blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3615578

EP3615578 - IMPROVED PROCESS FOR PRODUCING ABS GRAFT COPOLYMERS [Right-click to bookmark this link]
StatusPatent maintained as amended
Status updated on  13.10.2023
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  05.02.2021
FormerGrant of patent is intended
Status updated on  14.10.2020
FormerRequest for examination was made
Status updated on  31.01.2020
FormerThe international publication has been made
Status updated on  02.11.2018
Formerunknown
Status updated on  27.04.2018
Most recent event   Tooltip26.07.2024Lapse of the patent in a contracting state
New state(s): AT
published on 28.08.2024 [2024/35]
Applicant(s)For all designated states
INEOS Styrolution Group GmbH
Mainzer Landstraße 50
60325 Frankfurt am Main / DE
[2023/46]
Former [2020/10]For all designated states
INEOS Styrolution Group GmbH
Mainzer Landstraße 50
60325 Frankfurt am Main / DE
Inventor(s)01 / MICHELS, Gisbert
Kuhlmannweg 8
51375 Leverkusen / DE
02 / JANSEN, Ulrich
Stürzelberger Str. 50
41541 Dormagen / DE
03 / KAMINSKY, Stefan
Dinkelackerring 59
67435 Neustadt an der Weinstrasse / DE
04 / WITTENBERG, Nils
Fischbacher Weg 7
65719 Hofheim am Taunus / DE
05 / RÜTER, Fabian
Angelika-Kauffmann-Str. 4
41470 Neuss / DE
 [2020/10]
Representative(s)Jacobi, Markus Alexander
Patentanwälte
Isenbruck Bösl Hörschler PartG mbB
Eastsite One
Seckenheimer Landstrasse 4
68163 Mannheim / DE
[2020/10]
Application number, filing date18717637.523.04.2018
[2020/10]
WO2018EP60268
Priority number, dateEP2017016777124.04.2017         Original published format: EP 17167771
[2020/10]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018197377
Date:01.11.2018
Language:DE
[2018/44]
Type: A1 Application with search report 
No.:EP3615578
Date:04.03.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 01.11.2018 takes the place of the publication of the European patent application.
[2020/10]
Type: B1 Patent specification 
No.:EP3615578
Date:10.03.2021
Language:DE
[2021/10]
Type: B2 New European patent specification 
No.:EP3615578
Date:15.11.2023
Language:DE
[2023/46]
Search report(s)International search report - published on:EP01.11.2018
ClassificationIPC:C08F6/22, C08F279/04, C08L25/12, C08L55/02, C08L69/00
[2020/10]
CPC:
C08F279/04 (EP,KR,US); C08L51/04 (US); C08C1/12 (US);
C08F2/22 (KR); C08F212/08 (KR); C08F6/22 (EP,KR);
C08L25/12 (EP,KR); C08L25/14 (KR); C08L55/02 (KR);
C08L69/00 (EP); C08L2205/02 (US); C08L2207/53 (US) (-)
C-Set:
C08F6/22, C08L25/12 (EP);
C08F6/22, C08L55/02 (EP);
C08L25/12, C08L55/02, C08L83/04 (EP);
C08L69/00, C08L25/12, C08L55/02 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/10]
TitleGerman:VERBESSERTES VERFAHREN ZUR HERSTELLUNG VON ABS-PFROPFCOPOLYMEREN[2020/10]
English:IMPROVED PROCESS FOR PRODUCING ABS GRAFT COPOLYMERS[2020/10]
French:PROCÉDÉ AMÉLIORÉ DE PRODUCTION DE COPOLYMÈRES GREFFÉS D'ABS[2020/10]
Entry into regional phase08.11.2019National basic fee paid 
08.11.2019Designation fee(s) paid 
08.11.2019Examination fee paid 
Examination procedure08.11.2019Examination requested  [2020/10]
08.11.2019Date on which the examining division has become responsible
05.06.2020Amendment by applicant (claims and/or description)
15.10.2020Communication of intention to grant the patent
01.02.2021Fee for grant paid
01.02.2021Fee for publishing/printing paid
01.02.2021Receipt of the translation of the claim(s)
Opposition(s)Opponent(s)01  26.11.2021  30.11.2021  ADMISSIBLE
Elix Polymers, S.L.
Poligono Industrial
Ctra. de Vilaseca
La Pineda s/n
43110 La Canonja / ES
Opponent's representative
Sugrañes, S.L.P.
Calle Provenza 304
08008 Barcelona / ES
 [2022/01]
22.12.2021Invitation to proprietor to file observations on the notice of opposition
07.04.2022Reply of patent proprietor to notice(s) of opposition
10.05.2023Legal effect of interlocutory decision in opposition
10.05.2023Date of oral proceedings
26.05.2023Despatch of interlocutory decision in opposition
26.05.2023Despatch of minutes of oral proceedings
14.09.2023Despatch of communication that the patent will be maintained as amended
10.10.2023Fee for printing new specification paid
Fees paidRenewal fee
20.03.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.04.2018
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
TR10.03.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB23.04.2022
NL01.05.2022
AT23.04.2023
[2024/35]
Former [2024/29]HU23.04.2018
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
TR10.03.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB23.04.2022
NL01.05.2022
Former [2024/23]HU23.04.2018
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB23.04.2022
NL01.05.2022
Former [2023/33]HU23.04.2018
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB23.04.2022
NL01.05.2022
Former [2023/30]AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB23.04.2022
NL01.05.2022
Former [2023/08]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB23.04.2022
NL01.05.2022
Former [2022/34]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/23]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE23.04.2021
LU23.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/21]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE23.04.2021
LU23.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
IS24.12.2021
Former [2022/11]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
LU23.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
IS24.12.2021
Former [2022/10]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
LU23.04.2021
CH30.04.2021
LI30.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
IS24.12.2021
Former [2022/08]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
LU23.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/07]AL10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
LU23.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/04]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
LU23.04.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/52]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/51]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/50]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2021/48]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/46]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/38]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/37]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/36]FI10.03.2021
HR10.03.2021
LT10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/35]FI10.03.2021
HR10.03.2021
LT10.03.2021
NO10.06.2021
Former [2021/33]FI10.03.2021
LT10.03.2021
NO10.06.2021
Cited inInternational search[AD]DE4015296  (BAYER AG [DE]) [AD] 1-15 * the whole document *;
 [A]JP3390625B  (MITSUI CHEMICALS INC) [A] 1-15 * the whole document *;
 [AD]DE102006044270  (LANXESS DEUTSCHLAND GMBH [DE]) [AD] 1-15* the whole document *;
 [X]WO2014170406  (STYROLUTION GROUP GMBH [DE]) [X] 13-15 * page 26, lines 22-24 * * page 34, line 26 - line 28 * * page 35, line 24 * * table 4 *
by applicantDE656780
 DE1495626
 DE2232877
 DE2420358
 DE2703376
 DE2714544
 DE2724360
 DE3000610
 DE2909518
 EP0022200
 DE3639904
 DE3832396
 DE3913509
 DE4015296
 EP0734825
 EP0768157
 EP0867463
 DE19713509
 DE10008420
 WO03099926
 WO2008020012
 DE102006044270
 WO2012022710
 US8299175
 EP2584001
 EP2606073
 WO2014170407
 WO2017093468
    - W. SCHOLTAN; H. LANGE, Kolloid Z. u. Z. Polymere, (19720000), vol. 250, pages 782 - 796
    - HOUBEN-WEYL, Methoden der Organischen Chemie, Makromolekulare Stoffe, Thieme Verlag, (19610000), page 307
    - HOUBEN-WEYL, Methoden der Organischen Chemie, Makromolekulare Stoffe, Thieme Verlag, (19610000), page 339
    - K. KIRCHNER; H. SCHLAPKOHL, "The Formation of Oligomers in the Thermal Copolymerisation of the Styrene/Acrylonitrile-System", Makromol. Chem., (19760000), vol. 177, doi:doi:10.1002/macp.1976.021770711, pages 2031 - 2042, XP001027238

DOI:   http://dx.doi.org/10.1002/macp.1976.021770711
OppositionGB1335353
 GB1418228
 DE2656780
 US5314990
 US2003092836
 US2007020553
 WO2008034724
 WO2015197442
 GB133535
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.