs [0013] , [0 14] , [ 121] , [0244] ** paragraph [0054] * | by applicant | US4137180 | US4578266 | US4874554 | FR2679771 | FR2741530 | FR2782723 | EP1184426 | EP1392222 | EP1435900 | FR2907678 | EP2189151 | FR2938760 | - J. Soc. Cosm. Chem., (19540000), vol. 5, pages 249 - 256 | - KIRK-OTHMER'S, Encyclopedia of Chemical Technology, Wiley, (19790000), vol. 22, pages 333 - 432 | - Cosmetics and Toiletries, (19900200), vol. 105, pages 53 - 64 |