EP3577347 - TURBO-COMPRESSOR WITH RETURN FLOW CHANNELS [Right-click to bookmark this link] | |||
Former [2019/50] | RETURN CHANNELS FOR A MULTI-STAGE TURBOCOMPRESSOR | ||
[2021/52] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 03.01.2022 | ||
Former | Request for examination was made Status updated on 08.11.2019 | ||
Former | The international publication has been made Status updated on 04.01.2019 | ||
Former | unknown Status updated on 20.06.2018 | Most recent event Tooltip | 10.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 12.06.2024 [2024/24] | Applicant(s) | For all designated states EBM-Papst Mulfingen GmbH&CO. KG Bachmühle 2 74673 Mulfingen / DE | [2019/50] | Inventor(s) | 01 /
ENGERT, Markus Meisenweg 11 97922 Lauda-Königshofen / DE | 02 /
KLOSTERMANN, Angelika Geranienweg 11 74653 Gaisbach / DE | 03 /
CONRAD, Daniel Hohenloherstraße 25 74243 Langenbrettach / DE | [2019/50] | Representative(s) | Staeger & Sperling Partnerschaftsgesellschaft mbB Sonnenstraße 19 80331 München / DE | [2019/50] | Application number, filing date | 18729651.2 | 05.06.2018 | [2019/50] | WO2018EP64772 | Priority number, date | DE201710114232 | 27.06.2017 Original published format: DE102017114232 | [2019/50] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019001910 | Date: | 03.01.2019 | Language: | DE | [2019/01] | Type: | A1 Application with search report | No.: | EP3577347 | Date: | 11.12.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 03.01.2019 takes the place of the publication of the European patent application. | [2019/50] | Type: | B1 Patent specification | No.: | EP3577347 | Date: | 27.04.2022 | Language: | DE | [2022/17] | Search report(s) | International search report - published on: | EP | 03.01.2019 | Classification | IPC: | F04D29/44, F04D17/12 | [2019/50] | CPC: |
F04D29/444 (EP,US);
F04D17/12 (EP);
F04D17/122 (US);
F04D29/441 (EP);
F04D29/30 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/50] | Title | German: | TURBOVERDICHTER MIT RÜCKFÜHRSTÖMUNGSKANÄLEN | [2021/52] | English: | TURBO-COMPRESSOR WITH RETURN FLOW CHANNELS | [2021/52] | French: | TURBO-COMPRESSEUR AVEC CANAUX DE RETOUR DE FLUIDE | [2021/52] |
Former [2019/50] | RÜCKFÜHRSTÖMUNGSKANÄLE FÜR EINEN MEHRSTUFIGEN TURBOVERDICHTER | ||
Former [2019/50] | RETURN CHANNELS FOR A MULTI-STAGE TURBOCOMPRESSOR | ||
Former [2019/50] | CANAUX D'ÉCOULEMENT DE RETOUR POUR TURBOCOMPRESSEUR À PLUSIEURS ÉTAGES | Entry into regional phase | 03.09.2019 | National basic fee paid | 03.09.2019 | Designation fee(s) paid | 03.09.2019 | Examination fee paid | Examination procedure | 03.09.2019 | Examination requested [2019/50] | 03.09.2019 | Date on which the examining division has become responsible | 03.03.2020 | Amendment by applicant (claims and/or description) | 04.01.2022 | Communication of intention to grant the patent | 03.03.2022 | Fee for grant paid | 03.03.2022 | Fee for publishing/printing paid | 16.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 25.06.2020 | Renewal fee patent year 03 | 28.06.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.06.2018 | AL | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | IE | 05.06.2022 | LU | 05.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | LI | 30.06.2022 | BG | 27.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | [2024/24] |
Former [2024/23] | AL | 27.04.2022 | |
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 05.06.2022 | ||
LU | 05.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/20] | AL | 27.04.2022 | |
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 05.06.2022 | ||
LU | 05.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 05.06.2022 | ||
LU | 05.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/21] | AL | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 05.06.2022 | ||
LU | 05.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/20] | AL | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 05.06.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | CZ | 27.04.2022 | |
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/08] | DK | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | DK | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | ES | 27.04.2022 | |
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | ES | 27.04.2022 | |
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | ES | 27.04.2022 | |
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | ES | 27.04.2022 | |
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
SE | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | Cited in | International search | [X]US2748713 (ALFRED BUCHI) [X] 1-3,5,8-11,17 * column 3, lines 38-41 * * figures 4, 5 *; | [XI]US2900126 (DANGERFIELD KENNETH J) [X] 1-3,5-7,9-12,14,15,17 * figures 1, 2 * [I] 8,13; | [XI]US2007036662 (PESOLA FABIO [IT], et al) [X] 1-5,9,10,17 * figures 1-5 * [I] 6-8,11,13-15; | [XI]US2010319343 (ARNOLD STEVEN D [US], et al) [X] 1-3,5-7,9-11,16,17 * figures 3, 8a, 8b * * paragraphs [0071] - [0074] * [I] 8,12-15; | [XI]WO2016149728 (AVL LIST GMBH [AT]) [X] 1-5,9,10,17 * figures 1-3 *[I] 6-8,11-15 | Examination | US984189 | by applicant | EP2918848 | EP3056741 |