EP3610133 - TURBINE BLADE HAVING AN IMPROVED STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.11.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 26.11.2021 | ||
Former | Grant of patent is intended Status updated on 19.07.2021 | ||
Former | Examination is in progress Status updated on 17.09.2020 | ||
Former | Request for examination was made Status updated on 17.01.2020 | ||
Former | The international publication has been made Status updated on 20.10.2018 | ||
Former | unknown Status updated on 15.06.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Safran 2 boulevard du Général Martial Valin 75015 Paris / FR | [2020/08] | Inventor(s) | 01 /
PAQUIN, Sylvain c/o SAFRAN AIRCRAFT ENGINES PI (AJI) Rond-point René Ravaud-Réau 77550 Moissy-Cramayel Cedex / FR | 02 /
CARIOU, Romain Pierre c/o SAFRAN AIRCRAFT ENGINES PI (AJI) Rond-point René Ravaud-Réau 77550 Moissy-Cramayel Cedex / FR | 03 /
FLAMME, Thomas Michel c/o SAFRAN AIRCRAFT ENGINES PI (AJI) Rond-point René Ravaud-Réau 77550 Moissy-Cramayel Cedex / FR | 04 /
ROLLINGER, Adrien Bernard Vincent c/o SAFRAN AIRCRAFT ENGINES PI (AJI) Rond-point René Ravaud-Réau 77550 Moissy-Cramayel Cedex / FR | [2020/08] | Representative(s) | Cabinet Beau de Loménie 158, rue de l'Université 75340 Paris Cedex 07 / FR | [2020/08] | Application number, filing date | 18728683.6 | 10.04.2018 | [2020/08] | WO2018FR00081 | Priority number, date | FR20170000390 | 10.04.2017 Original published format: FR 1700390 | [2020/08] | Filing language | FR | Procedural language | FR | Publication | Type: | A2 Application without search report | No.: | WO2018189434 | Date: | 18.10.2018 | Language: | FR | [2018/42] | Type: | A2 Application without search report | No.: | EP3610133 | Date: | 19.02.2020 | Language: | FR | The application published by WIPO in one of the EPO official languages on 18.10.2018 takes the place of the publication of the European patent application. | [2020/08] | Type: | B1 Patent specification | No.: | EP3610133 | Date: | 29.12.2021 | Language: | FR | [2021/52] | Search report(s) | International search report - published on: | EP | 20.12.2018 | Classification | IPC: | F01D5/18 | [2020/08] | CPC: |
F01D5/187 (EP,US);
F05D2220/32 (US);
F05D2250/185 (EP);
Y02T50/60 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | TURBINENSCHAUFEL MIT VERBESSERTER STRUKTUR | [2020/08] | English: | TURBINE BLADE HAVING AN IMPROVED STRUCTURE | [2020/08] | French: | AUBE DE TURBINE PRÉSENTANT UNE STRUCTURE AMÉLIORÉE | [2020/08] | Entry into regional phase | 07.11.2019 | National basic fee paid | 07.11.2019 | Designation fee(s) paid | 07.11.2019 | Examination fee paid | Examination procedure | 07.11.2019 | Amendment by applicant (claims and/or description) | 07.11.2019 | Examination requested [2020/08] | 07.11.2019 | Date on which the examining division has become responsible | 16.09.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.01.2021 | Reply to a communication from the examining division | 20.07.2021 | Communication of intention to grant the patent | 19.11.2021 | Fee for grant paid | 19.11.2021 | Fee for publishing/printing paid | 19.11.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 30.09.2022 | No opposition filed within time limit [2022/49] | Fees paid | Renewal fee | 17.03.2020 | Renewal fee patent year 03 | 21.04.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.04.2018 | AL | 29.12.2021 | AT | 29.12.2021 | CY | 29.12.2021 | CZ | 29.12.2021 | DK | 29.12.2021 | EE | 29.12.2021 | ES | 29.12.2021 | FI | 29.12.2021 | HR | 29.12.2021 | IT | 29.12.2021 | LT | 29.12.2021 | LV | 29.12.2021 | MC | 29.12.2021 | MK | 29.12.2021 | MT | 29.12.2021 | NL | 29.12.2021 | PL | 29.12.2021 | RO | 29.12.2021 | RS | 29.12.2021 | SE | 29.12.2021 | SI | 29.12.2021 | SK | 29.12.2021 | SM | 29.12.2021 | TR | 29.12.2021 | BG | 29.03.2022 | NO | 29.03.2022 | GR | 30.03.2022 | IE | 10.04.2022 | LU | 10.04.2022 | IS | 29.04.2022 | PT | 29.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | [2024/44] |
Former [2024/29] | HU | 10.04.2018 | |
AL | 29.12.2021 | ||
AT | 29.12.2021 | ||
CY | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
IT | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
MK | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
TR | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IE | 10.04.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2024/24] | HU | 10.04.2018 | |
AL | 29.12.2021 | ||
AT | 29.12.2021 | ||
CY | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
IT | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
MK | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IE | 10.04.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2024/23] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CY | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
IT | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
MK | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IE | 10.04.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2024/20] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CY | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
IT | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IE | 10.04.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/27] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
IT | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IE | 10.04.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/20] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IE | 10.04.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/10] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SI | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/09] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
Former [2023/08] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
LU | 10.04.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2023/06] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
MC | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/49] | AL | 29.12.2021 | |
AT | 29.12.2021 | ||
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/46] | AT | 29.12.2021 | |
CZ | 29.12.2021 | ||
DK | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/42] | AT | 29.12.2021 | |
CZ | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
IS | 29.04.2022 | ||
PT | 29.04.2022 | ||
Former [2022/36] | AT | 29.12.2021 | |
CZ | 29.12.2021 | ||
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
PL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
PT | 29.04.2022 | ||
Former [2022/35] | CZ | 29.12.2021 | |
EE | 29.12.2021 | ||
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SK | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
PT | 29.04.2022 | ||
Former [2022/34] | EE | 29.12.2021 | |
ES | 29.12.2021 | ||
FI | 29.12.2021 | ||
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
RO | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
PT | 29.04.2022 | ||
Former [2022/33] | FI | 29.12.2021 | |
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
SM | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
Former [2022/30] | FI | 29.12.2021 | |
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
NL | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
Former [2022/25] | FI | 29.12.2021 | |
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
BG | 29.03.2022 | ||
NO | 29.03.2022 | ||
GR | 30.03.2022 | ||
Former [2022/24] | FI | 29.12.2021 | |
HR | 29.12.2021 | ||
LT | 29.12.2021 | ||
LV | 29.12.2021 | ||
RS | 29.12.2021 | ||
SE | 29.12.2021 | ||
BG | 29.03.2022 | ||
GR | 30.03.2022 | ||
Former [2022/22] | FI | 29.12.2021 | |
LT | 29.12.2021 | ||
RS | 29.12.2021 | ||
BG | 29.03.2022 | ||
Former [2022/21] | RS | 29.12.2021 | |
BG | 29.03.2022 | ||
Former [2022/19] | BG | 29.03.2022 | Cited in | International search | [XYI]EP0562944 (SNECMA [FR]) [X] 1,2,9 * column 3, line 32 - column 7, line 52; figures 1-7 * [Y] 8 [I] 3; | [Y]US2010080687 (VANCE STEVEN J [US]) [Y] 8 * page 2, paragraph 24 - page 3, paragraph 30; figures 5,6 *; | [A]WO2016151234 (SAFRAN [FR], et al) [A] 1-9* page 6, line 28 - page 7, line 2; figure 4b * | by applicant | EP1741875 |