EP3631560 - OPTICAL WAVEGUIDE WITH COHERENT LIGHT SOURCE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 21.12.2021 | ||
Former | Request for examination was made Status updated on 06.03.2020 | ||
Former | The international publication has been made Status updated on 01.12.2018 | ||
Former | unknown Status updated on 25.05.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052-6399 / US | [2021/45] |
Former [2020/15] | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052-6399 / US | Inventor(s) | 01 /
LOWNEY, Joseph Daniel MICROSOFT TECHNOLOGY LICENSING LLC One Microsoft Way Redmond, Washington 98052-6399 / US | 02 /
WALL, Richard Andrew MICROSOFT TECHNOLOGY LICENSING LLC One Microsoft Way Redmond, Washington 98052-6399 / US | [2020/15] | Representative(s) | CMS Cameron McKenna Nabarro Olswang LLP Cannon Place 78 Cannon Street London EC4N 6AF / GB | [2020/15] | Application number, filing date | 18724426.4 | 27.04.2018 | [2020/15] | WO2018US29674 | Priority number, date | US201715607271 | 26.05.2017 Original published format: US201715607271 | [2020/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018217403 | Date: | 29.11.2018 | Language: | EN | [2018/48] | Type: | A1 Application with search report | No.: | EP3631560 | Date: | 08.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.11.2018 takes the place of the publication of the European patent application. | [2020/15] | Type: | B1 Patent specification | No.: | EP3631560 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | EP | 29.11.2018 | Classification | IPC: | G02B27/01, // G02B6/34 | [2021/46] | CPC: |
G02B27/0172 (EP,US);
G02B27/0101 (US);
G02B1/10 (US);
G02B6/122 (US);
G02B2027/0118 (US);
G02B27/01 (US);
G02B6/34 (EP,US)
(-)
|
Former IPC [2020/15] | G02B27/01, G02B6/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | LICHTWELLENLEITER MIT KOHÄRENTER LICHTQUELLE | [2020/15] | English: | OPTICAL WAVEGUIDE WITH COHERENT LIGHT SOURCE | [2020/15] | French: | GUIDE D'ONDES OPTIQUE À SOURCE DE LUMIÈRE COHÉRENTE | [2020/15] | Entry into regional phase | 23.10.2019 | National basic fee paid | 23.10.2019 | Designation fee(s) paid | 23.10.2019 | Examination fee paid | Examination procedure | 23.10.2019 | Examination requested [2020/15] | 23.10.2019 | Date on which the examining division has become responsible | 05.06.2020 | Amendment by applicant (claims and/or description) | 22.12.2021 | Communication of intention to grant the patent | 15.03.2022 | Fee for grant paid | 15.03.2022 | Fee for publishing/printing paid | 15.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 31.03.2020 | Renewal fee patent year 03 | 15.04.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.04.2018 | AL | 27.04.2022 | AT | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IE | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LU | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | MT | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | TR | 27.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | BG | 27.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | [2024/44] |
Former [2024/29] | HU | 27.04.2018 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IE | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
TR | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/24] | HU | 27.04.2018 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IE | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/23] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IE | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/20] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IE | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/11] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IE | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IE | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/20] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IE | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/10] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/08] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LU | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
SE | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | Cited in | International search | [Y]US2011044579 (TRAVIS ADRIAN [US], et al) [Y] 6,7,10-15 * paragraph [0020]; figure 3 *; | [Y]US2014140653 (BROWN ROBERT D [US], et al) [Y] 8 * paragraph [0009], lines 12,13;; figure 10 ** paragraph [0147], lines 2-4,6 *; | [XYI]WO2017034765 (MICROSOFT TECHNOLOGY LICENSING LLC [US]) [X] 1-3,9 * page 1, line 5 - line 9 * * page 1, line 14 * * page 3, line 15 * * page 4, lines 19,20; figures 3,4 * * page 5, line 28 - line 29 * * page 7, line 15 * * page 13, last two lines * [Y] 6-8,10-15 [I] 4,5 |