blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3601625

EP3601625 - PROCESS FOR PREPARING IRON- AND CHROME-CONTAINING PARTICLES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.03.2022
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  16.04.2021
FormerGrant of patent is intended
Status updated on  16.12.2020
FormerRequest for examination was made
Status updated on  03.01.2020
FormerThe international publication has been made
Status updated on  29.09.2018
Formerunknown
Status updated on  04.05.2018
Most recent event   Tooltip10.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 12.06.2024  [2024/24]
Applicant(s)For all designated states
BROTHER GROUP (HONG KONG) LIMITED
22/F OVEST NO. 77 WING LOK STREET
SHEUNG WAN
HONG KONG / CN
[2020/45]
Former [2020/06]For all designated states
Lanxess Deutschland GmbH
Kennedyplatz 1
50569 Köln / DE
Inventor(s)01 / BOLL, Matthias
Miltzstraße 1
51061 Köln / DE
02 / ZAMPIERI, Ulrike
35 Cycad Crescent
Two Rivers Country Estate Peter Road
Tres Jolie
1724 Roodepoort / ZA
03 / NELL, Johannes
49 Duiker Avenue Randpark Ridge
2194 Randburg / ZA
 [2020/06]
Representative(s)Dr. Gassner & Partner mbB
Wetterkreuz 3
91058 Erlangen / DE
[2021/20]
Application number, filing date18718702.619.03.2018
[2020/06]
WO2018EP56889
Priority number, dateEP2017016206321.03.2017         Original published format: EP 17162063
[2020/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018172284
Date:27.09.2018
Language:EN
[2018/39]
Type: A1 Application with search report 
No.:EP3601625
Date:05.02.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 27.09.2018 takes the place of the publication of the European patent application.
[2020/06]
Type: B1 Patent specification 
No.:EP3601625
Date:19.05.2021
Language:EN
[2021/20]
Search report(s)International search report - published on:EP27.09.2018
ClassificationIPC:C22B1/00, C22B5/10, C22B7/00, C22C35/00
[2020/06]
CPC:
C22B1/00 (EP,EA); C22B5/10 (EP,EA); C22B7/001 (EP,EA);
C22C35/00 (EP,EA); Y02P10/20 (EP,EA)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/06]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON EISEN- UND CHROMHALTIGEN PARTIKELN[2020/06]
English:PROCESS FOR PREPARING IRON- AND CHROME-CONTAINING PARTICLES[2020/06]
French:PROCÉDÉ POUR PRÉPARER DES PARTICULES CONTENANT DU FER ET DU CHROME[2021/01]
Former [2020/06]PROCÉDÉ DE PRÉPARATION DE PARTICULES CONTENANT DU FER ET DU CHROME
Entry into regional phase21.10.2019National basic fee paid 
21.10.2019Designation fee(s) paid 
21.10.2019Examination fee paid 
Examination procedure21.10.2019Examination requested  [2020/06]
21.10.2019Date on which the examining division has become responsible
08.05.2020Amendment by applicant (claims and/or description)
17.12.2020Communication of intention to grant the patent
08.04.2021Fee for grant paid
08.04.2021Fee for publishing/printing paid
08.04.2021Receipt of the translation of the claim(s)
Opposition(s)22.02.2022No opposition filed within time limit [2022/17]
Fees paidRenewal fee
08.05.2020Renewal fee patent year 03
24.03.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.03.2018
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
[2024/24]
Former [2024/23]AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2024/20]AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/47]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/36]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
IT19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/29]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/26]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/23]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/10]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
IS22.12.2021
Former [2022/09]AT19.05.2021
CZ19.05.2021
DK19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/08]AT19.05.2021
CZ19.05.2021
DK19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/07]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/04]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/52]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/51]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/50]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
Former [2021/49]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
Former [2021/46]AT19.05.2021
FI19.05.2021
LT19.05.2021
BG19.08.2021
Cited inInternational search[X]GB1459873  (CABOT CORP) [X] 10 * table 1 *;
 [A]US4500350  (MEUSSDOERFFER JOHANN-NIKOLAUS [DE], et al) [A] 1-9 * the whole document *;
 [A]US2004086438  (SREERAM KALARICAL JANARDHANAN [IN], et al) [A] 1-15 * the whole document *;
 [XI]WO2008142704  (TATA STEEL LTD [IN], et al) [X] 10,14,15 * the whole document * [I] 11-13;
 [XI]WO2013011521  (TATA STEEL LTD [IN], et al) [X] 10,14,15 * the whole document * [I] 11-13;
 [XAI]  - DEQING ET AL, "Sintering behaviours of chromite fines and the consolidation mechanism", INTERNATIONAL JOURNAL OF MINERAL PROCESSING, ELSEVIER SCIENCE PUBLISHERS, AMSTERDAM, NL, (20071117), vol. 86, no. 1-4, ISSN 0301-7516, pages 58 - 67, XP022501238 [X] 1,3,6,8 * the whole document * [A] 10-15 [I] 4,5,7,9
 [XAI]  - DWARAPUDI, S. ET AL, "Development of Cold Bonded Chromite Pellets for Ferrochrome Production in Submerged Arc Furnace", ISIJ INTERNATIONAL, (2013), vol. 53, no. 1, pages 9 - 17, XP002773408 [X] 1,3,5,6,8 * the whole document * [A] 10-15 [I] 4,7,9

DOI:   http://dx.doi.org/10.2355/isijinternational.53.9
 [A]  - AGARWAL, S. ET AL, "Development of Chromite Sinterfrom Ultra-Fine Chromite Ore by Direct Sintering", ISIJ INTERNATIONAL, (2014), vol. 54, no. 3, pages 559 - 566, XP002773409 [A] 1,3-15
 [X]  - VARMA, O.P., AND JAIPURIAR, A.M., "CHROME-ORE: ITS STRATEGIC IMPORTANCE, DOMESTIC RESOURCES & GAPS, LONG-TERM PROJECTIONS AND FUTURE OUTLOOK", (1976), pages 271 - 272, URL: http://www.insa.nic.in/writereaddata/UpLoadedFiles/PINSA/Vol42A_1976_4_Art02.pdf, (20170524), XP002773410 [X] 10 * table 1 *
 [A]  - WANG ET AL, "A new method for the treatment of chromite ore processing residues", JOURNAL OF HAZARDOUS MATERIALS, ELSEVIER, AMSTERDAM, NL, (20071012), vol. 149, no. 2, doi:10.1016/J.JHAZMAT.2007.04.009, ISSN 0304-3894, pages 440 - 444, XP022281720 [A] 1-15 * the whole document *

DOI:   http://dx.doi.org/10.1016/j.jhazmat.2007.04.009
by applicantZA200403429
 WO2014006196
 WO2016074878
    - Minerals Engineering, (20120000), vol. 34, pages 55 - 62
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.