EP3635310 - REFRIGERATION SYSTEM AND FALL FILM EVAPORATOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.06.2024 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 30.06.2023 | ||
Former | Grant of patent is intended Status updated on 27.02.2023 | ||
Former | Examination is in progress Status updated on 17.02.2022 | ||
Former | Request for examination was made Status updated on 13.03.2020 | ||
Former | The international publication has been made Status updated on 23.11.2018 | ||
Former | unknown Status updated on 28.05.2018 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Carrier Corporation 13995 Pasteur Boulevard Palm Beach Gardens, FL 33418 / US | [2024/23] |
Former [2020/16] | For all designated states Carrier Corporation 17900 Beeline Highway Jupiter, FL 33478 / US | Inventor(s) | 01 /
GUO, Junjie 3239 Shenjiang Road Shanghai 201206 / CN | [2020/16] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2020/16] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 18724767.1 | 01.05.2018 | [2020/16] | WO2018US30427 | Priority number, date | CN201710357044 | 19.05.2017 Original published format: CN201710357044 | [2020/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018212983 | Date: | 22.11.2018 | Language: | EN | [2018/47] | Type: | A1 Application with search report | No.: | EP3635310 | Date: | 15.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.11.2018 takes the place of the publication of the European patent application. | [2020/16] | Type: | B1 Patent specification | No.: | EP3635310 | Date: | 02.08.2023 | Language: | EN | [2023/31] | Search report(s) | International search report - published on: | EP | 22.11.2018 | Classification | IPC: | F25B31/00, F25B39/02, F25B43/02 | [2020/16] | CPC: |
F25B39/02 (EP);
F25B41/00 (CN,US);
F28D5/02 (EP,US);
F25B31/004 (EP,US);
F25B39/028 (CN,US);
F25B43/02 (EP,US);
F25B2339/021 (EP,US);
F25B2339/0242 (CN);
F25B2341/0016 (US);
F28D2021/0071 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | KÜHLSYSTEM UND FALLFILMVERDAMPFER | [2020/16] | English: | REFRIGERATION SYSTEM AND FALL FILM EVAPORATOR | [2020/16] | French: | SYSTÈME DE RÉFRIGÉRATION ET ÉVAPORATEUR À FILM TOMBANT | [2020/16] | Entry into regional phase | 09.12.2019 | National basic fee paid | 09.12.2019 | Designation fee(s) paid | 09.12.2019 | Examination fee paid | Examination procedure | 09.12.2019 | Examination requested [2020/16] | 09.12.2019 | Date on which the examining division has become responsible | 06.07.2020 | Amendment by applicant (claims and/or description) | 16.02.2022 | Despatch of a communication from the examining division (Time limit: M04) | 21.06.2022 | Reply to a communication from the examining division | 28.02.2023 | Communication of intention to grant the patent | 27.06.2023 | Fee for grant paid | 27.06.2023 | Fee for publishing/printing paid | 27.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 03.05.2024 | No opposition filed within time limit [2024/28] | Fees paid | Renewal fee | 17.03.2020 | Renewal fee patent year 03 | 19.05.2021 | Renewal fee patent year 04 | 18.05.2022 | Renewal fee patent year 05 | 23.05.2023 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 02.08.2023 | BG | 02.08.2023 | CZ | 02.08.2023 | DK | 02.08.2023 | EE | 02.08.2023 | FI | 02.08.2023 | HR | 02.08.2023 | LT | 02.08.2023 | LV | 02.08.2023 | PL | 02.08.2023 | RO | 02.08.2023 | RS | 02.08.2023 | SE | 02.08.2023 | SI | 02.08.2023 | SK | 02.08.2023 | SM | 02.08.2023 | NO | 02.11.2023 | GR | 03.11.2023 | IS | 02.12.2023 | PT | 04.12.2023 | [2024/51] |
Former [2024/36] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SI | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/23] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/22] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/20] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/10] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
PL | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/09] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
LT | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/08] | LT | 02.08.2023 | |
NO | 02.11.2023 | ||
GR | 03.11.2023 | Cited in | International search | [XYI]US5561987 (HARTFIELD JON P [US], et al) [X] 1-3,6,12,16,19,23 * the whole document * [Y] 13,14 [I] 4,5,7-11,15,17,18,20-22; | [A]US5761914 (CAREY MICHAEL D [US], et al) [A] 1-22* the whole document *; | [Y]US2011023515 (KOPKO WILLIAM L [US], et al) [Y] 13,14 * the whole document * |